{"id":2620,"date":"2019-08-23T06:31:00","date_gmt":"2019-08-23T06:31:00","guid":{"rendered":"https:\/\/www.trccompanies.com\/services\/traffic-engineering\/"},"modified":"2024-12-20T17:06:56","modified_gmt":"2024-12-20T17:06:56","slug":"traffic-engineering","status":"publish","type":"services","link":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/","title":{"rendered":"Traffic Studies &#038; Analysis"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <h2>New Pathways for Urban Planning<\/h2>\n<p class=\"sub-heading\">Planning and implementing solutions to improve safety, capacity and mobility.<\/p>\n<p>Expanding populations, increased development and rising fuel costs are ongoing changes that increase traffic congestion and accident rates. TRC is a traffic engineering partner providing pragmatic solutions to adapt and enhance traffic control.<\/p>\n<p>We conduct comprehensive evaluations of transport systems to improve flow and efficiency. Our services include data collection and activity surveys. We uncover congestion points, determine how a new project might influence travel and make recommendations for roadway design and signals. Our experts improve existing infrastructure and supplement the planning process for new additions. With TRC on your side, you have the strategic insights necessary for more informed decision-making.<\/p>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.trccompanies.com\/contact-us\/\">Contact Us<\/a><\/p>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/civil-overview\/civil-engineering\/\" target=\"_self\">Civil Engineering<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/civil-overview\/geotechnical-engineering\/\" target=\"_self\">Geotechnical Engineering<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/civil-overview\/structural-engineering\/\" target=\"_self\">Structural Engineering<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                        <div class=\"wysiwyg__links__bottom\">\n                            <a href=\"https:\/\/www.trccompanies.com\/services\/\" target=\"_self\">View All Services <\/a>\n                        <\/div>\n                                                                    <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-half-text-half-image -->\n\n<section class=\"half-and-half flex-row section-padding image-block-left bg-white text-column-one image-size-cover\">\n    <div class=\"half-and-half-image\">\n        <div class=\"half-and-half-image__wrap\">\n                                                <img decoding=\"async\" width=\"1024\" height=\"558\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/traffic-and-highway-engineering-1024x558.jpg\" class=\"object-fit\" alt=\"traffic-and-highway-engineering\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/traffic-and-highway-engineering-1024x558.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/traffic-and-highway-engineering-300x163.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/traffic-and-highway-engineering-768x418.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/traffic-and-highway-engineering-1536x837.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/traffic-and-highway-engineering-1101x600.jpg 1101w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/traffic-and-highway-engineering.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/>                                    <\/div>\n    <\/div>\n    \n    <div class=\"half-and-half-text\">\n        <div class=\"half-and-half-text__wrapper js-animated-content animated-content\">\n                                        <h2>Embrace the Shift With Our Practitioners<\/h2>\n<p>TRC\u2019s traffic and highway engineering teams are led by registered professional engineers and staff who hold specialized Professional Traffic Operations Engineers (PTOE) or Traffic Operations Practitioner Specialists (TOPS) certifications. These qualifications make us a center of excellence with experience in mitigating safety and capacity concerns for local communities, state transportation agencies and private developers.<\/p>\n<p>Using industry-standard software such as Synchro 7, CORSIM, HCS+ and TransPlan, we perform traffic analysis, transportation planning studies, simulation and modeling to develop existing base conditions, determine future conditions and test the effectiveness of improvement recommendations. We bring innovative and sustainable solutions to your projects and our studies and analyses deliver numerous practical benefits, including:<\/p>\n<ul>\n<li>Reducing the prevalence of roadway accidents to improve pedestrian and driver safety.<\/li>\n<li>Facilitating traffic flow by identifying and eliminating congestion points to improve signal timings and roadway designs.<\/li>\n<li>Supporting better land use and more effective infrastructure development.<\/li>\n<li>Allocating resources and reducing spending on major construction projects.<\/li>\n<li>Adhering to safety and environmental protection regulations for the transportation sector.<\/li>\n<li>Gaining insights into future conditions for lasting impacts on design.<\/li>\n<\/ul>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-half-text-half-image -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-purple\">\n    <div class=\"container-fluid\">\n                    <div class=\"wysiwyg__wrapper\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h2 style=\"text-align: left;\">Transform Traffic Insights Into Actionable Solutions<\/h2>\n<p style=\"text-align: left;\">Whether you need a simple safety improvement at an intersection, comprehensive corridor modifications, signal enhancements, traffic calming measures, capacity improvements or comprehensive traffic and transportation modeling, TRC offers the expertise and depth of resources to accomplish your objectives.