On May 18, 2023, EPA published the proposed Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Legacy CCR Surface Impoundments to amend subpart D of part 257 of Title 40 (Legacy CCR Surface Impoundments). The proposed rule would regulate Legacy CCR Surface Impoundments under the existing Subpart D of part 257 of Title 40, known as the CCR Rule, which became effective on October 19, 2015.

TRC’s white paper describes the key implications of the Proposed CCR Legacy Surface Impoundments Rule for regulated utilities.

Related Materials

S’adapter au
changement

Collaborez avec les praticiens testés de TRC

Contact Us

Partager nos perspectives

Nos praticiens partagent leurs idées et leurs points de vue sur les tendances et les défis qui façonnent le marché.

Coal-Fired-Power-Station-1
Mises à jour réglementaires

Time to Act: Turning CCRMU Deadline Extensions into Strategic Advantages

mars 4, 2026

Our practitioners outline what you need to know about the CCRMU deadline extension rule.

coal-power-plant-factory-643293310-edit1-1-scaled-min
Aperçus

Ancienne règle du CCR : Planifier à l’avance pour la surveillance des CCMR

octobre 18, 2024

Le 8 mai 2024, l’Environmental Protection Agency (EPA) des États-Unis a publié la version finale du Système de gestion des déchets dangereux et solides : Élimination des résidus de combustion du charbon des services publics d’électricité.

b8f687b1-coal-power-plant-sunset
Livres blancs/rapports

Understanding Piper Diagrams: Applications and Limitations with Coal Combustion Residuals

septembre 28, 2023

Learn more about approaches to overcome the recognized limitations of Piper Diagrams and how to make the most of this valuable technique.

98bf3ae3-coalash-2015
Nouvelles

Proposed Coal Combustion Residuals Legacy CCR Surface Impoundments Rule – Status of Public Comments

juillet 31, 2023

TRC has submitted public comments related to EPA’s proposed compliance timeline and schedule.

268f59fe-power-plant-from-coal-993346578
Livres blancs/rapports

Summary of Proposed Coal Combustion Residuals Legacy CCR Surface Impoundments Rule

juin 8, 2023

TRC’s extensive background in CCR compliance support under the current CCR rule helps our clients get in front of these new regulations.

a1a97d18-brand-new-coal-power-plant-489110302
Aperçus

EPA Provides New Coal Combustion Residual Expectations

octobre 6, 2022

The Environmental Protection Agency (EPA) highlighted new Coal Combustion Residual (CCR) compliance expectations.

trc-coal-ash-management
Mises à jour réglementaires

EPA Coal Ash Compliance Expectations Updated

mars 28, 2022

New EPA Communications highlight new Coal Combustion Residual compliance expectations, a shift from the current program.

67ac0246-ccr-groundwater-compliance-southeast
Aperçus

CCR Removal and Its Effects on Soil and Groundwater Geochemistry

octobre 25, 2021

Many utilities are implementing corrective action at coal combustion residual (CCR) surface impoundments under Federal or State CCR Regulations, with implications for groundwater protection standards.

GettyImages-1253487317
Aperçus

Consider a CCR Audit as the Assessment & Plan Deadline Approaches

juillet 8, 2021

With the upcoming five-year periodic assessment and plan deadlines rapidly approaching for landfills and surface impoundments, power generators subject to the CCR Rule should also consider audits to ensure their facility records and external-facing web sites are complete and documents are up-to-date.

GettyImages-1492439239
Aperçus

TRC In Manchester – 1 Year Later

janvier 25, 2021

In January 2020 we opened our second UK office in Manchester. One year later, we reflect on our first year of business, a year that presented the world with unprecedented challenges.

GettyImages-1457369699
Vidéos

Breakthrough Solutions for Coal Combustion Residuals Compliance

septembre 3, 2020

TRC is your trusted partner, helping to navigate the economic, environmental and regulatory pressures as well as the rapid technological advancements impacting successful coal ash management.

d99df596-trc-coal-ash-solar-sites
Aperçus

Why Coal Ash Impoundments and Landfills Make Great Solar Sites

septembre 25, 2019

Hundreds of coal ash sites are set to close over the next decade and could make ideal, low-impact locations for utility-scale solar farms.

