Connecticut Community Microgrid Program After Connecticut experienced multiple severe weather events and lengthy power outages, the Connecticut Department of Energy and Environmental Protection (DEEP) … Read More
Holtwood Hydro-Electric Generating Station Expansion TRC was retained as the Geotechnical Engineer-of-Record to execute a geotechnical investigation associated with a 125 MW expansion of PPL … Read More
Pre-construction Avian Studies and Eagle Nest Surveys Throughout the project, TRC coordinated closely with the relevant regulatory agencies including USFWS to update them on the study design … Read More
Waterside Generating Station Demolition and Abatement TRC’s RE Power team assumed full responsibility for the physical decommissioning of these properties located in Manhattan. Read More
Post Construction Avian and Bat Mortality Surveys TRC biologists successfully managed survey data via a mobile, online collection tool to reduce the need to transcribe data, minimize … Read More
Blue Diamond Solar Energy, LLC Project Permitting TRC assisted Blue Diamond Solar Energy, LLC with permits required to construct and operate a proposed 20-megawatt photovoltaic solar energy … Read More
Relicensing of Niagara River Hydropwer System TRC guided the relicensing effort for New York State's largest electric generating facility. Read More
Tasker Farm Substation TRC was contracted by PSNH to provide Engineering, Procurement, Construction, and Testing & Commissioning (EPC) services to provide a turn-key … Read More
Conowingo Hydropower Relicensing TRC was responsible for the relicensing process covering all aspects of recreation and land management including: recreation inventory and issue … Read More