<\/p>\n<p style=\"text-align: left;\">Our traffic engineering consultants deliver the following services.<\/p>\n                <\/div>\n                                <\/div>\n\n                    <\/div>\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-tabbed-half-text-image -->\n<section class=\"tab-slider tab-slider-box-content\">\n    <div class=\"container-fluid\">\n        <div class=\"tab-slider-box-content--wrap\">\n\n            \n            <div class=\"js-tab-slider-nav fx-slider\">\n                                <div class=\"tab-slider-nav-item fx-slide\">Traffic Flow Management<\/div>\n                                <div class=\"tab-slider-nav-item fx-slide\">Safety and Accident Analysis<\/div>\n                                <div class=\"tab-slider-nav-item fx-slide\">Traffic Simulation and Modeling<\/div>\n                                <div class=\"tab-slider-nav-item fx-slide\">Signal and Sign Management<\/div>\n                            <\/div>\n            <div class=\"js-tab-slider-for fx-slider\">\n                                <div class=\"tab-slider-for-item fx-slide\">\n                    <div class=\"tab-text-image\">\n                        <div class=\"tab-text-image__text\">\n                            <h2>Traffic Flow Management<\/h2>\n                            <p>Our services optimize flow and accessibility across environments. We aid mobility and reduce congestion through:<\/p>\n<ul>\n<li><strong>Access management studies:<\/strong> We examine how goods and people access roadways and determine how to make them safer and more efficient.<\/li>\n<li><strong>Internal traffic circulation studies:<\/strong> This traffic impact assessment (TIA) component considers how users will move around new developments.<\/li>\n<li><strong>Traffic impact studies for land development projects:<\/strong> TRC determines how a proposed development could impact existing roadways.<\/li>\n<li><strong>Roadway improvement and access plans:<\/strong> Our team develops solutions for fixing roadways.<\/li>\n<li><strong>Parking efficiency and parking demand studies:<\/strong> TRC can analyze current and future parking infrastructure needs.<\/li>\n<\/ul>\n                        <\/div>\n                        <div class=\"tab-text-image__image\">\n                            <img decoding=\"async\" width=\"1920\" height=\"1013\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Flow-Management.jpg\" class=\"object-fit\" alt=\"Traffic-Flow-Management\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Flow-Management.jpg 1920w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Flow-Management-300x158.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Flow-Management-1024x540.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Flow-Management-768x405.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Flow-Management-1536x810.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Flow-Management-1137x600.jpg 1137w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>                        <\/div>\n                    <\/div>\n                <\/div>\n                                <div class=\"tab-slider-for-item fx-slide\">\n                    <div class=\"tab-text-image\">\n                        <div class=\"tab-text-image__text\">\n                            <h2>Safety and Accident Analysis<\/h2>\n                            <p>We identify hazards and work toward solutions to make roads safer for pedestrians, cyclists and motorists. Our services include:<\/p>\n<ul>\n<li><strong>Accident analysis:<\/strong> Investigate the underlying causes of accidents to prevent future incidents.<\/li>\n<li><strong>Traffic calming studies:<\/strong> We determine calming measures or study existing systems to identify improvement areas.<\/li>\n<li><strong>Traffic signal warrant studies:<\/strong> Decide whether a particular intersection needs a signal to reduce accidents or enhance flow.<\/li>\n<\/ul>\n                        <\/div>\n                        <div class=\"tab-text-image__image\">\n                            <img decoding=\"async\" width=\"1920\" height=\"892\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Safety-and-Accident-Analysis.jpg\" class=\"object-fit\" alt=\"Safety-and-Accident-Analysis\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Safety-and-Accident-Analysis.jpg 1920w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Safety-and-Accident-Analysis-300x139.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Safety-and-Accident-Analysis-1024x476.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Safety-and-Accident-Analysis-768x357.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Safety-and-Accident-Analysis-1536x714.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Safety-and-Accident-Analysis-1291x600.jpg 1291w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>                        <\/div>\n                    <\/div>\n                <\/div>\n                                <div class=\"tab-slider-for-item fx-slide\">\n                    <div class=\"tab-text-image\">\n                        <div class=\"tab-text-image__text\">\n                            <h2>Traffic Simulation and Modeling<\/h2>\n                            <p>Our team applies various analytical techniques to model and predict traffic behavior, including:<\/p>\n<ul>\n<li><strong>Traffic simulation modeling:<\/strong> Our team mathematically represents traffic behavior to replicate real scenarios of particular roadways.