Authors: Graham Crockford, VP & Steve Markesic | novembre 22, 2022

Because of challenges related to the Federal Coal Combustion Residuals (CCR) Rule, owners and operators of CCR units are actively making decisions on corrective measures to address CCR effects on water quality, often implementing closure options and remedy selection to achieve compliance. Because the Rule requires that an owner/operator meet groundwater protection standards (GWPS) under a stringent timeframe, many are seeking ways to use in-situ technologies to expedite GWPS compliance through enhanced attenuation (EA) strategies.

Contact Us

Download and Read our White Paper for More Details About:

  • Reductants and Biotic Processes
  • Biochemical Reduction Testing
  • Arsenic and Selenium Stabilization
  • ZVI Testing
  • Biowall Testing

Download the White Paper

GettyImages-1312405670

Two case studies tests

TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.

The first case study tested the application of Zero Valent Iron (ZVI) via direct-push injection techniques as an alternative means of attenuating a plume with persistent levels of arsenic. Based on the results from these tests, a pilot-scale test using a mixture of ZVI and ferrous sulfate was proposed and is currently being implemented.

The second case study had a groundwater extraction system installed at a former CCR impoundment to provide enhanced natural attenuation. This case found that a permeable reactive barrier (PRB) was not recommended due to the concern of long-term permeability issues, which could result in the diversion of groundwater flow around the PRB.

These case studies provide valuable insight into implementing groundwater compliance strategies. Based on the data, it’s important to obtain a clear site conceptual model, incorporating geochemistry, hydrogeology, and attenuation parameters, and ensure the system is stable before assessing or making recommendations.

We have found that the removal of CCR from an impoundment does not always result in a quick attainment of GWPS, and Monitored Natural Attenuation (MNA) may take time. Reductant treatment technologies such as ZVI can be effective at stabilizing metals through sorption and coprecipitation reactions. The addition of ZVI not only facilitates these abiotic reactions, but also promotes biotic reactions that occur simultaneously. Once it is determined that EA may be appropriate for the site, a feasible application method needs to be evaluated. As part of the EA approach, it is also important to incorporate a monitoring program to ensure that the appropriate geochemical conditions are sustained, and that remobilization of metals will not occur.

Embrassez le changement

Collaborez avec les praticiens testés de TRC

Contact Us

Partager nos perspectives

Nos praticiens partagent leurs idées et leurs points de vue sur les tendances et les défis qui façonnent le marché.

solar-photovoltaic-panels-and-substations
Mises à jour réglementaires

Insights from the Odessa II Power System Disturbance

février 22, 2023

NERC and TRE release the Odessa II Power System Disturbance Report

0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416
Aperçus

Preparing Your RMP Facility for a Future of Extreme Weather

novembre 29, 2022

Facilities dealing with hazardous materials must prepare for extreme weather events that pose a risk to their operations and the community.

coal-fueled-power-plant-facilty-new
Livres blancs/rapports

Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites

novembre 22, 2022

TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.

279034d1-renewables
Aperçus

Q&A: Insights for Growing Utility-Scale Renewable Generation

septembre 29, 2022

TRC’s Senior Vice President of Renewable answers key questions to help utilities and developers overcome challenges associated with an increase in renewable generation.

GettyImages-2166904607
Aperçus

Using GIS Technology to Find Solar Development Sites

novembre 28, 2021

Renewable energy developers are in a race to find the optimal places for solar projects. GIS technology identifies the best locations.

GettyImages-665252122

PRC-002-2 Disturbance Monitoring and Reporting Standard: Initial Mandatory Implementation Plan Dates Approach

novembre 18, 2021

The Federal Energy Regulatory Commission approved PRC-002-2 in September, 2015. The initial due date for system studies necessary to identify locations for the collection of disturbance related data under Requirement R1 is January 1, 2017.

