Enhancing and Improving the Grid: Midwestern Substation Delivery

Challenge

Faced with both an aging electric grid and increasing energy demands, a leading utility in America’s heartland decided to retire an old substation and build a next generation replacement.

Solution

TRC provided complete, start-to-finish engineering for the complex 138 kV substation, performing conceptual studies, developing equipment and materials specifications for substation operations, designing the substation and creating protection and control design and remote terminal unit (RTU) configurations. The new station connected to four different transmission lines – two 138 kV, one 69 kV and one 46 kV – and one 12 kV and two 34 kV distribution systems

Result

Customers served by the new, state-of-the-art substation now receive more consistent, reliable power with fewer outages.

Looking for effective solutions to your problems?

Turn to the experts at TRC.

By clicking "Accept", you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. Read our Privacy Policy.