<\/li>\n<li><strong>Level of service (LOS) analysis:<\/strong> Gain an inside perspective from drivers on how a road operates relating to factors including speed and congestion.<\/li>\n<\/ul>\n                        <\/div>\n                        <div class=\"tab-text-image__image\">\n                            <img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Simulation-and-Modeling.jpg\" class=\"object-fit\" alt=\"Traffic-Simulation-and-Modeling\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Simulation-and-Modeling.jpg 1920w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Simulation-and-Modeling-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Simulation-and-Modeling-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Simulation-and-Modeling-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Simulation-and-Modeling-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Traffic-Simulation-and-Modeling-1067x600.jpg 1067w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>                        <\/div>\n                    <\/div>\n                <\/div>\n                                <div class=\"tab-slider-for-item fx-slide\">\n                    <div class=\"tab-text-image\">\n                        <div class=\"tab-text-image__text\">\n                            <h2>Signal and Sign Management<\/h2>\n                            <p><span style=\"font-weight: 400;\">Traffic control devices play a significant role in safety and efficiency. TRC manages and optimizes the design and timing of signals through the following offerings:<\/span><\/p>\n<ul>\n<li><strong>Traffic signal design, timing, operation and modification:<\/strong> Create a new system or improve existing structures with TRC.<\/li>\n<li><strong>Sign inventory and management (SIM):<\/strong> A SIM program allows for the gathering of sign data for better maintenance, safety and budgeting.<\/li>\n<li><strong>Maintenance of traffic (MOT) and transportation planning:<\/strong> Introduce temporary management during construction or other projects.<\/li>\n<\/ul>\n                        <\/div>\n                        <div class=\"tab-text-image__image\">\n                            <img decoding=\"async\" width=\"1920\" height=\"1020\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Signal-and-Sign-Management.jpg\" class=\"object-fit\" alt=\"Signal-and-Sign-Management\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Signal-and-Sign-Management.jpg 1920w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Signal-and-Sign-Management-300x159.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Signal-and-Sign-Management-1024x544.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Signal-and-Sign-Management-768x408.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Signal-and-Sign-Management-1536x816.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/Signal-and-Sign-Management-1129x600.jpg 1129w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>                        <\/div>\n                    <\/div>\n                <\/div>\n                            <\/div>\n        <\/div>            \n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-tabbed-half-text-image -->\n\n<!-- Start Block: acf\/innerpage-featured-projects -->\n\n<section class=\"projects-featured section-margins bg-white hidden-xs-down\">\n    <div class=\"container-fluid\">\n        <div class=\"projects-featured__top-content js-animated-content animated-content\">\n            <div class=\"projects-featured__top-content__text js-animated-content animated-content\">\n                <h2>Featured Projects<\/h2>\n<p>Discover the success we\u2019ve had with helping our clients execute major projects and make a meaningful impact on their local communities.<\/p>\n            <\/div>\n                        <div class=\"projects-featured__top-content__btn hidden-md-down\">\n                <a href=\"https:\/\/www.trccompanies.com\/projects\/\" title=\"View Our Project Capabilities\" class=\"btn btn-tertiary\" >View Our Project Capabilities<\/a>            <\/div>\n                    <\/div>\n\n        <div class=\"projects-featured__block\">\n            <div class=\"row\">\n                <div class=\"col-lg-7 big hidden-md-down\">\n                    <div class=\"js-projects-featured-slider fx-slider\">\n                                                <div class=\"projects-featured-slider-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"2121\" height=\"1414\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"GettyImages-173692442-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min.jpg 2121w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-700x467.jpg 700w\" sizes=\"(max-width: 2121px) 100vw, 2121px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/geotechnical-engineering\/\" class=\"image-card__category\">Geotechnical Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-hov-reconstruction-north-los-angeles-county-mta-los-angeles-county\/\" class=\"project-list-card-title\">I-5 HOV Reconstruction<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-hov-reconstruction-north-los-angeles-county-mta-los-angeles-county\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>As a major project sub-consultant to Hills International TRC has provided construction management services since January 1, 2021.