Salton-Sea-scaled-4
Mises à jour réglementaires

NERC’s Generator Relay Loadability Standard is Now in Effect

août 30, 2021

The Federal Energy Regulatory Commission (FERC) approved PRC-002-2, NERC’s mandatory reliability standard for Disturbance Monitoring and Reporting on September 17, 2015. The PRC-002-2 standard requires utilities to ensure that adequate data is available to support analysis of bulk electric system disturbances and outages. Generator Owners, Transmission Owners should be aware of the initial due date for system studies necessary to identify locations for the collection of disturbance related data under Requirement R1 is January 1, 2017. It is important to note that some of the locations may be generator buses. Transmission Owners and Generators must be prepared to work together to successfully fulfill the expectations of the new mandatory requirements. In particular this enforceable standard potentially create new requirements for Generator owners who have generally not had to address disturbance monitoring data gathering obligations in the past.

clean-energy
Mises à jour réglementaires

La NERC cherche à améliorer les rapports sur le rendement de la fiabilité du GADS

août 26, 2021

En vertu de la loi habilitante qui a créé l’Electric Reliability Organization, la NERC est responsable d’évaluer le rendement fiable du réseau électrique. L’une des façons dont la NERC le fait est d’obtenir un système de rapports de l’industrie pour la production et le transport. Le Système de données sur la disponibilité des générateurs (GADS) est utilisé par la NERC et l’industrie depuis plus de 40 ans pour obtenir des données sur la composante de production du système électrique[1]. En raison de l’évolution rapide de la composition des ressources de production, il est essentiel que NERC dispose de données complètes sur les installations, les événements, les pannes et les performances pour la production photovoltaïque et éolienne afin d’assurer la fiabilité. À mesure que les technologies renouvelables sont de plus en plus déployées, un ensemble complet de statistiques sur le rendement des actifs de production est nécessaire pour permettre à la NERC d’évaluer la capacité du système à répondre à la charge, la performance du réseau électrique et de prévoir tout problème de fiabilité potentiel en raison de l’insuffisance des ressources. Par conséquent, la NERC propose d’apporter les améliorations suivantes au processus de collecte de données GADS pour la production d’énergie renouvelable : Ajouter les propriétaires de générateurs qui exploitent des installations solaires photovoltaïques de 20 MW ou plus au Système de données sur la disponibilité de la production (appelé « GADS-PV ») ; et Élargir les rapports GADS Wind (« GADS-W ») pour inclure le stockage d’énergie connectée et le rapport d’événements.

192008c2-trc-epa-emissions-combustion-turbines
Mises à jour réglementaires

EPA Proposes New Emissions Limits for Combustion Turbines

mai 22, 2021

After 15 years of legal limbo, combustion turbines could be facing new emissions standards under a proposal introduced by the EPA.

b529816d-trc-enr-top-500-2019
Nouvelles

TRC Ranked No. 20 on Annual List of Top U.S. Design Firms

mai 9, 2021

TRC has once again been named one of the top engineering firms in the country by Engineering News-Record, finishing No. 20 on the publication’s annual list of the Top 500 design firms.

GettyImages-1216409748-1
Aperçus

The View on Climate Change has Changed in Washington

mars 1, 2021

The Biden Administration signals both a renewed and accelerated focus on climate change.

Voltage-Protection-Settings-for-Generating-Resources-1
Mises à jour réglementaires

NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources

juillet 28, 2020

On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.

New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1
Mises à jour réglementaires

New York State Finalizes Emission Limits for Power Generators

janvier 21, 2020

On January 16, 2020, the New York State Department of Environmental Conservation (NYSDEC) finalized a rulemaking limiting nitrogen oxide (NOx) emissions from existing simple cycle and regenerative peaking combustion turbines with a nameplate capacity of 15 megawatts (MW) or greater during the ozone season (May 1 – October 31).

New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1
Mises à jour réglementaires

New York State Proposes Emissions Limits for Power Generators

mars 22, 2019

On February 27, 2019, the New York State Department of Environmental Conservation (NYSDEC) released a proposed rulemaking limiting nitrogen oxide (NOx) emissions from existing simple cycle and regenerative peaking combustion turbines with a nameplate capacity of 15 megawatts (MW) or greater during the ozone season (May 1 – October 31).

