Putnam County, West Virginia
TRC Assessed Options For Widening A Nearly 4-mile Stretch Of Interstate Highway As Part Of Its 5-year Transportation Improvement Plan.
TRC was the Prime Consultant for this project which consisted of the study and preparation of a design report for widening Interstate 64 (I-64) to six lanes for approximately 3.8 miles from a proposed interchange with US 35 to the 40th Street Bridge. With an estimated construction cost of over $125 million, this section of widening is complicated by the presence of a major bridge crossing of the Kanawha River, with alternatives for an additional structure being looked at which are both downstream and upstream adjacent to the existing bridge. In addition to this major bridge crossing, this section of the study also addressed six additional bridges and two interchanges that would need to be reconfigured to accommodate the 6-laning of the interstate.
The existing Kanawha River Bridge, which is a 3-span through cantilever truss with a main span of 562’, would be utilized for traffic on I-64 in one direction, while a new bridge crossing will be constructed to carry traffic in the other direction. A traffic analysis of the widening was also performed, along with the development of an interchange modification report for the two interchanges within the study area. The resulting study report provided a description of the potential alignments and carefully took into consideration such issues as design criteria, traffic volumes, right-of-way requirements, environmental impacts, maintenance of traffic during construction, and the construction costs associated with each study alternative. Key TRC staff members participated with the DOH throughout the public involvement process, which included the preparation of all handouts and displays.
Upon completion of the Design Study, TRC was selected to prepare and develop the preliminary contract plans for this project in order that the project can be possibly let as either a Public Private Partnership or Design/Build project. TRC is currently preparing the NEPA document, with the key to environmental clearance being the completion of a site assessment for potentially hazardous sites within the project limits.
- Client: West Virginia Division of Highways
- Project Location: Putnam County, WV
Relevant Services
Related Projects
Discover the success we’ve had with helping our clients execute major projects and make a meaningful impact on their local communities.
Caltrans District 12 Roadway Design, Project Development and Construction
Caltrans District 12’s $62 million project to improve SR-91 in Orange County required an expedited delivery of Project Approval/Environmental Document …
Caltrans District 7 Pavement Rehab Project
Caltrans District 7 undertook a $7 million project to rehabilitate pavement on SR-33 and SR-150 in the cities of Ojai, …
I-10 Alabama Street Interchange Improvements
When the San Bernardino County Transportation Authority (SBCTA) undertook an $11 million project to enhance traffic operation and alleviate traffic …
I-10 Express Lanes Design-Build
When the San Bernardino County Transportation Authority (SBCTA) undertook a $500 million project to construct two express lanes in each …
I-105 Express Lanes Plans, Specifications and Estimates
During the design and construction of a $660 million Los Angeles Metro project to implement a new median lane in …
Sharing Our Perspectives
Our practitioners share their insights and perspectives on the trends and challenges shaping the market.
EPA Releases Clean Water Act Facility Response Plan Rule
June 19, 2024
This Regulatory Update is the first in a series summarizing the Rule and how it may affect your facility.
PM2.5 Annual NAAQS Revised
May 7, 2024
The U.S. EPA issued a final rule based on its reconsideration of its 2020 decision to retain the primary and secondary National Ambient Air Quality Standards (NAAQS) for particulate matter (PM) without revision.
What You Need to Know About MSHA’s Final Rule on Crystalline Silica Dust
April 8, 2024
Regulatory Changes Will Impact Mine Operators and Better Protect Employee Health and Safety.
Changes to EPA’s Risk Management Program (RMP) Regulations Are Here
April 3, 2024
Changes to the Risk Management Program (RMP) regulations were signed into a final rule on February 27, 2024, by EPA Administrator Michael S. Regan.
Changes to EPA’s Risk Management Program (RMP) Regulations Are Coming
April 14, 2023
Changes to the Risk Management Program (RMP) regulations were signed into a final rule on February 27, 2024, by EPA Administrator Michael S. Regan.
Phase I ESA ASTM Standard Update: The Wait is Over
December 21, 2022
The USEPA published a Final Rule making the ASTM E1527-21 Phase I ESA standard AAI compliant.
Proactive Enforcement is Key in the EPA FY2022-2026 Strategy
October 19, 2022
A core element of the EPA FY2022-2026 Strategic Plan focuses on environmental compliance.
Preparing for EPA Inspections in Environmental Justice Communities
October 4, 2022
The EPA Office of Enforcement and Compliance Assurance Have Expanded Goals to Strengthen Enforcement and Protections Within EJ Communities
New National Emerging Contaminants Research Initiative
September 12, 2022
The Executive Office of the President of the United States announced a National Emerging Contaminant Research Initiative
Climate Action and Environmental Justice are at the Forefront of EPA’s Strategic Plan
June 14, 2022
The EPA issued its Fiscal Year 2022-2026 Strategic Plan. Although the strategic plans emphases often change with administrations, we can be reasonably certain that the Plan reflects priorities through 2024.
CCR Removal and Its Effects on Soil and Groundwater Geochemistry
October 25, 2021
Many utilities are implementing corrective action at coal combustion residual (CCR) surface impoundments under Federal or State CCR Regulations, with implications for groundwater protection standards.
NJDEP Implements New Jersey Environmental Justice Law Through Administrative Order
October 5, 2021
On September 22, 2021, the New Jersey Department of Environmental Protection (NJDEP) Commissioner announced the issuance of Administrative Order (AO) No. 2021-25 to implement New Jersey’s Environmental Justice (EJ) Law. This order is effective immediately, and applicants seeking to site new major source facilities, renew major source permits or expand existing facilities with major source permits (e.g., Title V air permits) in overburdened communities are affected. There are more than 4.5 million people that live within 331 municipalities that are overburdened communities in the state of New Jersey.
OSHA’s Call for Comments on Mechanical Power Press Standard Changes
September 30, 2021
OSHA has recently published a call for comment regarding mechanical power presses. The reason behind OSHA’s request is that the American National Standards Institute (ANSI) consensus standard for mechanical power presses has been updated numerous times since the implementation of OSHA’s standard.
Managing EHS & ESG Risks Through Integrated Systems Today and Beyond
July 22, 2021
It has been more than 50 years since the development and establishment of the federal Environmental Protection Agency (EPA) and the federal Occupational Safety & Health Administration (OSHA) which were formed to protect our environment and workplaces across the United States. Significant laws, policies and regulations followed to establish the “regulatory programs” that all applicable businesses and entities must address and meet to ensure these compliance-driven legislative programs would create a foundation to protect our society.
EPA Resource Conservation & Recovery Act (RCRA) Corrective Action (CA)
January 11, 2021
The EPA RCRA Corrective Action (CA) Program recently provides a review and update on CA set in 2004 and new CA set for 2030.
EPA continues to aggressively address PFAS wastewater with two new strategies
January 4, 2021
EPA takes steps toward PFAS wastewater and storm water permitting, and analytical methods for testing.
2020 TSCA Chemical Data Reporting (CDR)
December 7, 2020
Earlier this year, EPA revised the CDR rule to reflect the 2016 amendments to TSCA, including changes for foreign-owned businesses and the reporting responsibilities of suppliers and contractors, as well as an exemption for small businesses.
Ecological Risk of PFAS from AFFF-Impacted Sites
June 30, 2020
The facts on evaluating exposure to wildlife
TRC Chosen to Provide Array of Integrated Services on Midship Pipeline Project
August 28, 2018
TRC has been awarded contracts for environmental consulting, engineering and field services and another for stem-to-stern Engineer, Procure and Construct (EPC) contract for three compressor stations.