<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"690\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"28953bd8-gettyimages-1307424076-e1674678760834-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min.jpg 1500w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-300x138.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-1024x471.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-768x353.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-1304x600.jpg 1304w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-1000x460.jpg 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-700x322.jpg 700w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/geotechnical-engineering\/\" class=\"image-card__category\">Geotechnical Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-widening-project-pse-segment-3-el-toro-road-to-alicia-pkwy-laguna-hills-ca-octa-and-caltrans-district-12\/\" class=\"project-list-card-title\">I-5 Widening Project PS&#038;E Segment 3 (El Toro Road to Alicia Pkwy)<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-widening-project-pse-segment-3-el-toro-road-to-alicia-pkwy-laguna-hills-ca-octa-and-caltrans-district-12\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>The I-5 Widening Project from Alicia Parkway to El Toro Road (Segment 3) is part of a 6.5-mile corridor widening &hellip;<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1329\" height=\"790\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"f89989f6-gettyimages-172433069-e1674677976345-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min.jpg 1329w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-300x178.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-1024x609.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-768x457.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-1009x600.jpg 1009w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-841x500.jpg 841w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-700x416.jpg 700w\" sizes=\"(max-width: 1329px) 100vw, 1329px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/construction-inspection\/\" class=\"image-card__category\">Construction Inspection<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/field-services-and-inspection\/\" class=\"image-card__category\">Field Services and Inspection<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/mid-coast-corridor-transit-project-segments-1-and-2-san-diego-association-of-governments-sandag\/\" class=\"project-list-card-title\">Mid-Coast Corridor Transit Project: Segments 1 and 2- San Diego Association of Governments (SANDAG)<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/mid-coast-corridor-transit-project-segments-1-and-2-san-diego-association-of-governments-sandag\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>TRC provided civil and structural quality assurance\/inspection services on Segments 1 and 2 of the Mid Coast project.<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"2000\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"438fc0bf-stremple-st-final-walk-through-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min.jpg 1500w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-225x300.jpg 225w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-768x1024.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-1152x1536.jpg 1152w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-450x600.jpg 450w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-375x500.jpg 375w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/bridge-and-highway-structures\/\" class=\"image-card__category\">Bridge and Highway Structures<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/strempel-road-street-reconstruction\/\" class=\"project-list-card-title\">Strempel Road Street Reconstruction<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/strempel-road-street-reconstruction\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>The reconstruction of Strempel Road between SH 123 Business (Austin Street) and SH 123 Bypass.<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1120\" height=\"630\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1.png\" class=\"object-fit project-list-card-image\" alt=\"7eef6747-i-5-sr-74-ortega-002-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1.png 1120w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-300x169.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-1024x576.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-768x432.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-1067x600.png 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-889x500.png 889w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-700x394.png 700w\" sizes=\"(max-width: 1120px) 100vw, 1120px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/government\/\" class=\"image-card__category\">Government<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-sr-74-ortega-highway-interchange-improvement-project\/\" class=\"project-list-card-title\">I-5 \/ SR-74 Ortega Highway Interchange Improvement Project<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-sr-74-ortega-highway-interchange-improvement-project\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>TRC, in collaboration with Caltrans District 12, directed a comprehensive public awareness campaign to keep the community, commuters and all &hellip;<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"2384\" height=\"1257\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1.jpg\" class=\"object-fit project-list-card-image\" alt=\"GettyImages-1944772735-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1.jpg 2384w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-300x158.