Site loading image

Texas

Natural Gas Pipeline and Facilities Routing, Constructability, Engineering and Field Solutions

Our technology, engineering and field services are supporting our client to supply 1.4 BCF of natural gas to a LNG export facility via a 64 mile 36” pipeline with one midpoint 50,000 HP compressor station.

We managed all aspects of the project including:

  • Required documentation and FERC filings
  • Early stage routing and constructability utilizing proprietary routing technology with field verification
  • Right of Way and land permission for preliminary and environmental surveys

The projected is expected to be in service in 2018.

By employing our routing technology, the client had a defensible route very early in the project life cycle. This facilitated permitting and reduced the time it would have taken via a traditional “desktop” study.

Client

Confidential Client

Project Location

Texas

Looking for effective solutions to your problems?

Turn to the experts at TRC.

By clicking "Accept", you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. Read our Privacy Policy.