Projets en vedette
Découvrez le succès que nous avons eu en aidant nos clients à exécuter des projets majeurs et à avoir un impact significatif sur leurs communautés locales.
Under a 3‐year contract with the Port of Long Beach to provide, TRC provided on‐call hazardous waste site remediation services, …
TRC has completed more than 100 assignments including complex petroleum spill site closures and engineering projects at port facilities, airports, …
TRC a fourni des services de conception, d’approvisionnement et de construction pour 38 miles de lignes de transmission, deux agrandissements …
- Gestion des urgences et intervention
- Prévention des déversements et intervention en cas de déversement
TRC delivered design, procurement, and construction services for 38 miles of transmission lines, two substation expansions, and equipment upgrades at …
- Gestion des urgences et intervention
- Assainissement et gestion des matériaux
- Gestion des déchets solides
TRC delivered design, procurement, and construction services for 38 miles of transmission lines, two substation expansions, and equipment upgrades at …
Under a 3‐year contract with the Port of Long Beach to provide, TRC provided on‐call hazardous waste site remediation services, …
TRC has completed more than 100 assignments including complex petroleum spill site closures and engineering projects at port facilities, airports, …
TRC a fourni des services de conception, d’approvisionnement et de construction pour 38 miles de lignes de transmission, deux agrandissements …
- Gestion des urgences et intervention
- Prévention des déversements et intervention en cas de déversement
TRC delivered design, procurement, and construction services for 38 miles of transmission lines, two substation expansions, and equipment upgrades at …
- Gestion des urgences et intervention
- Assainissement et gestion des matériaux
- Gestion des déchets solides
TRC delivered design, procurement, and construction services for 38 miles of transmission lines, two substation expansions, and equipment upgrades at …
Partager nos perspectives
Nos praticiens partagent leurs idées et leurs points de vue sur les tendances et les défis qui façonnent le marché.
The Risks and Rewards of Transporting LNG By Rail
février 4, 2020
The comment period for the proposed rule to allow LNG transport by rail ended on Jan. 13. Now the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) decides how to move forward on the idea, which was introduced by trade advocates representing North America’s seven Class I railroads. TRC’s Wade Narin van Court discusses the regulatory and financial implications for freight carriers planning to compete in a new commercial arena.
NERC Proposes Compliance Monitoring and Enforcement Plan for 2019
septembre 26, 2018
This month, NERC released the first draft of its 2019 Compliance Monitoring and Enforcement Plan (CMEP) which identifies power delivery system risks and outlines compliance audit requirements for next year. The risk elements outlined in the plan include significant differences from previous years, as shown in the table below. Each NERC region must consider these risks as they develop their monitoring and audit scopes for utilities. Utilities should be prepared to be audited and implement any necessary compliance initiatives in these areas.
5 Tips to Help Restore Ambient Monitoring Operations Following a Natural Disaster
octobre 10, 2017
Many facilities that need to monitor air quality have been hard hit by the recent spate of hurricanes. Here are tips to stay compliant with state and federal regulations.
Building a More Resilient New York
juin 24, 2013
The aftermath of Super Storm Sandy, which caused devastation including property damage, mass power outages and loss of life, has caused us to rethink, entirely, how well prepared we are for these events which were previously thought to be anomalies but which result in long term remediation efforts.