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-1024x540.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-768x405.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-1536x810.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-2048x1080.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-1138x600.jpg 1138w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-948x500.jpg 948w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-700x369.jpg 700w\" sizes=\"(max-width: 2384px) 100vw, 2384px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/government\/\" class=\"image-card__category\">Government<\/a><\/li><li><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/us-101-sr-23-interchange-improvement-project\/\" class=\"project-list-card-title\">US 101 \/ SR-23 Interchange Improvement Project<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/us-101-sr-23-interchange-improvement-project\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>The US 101 \/ SR-23 Interchange improvement project, initiated by the City of Thousand Oaks (City), Caltrans District 7 and &hellip;<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                            <\/div>\n                <\/div>\n                <div class=\"col-xxs-12 col-lg-5\">\n                    <div class=\"js-projects-featured-list-slider fx-slider\">\n                                                <div class=\"projects-featured-slider-list-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"2121\" height=\"1414\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"GettyImages-173692442-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min.jpg 2121w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-173692442-min-700x467.jpg 700w\" sizes=\"(max-width: 2121px) 100vw, 2121px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li class=\"civil-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li class=\"geotechnical-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/geotechnical-engineering\/\" class=\"image-card__category\">Geotechnical Engineering<\/a><\/li><li class=\"roads-and-highways\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-hov-reconstruction-north-los-angeles-county-mta-los-angeles-county\/\" class=\"project-list-card-title\">I-5 HOV Reconstruction<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-hov-reconstruction-north-los-angeles-county-mta-los-angeles-county\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>As a major project sub-consultant to Hills International TRC has provided construction management services since January 1, 2021.<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-list-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"690\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"28953bd8-gettyimages-1307424076-e1674678760834-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min.jpg 1500w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-300x138.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-1024x471.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-768x353.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-1304x600.jpg 1304w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-1000x460.jpg 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/28953bd8-gettyimages-1307424076-e1674678760834-min-700x322.jpg 700w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li class=\"civil-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li class=\"geotechnical-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/geotechnical-engineering\/\" class=\"image-card__category\">Geotechnical Engineering<\/a><\/li><li class=\"roads-and-highways\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-widening-project-pse-segment-3-el-toro-road-to-alicia-pkwy-laguna-hills-ca-octa-and-caltrans-district-12\/\" class=\"project-list-card-title\">I-5 Widening Project PS&#038;E Segment 3 (El Toro Road to Alicia Pkwy)<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-widening-project-pse-segment-3-el-toro-road-to-alicia-pkwy-laguna-hills-ca-octa-and-caltrans-district-12\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>The I-5 Widening Project from Alicia Parkway to El Toro Road (Segment 3) is part of a 6.5-mile corridor widening &hellip;<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-list-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1329\" height=\"790\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"f89989f6-gettyimages-172433069-e1674677976345-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min.jpg 1329w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-300x178.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-1024x609.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-768x457.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-1009x600.jpg 1009w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-841x500.jpg 841w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/f89989f6-gettyimages-172433069-e1674677976345-min-700x416.jpg 700w\" sizes=\"(max-width: 1329px) 100vw, 1329px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li class=\"civil-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li class=\"construction-inspection\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/construction-inspection\/\" class=\"image-card__category\">Construction Inspection<\/a><\/li><li class=\"field-services-and-inspection\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/field-services-and-inspection\/\" class=\"image-card__category\">Field Services and Inspection<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/mid-coast-corridor-transit-project-segments-1-and-2-san-diego-association-of-governments-sandag\/\" class=\"project-list-card-title\">Mid-Coast Corridor Transit Project: Segments 1 and 2- San Diego Association of Governments (SANDAG)<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/mid-coast-corridor-transit-project-segments-1-and-2-san-diego-association-of-governments-sandag\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>TRC provided civil and structural quality assurance\/inspection services on Segments 1 and 2 of the Mid Coast project.