GettyImages-1359747893
Médias

Successful Coal Ash Pond Management

juillet 10, 2014

Regulatory requirements, plant retirements, changes to facility operational profiles, environmental liability management and political and social pressures are among the factors driving utilities to close or consider closing their coal ash ponds.

60f3ba0e-graham-crockford-e1772058201389
Graham Crockford

Graham Crockford, VP has over 36 years of professional experience in the environmental consulting industry and has been at TRC for over 28 years. He currently serves as an Account Leader and Solid Waste Initiative Director in the Engineering, Construction and Remediation practice for TRC, and co-leads TRC Coal Combustion Residuals (CCR) CORE team with Sarah Holmstrom. He also serves as a Program Manager for TRC's utility and industrial clients where he assists utilities with addressing their environmental liabilities as they achieve their renewable energy and decarbonization goals. Graham has a long history with Resource Conservation and Recovery Act (RCRA) compliance related to the liquid, solid waste and coal combustion residuals (CCR) industry, including active-life/post-closure care. He has extensive experience in landfill permitting, groundwater compliance monitoring and remediation and landfill construction and operation. He also served as a program manager for a regional liquid and solid waste management firm where he was responsible for implementing groundwater protection and compliance programs for over 12 TSDFs across the U.S. Graham has served on several technical committees providing advocacy and industry perspective during development of solid waste rules in response to RCRA Subtitle D. His extensive background in solid waste compliance; groundwater data management; investigation; reporting; and remediation for municipal, industrial and CCR waste disposal facilities brings value to the effective management of groundwater and remediation-related issues resulting from their disposal. He also has decades of contaminant investigation and remediation experience focused on recalcitrant solvent contamination, and metals. Graham also provides litigation support services, including expert and fact witness for TRC’s clients.

headshot_3-1
Sarah Holmstrom

Sarah Holmstrom, P.G., is a Senior Hydrogeologist and Project Manager in TRC’s Engineering, Construction, and Remediation practice. She has nearly 20 years of experience in regulatory compliance, focused heavily on the Federal Coal Combustion Residuals (CCR) Rule, Resource Conservation and Recovery Act (RCRA) Solid Waste, Michigan Part 115 solid waste and Part 201 remediation programs, serving as co-lead to TRC’s National CCR Program focused on advancing technical expertise across the TRC organization. She specializes in site characterization, hydrogeological investigations, conceptual site model (CSM) development, RCRA groundwater monitoring programs, risk-based corrective actions, and regulatory support. Contact Sarah at sholmstrom@trccompanies.com

c47bd6fd-gtieman-e1772058153110
Greg Tieman

Greg Tieman has 40 years of professional experience in the environmental consulting industry, and has been with TRC for over 11 years. He currently serves as a Senior Client Services Manager/ coal combustion residuals (CCR) Subject Matter Expert (SME) in the Engineering, Construction, and Remediation practice for TRC. He also serves as a Project Manager/ Senior Hydrogeologist for TRC's governmental, commercial, and industrial clients under various State risk-based voluntary remediation programs. Greg has a long history with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the Toxic Substances Control Act (TSCA) to address PCB assessment and cleanup issues, and the Resource Conservation and Recovery Act (RCRA) related to solid waste and CCR management, including active facility operations, closure, and post-closure care. Greg also has a long history with State Leaking Underground Storage Tank (LUST) programs. He has extensive experience in solid and hazardous waste landfill permitting and design, groundwater monitoring and remediation, and landfill construction and operation. His extensive background in solid and hazardous waste compliance; soil and groundwater investigation; reporting; and remediation for municipal, commercial, industrial, and CCR waste disposal facilities brings value to the effective management of groundwater and remediation-related issues resulting from their disposal.