GettyImages-636068142
Mises à jour réglementaires

NERC to Modify Standard and Develop Compliance Guidance to Accommodate Inverter-Based Generation Technologies

février 20, 2019

Renewable energy systems have dramatically changed the power generation resource mix. These new generation technologies no longer involve directly coupled rotating generators which were once standard in the industry. Now, inverters that change Direct Current (DC) electricity to the Alternating Current (AC) electricity suitable for delivery via AC transmission systems are becoming more prevalent, raising reliability…

GettyImages-1493729544
Mises à jour réglementaires

NERC Identifies New Reliability Risk due to Utility Scale Solar Generation Inverter Design

juin 13, 2017

NERC has released a report documenting its findings and recommendations related to reliability risks from utility scale solar generation projects with implications for PRC-024 compliance, as well as generation, interconnection and protection system technologies.

Engineers install solar cells on the roof of factory
Nouvelles

TRC’s Top 12 Predictions for The Energy Industry in 2017

Décembre 12, 2016

LOWELL, MA, TRC Companies Inc., a recognized leader in engineering, environmental consulting and construction-management services, today released its top 12 predictions for the energy, utility, and oil and gas sectors for 2017, including robust funding for utility mergers and acquisitions and infrastructure upgrades as well as big shifts in power plant and pipeline construction focus.

Two workers installing photovoltaic system.
Nouvelles

TRC Teams With BQ Energy for Award-Winning Solar Installation

janvier 13, 2016

TRC Companies has teamed with BQ Energy to develop the PatterSun solar installation, a project received a 2015 Chairman’s Award from The Business Council of New York.

60f3ba0e-graham-crockford
Graham Crockford

Graham has over 32 years of experience in the fields of consulting, environmental engineering, geology, and hydrogeology. He currently serves as a Unit Leader for TRC’s Environmental, Construction, and Remediation business, where he drives TRC’s strategic direction to serve our client and business goals. With decades of experience working with legacy coal-fired power generation, his focus is also directed to support our clients achieve their renewable energy and decarbonization goals. In this role, he fosters the connection of various TRC disciplines, and also engages in quality assurance, quality control and client experience. He also serves as a Client Services Manager/Project Manager for TRC's utility and industrial clients. Graham has a long history with the liquid/solid waste/CCR industry, including active-life and post-closure care. He has extensive experience in landfill permitting, wetland mitigation, and construction/operations. He also served as a program manager for a regional waste management firm for 4 years where he was responsible for implementing groundwater protection and compliance programs for over 12 TSDFs across the US. In the early 1990s Graham served on Michigan Waste Industry Association's technical standards subcommittee providing advocacy and industry perspective during development of Michigan’s Part 115 Solid Waste statute/rules in response to Subtitle D. Contact him at gcrockford@trccompanies.com.

e8b54157-steve-markesic
Steve Markesic

Steve has over 21 years of experience in the environmental industry specializing in the design and implementation of various in-situ remediation approaches at active and inactive facilities. His qualifications include extensive hands-on implementation, design, cost estimating, bid preparation, and project management. He has worked on projects throughout the United States and internationally. He has experience in applying remedial techniques in varying geologic conditions including low permeability, high groundwater flow, and fractured bedrock. He has extensive experience using remediation amendments to promote aerobic, anaerobic, and co-metabolic bioremediation, stabilization, and in-situ chemical oxidation, with some experience in steaming and NAPL product recovery. Steve’s experience with contaminants ranges from chlorinated alkenes, alkanes, petroleum hydrocarbons, and heavy metals. He currently serves in the capacity of Senior Hydrogeologist/Associate Project Manager in the Environmental, Construction, and Remediation division and is based out of the Ann Arbor, Michigan office. Contact him at SMarkesic@trccompanies.com.