<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-list-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1500\" height=\"2000\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min.jpg\" class=\"object-fit project-list-card-image\" alt=\"438fc0bf-stremple-st-final-walk-through-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min.jpg 1500w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-225x300.jpg 225w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-768x1024.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-1152x1536.jpg 1152w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-450x600.jpg 450w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/438fc0bf-stremple-st-final-walk-through-min-375x500.jpg 375w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li class=\"bridge-and-highway-structures\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/bridge-and-highway-structures\/\" class=\"image-card__category\">Bridge and Highway Structures<\/a><\/li><li class=\"civil-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li class=\"roads-and-highways\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/strempel-road-street-reconstruction\/\" class=\"project-list-card-title\">Strempel Road Street Reconstruction<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/strempel-road-street-reconstruction\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>The reconstruction of Strempel Road between SH 123 Business (Austin Street) and SH 123 Bypass.<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-list-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"1120\" height=\"630\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1.png\" class=\"object-fit project-list-card-image\" alt=\"7eef6747-i-5-sr-74-ortega-002-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1.png 1120w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-300x169.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-1024x576.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-768x432.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-1067x600.png 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-889x500.png 889w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/7eef6747-i-5-sr-74-ortega-002-1-700x394.png 700w\" sizes=\"(max-width: 1120px) 100vw, 1120px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li class=\"civil-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li class=\"government\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/government\/\" class=\"image-card__category\">Government<\/a><\/li><li class=\"roads-and-highways\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-sr-74-ortega-highway-interchange-improvement-project\/\" class=\"project-list-card-title\">I-5 \/ SR-74 Ortega Highway Interchange Improvement Project<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/i-5-sr-74-ortega-highway-interchange-improvement-project\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>TRC, in collaboration with Caltrans District 12, directed a comprehensive public awareness campaign to keep the community, commuters and all &hellip;<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                                <div class=\"projects-featured-slider-list-item fx-slide\">\n                            <div class=\"project-list-card-item\">\n                                <div class=\"project-list-card\">\n                                    <img decoding=\"async\" width=\"2384\" height=\"1257\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1.jpg\" class=\"object-fit project-list-card-image\" alt=\"GettyImages-1944772735-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1.jpg 2384w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-300x158.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-1024x540.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-768x405.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-1536x810.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-2048x1080.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-1138x600.jpg 1138w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-948x500.jpg 948w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1944772735-1-700x369.jpg 700w\" sizes=\"(max-width: 2384px) 100vw, 2384px\" \/>                                    <div class=\"project-list-card__details\">\n                                                                                <ul class=\"hidden-xs-down\">\n                                        <li class=\"civil-engineering\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/civil-engineering\/\" class=\"image-card__category\">Civil Engineering<\/a><\/li><li class=\"government\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/government\/\" class=\"image-card__category\">Government<\/a><\/li><li class=\"roads-and-highways\"><a href=\"https:\/\/www.trccompanies.com\/projects-category\/roads-and-highways\/\" class=\"image-card__category\">Roads and Highways<\/a><\/li>                                        <\/ul>\n                                                                                <a href=\"https:\/\/www.trccompanies.com\/projects\/us-101-sr-23-interchange-improvement-project\/\" class=\"project-list-card-title\">US 101 \/ SR-23 Interchange Improvement Project<\/a>\n                                        <a href=\"https:\/\/www.trccompanies.com\/projects\/us-101-sr-23-interchange-improvement-project\/\" class=\"project-card-redirect-btn\"><i class=\"icon-link\"><\/i><\/a>\n                                        <div class=\"project-list-card__content hidden-md-down\">\n                                            <p>The US 101 \/ SR-23 Interchange improvement project, initiated by the City of Thousand Oaks (City), Caltrans District 7 and &hellip;<\/p>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                            <\/div>\n                        <\/div>\n                                            <\/div>\n    \n                <\/div>\n\n            <\/div>\n        <\/div>\n\n        <div class=\"projects-featured__btn hidden-lg\">\n            <a href=\"https:\/\/www.trccompanies.com\/projects\/\" title=\"View Our Project Capabilities\" class=\"btn btn-tertiary hidden-sm-up\" >View Our Project Capabilities<\/a>            <a href=\"https:\/\/www.trccompanies.com\/projects\/\" title=\"View Our Project Capabilities\" class=\"btn btn-tertiary hidden-xs-down\" >View Our Project Capabilities<\/a>        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-featured-projects -->\n\n<!-- Start Block: acf\/innerpage-accordion -->\n<section class=\"fx-accordion js-accordion section-margins\">\n    <div class=\"container-fluid\">\n        <div class=\"fx-accordion-flex\">\n                        <div class=\"fx-accordion-top-content js-animated-content animated-content\">\n                <div class=\"fx-accordion-top-content__inner\">\n                    <h2>Frequently Asked Questions<\/h2>\n<p>Here are a few common questions and their answers to give you the information you need about our services.<\/p>\n                <\/div>\n            <\/div>\n                                    <div class=\"fx-accordion-right\">\n                <div class=\"fx-accordion__panels js-animated-content animated-content\">    \n                                        <article class=\"fx-accordion__panel js-accordion-item icon--collapse\" data-accordion-id=\"0\">\n                        <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"0\">What&rsquo;s the difference between traffic and transportation engineering?<\/button>    \n                        <div class=\"fx-accordion__panel__content\">\n                            <p>Our traffic engineers focus on the movement of vehicles and pedestrians throughout all stages of the roadway construction process, including planning design, construction and operations and maintenance. Transportation engineers focus more on a single project, from design to construction.<\/p>\n                                                    <\/div>\n                    <\/article>\n                                        <article class=\"fx-accordion__panel js-accordion-item\" data-accordion-id=\"1\">\n                        <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"1\">When should clients seek traffic studies?<\/button>    \n                        <div class=\"fx-accordion__panel__content\">\n                            <p>Traffic studies mainly cover new developments that could impact nearby movement. Some new developments will only generate a minor addition, so they don&rsquo;t need a study. These studies also help in scenarios related to traffic management or safety, like:<\/p>\n<ul>\n<li>An area with frequent accidents.<\/li>\n<li>A major roadway construction project.<\/li>\n<li>Controversy regarding a project.<\/li>\n<li>Expertise in environmental review processes.<\/li>\n<\/ul>\n                                                    <\/div>\n                    <\/article>\n                                    <\/div>\n            <\/div>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-accordion -->\n\n<!-- Start Block: acf\/innerpage-promotion-blocks -->\n\n<section class=\"cta-right-image-text\">\n    <div class=\"cta-right-image-text__wrap\">\n        <div class=\"cta-right-image-text__text\">\n            <div class=\"cta-right-image-text__text__wrap js-animated-content animated-content\">\n                <h2>Resolve Your Traffic Management Challenges With TRC<\/h2>\n<p>Our traffic engineering consulting firm develops safe roadways while minimizing costs. TRC&rsquo;s traffic studies and analysis generate insights into current and future roadway operations, giving clients the strategies necessary to implement changes. Start the planning process <a href=\"https:\/\/www.trccompanies.com\/contact-us\/\">by contacting TRC<\/a>.<\/p>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.trccompanies.com\/contact-us\/\">Contact Us<\/a><\/p>\n            <\/div>\n        <\/div>\n        <div class=\"cta-right-image-text__image\">\n            <img decoding=\"async\" width=\"2048\" height=\"2560\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-scaled.jpg\" class=\"object-fit\" alt=\"thaddaeus-lim-RBthQZJd_vU-unsplash-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-scaled.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-240x300.jpg 240w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-819x1024.jpg 819w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-768x960.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-1229x1536.jpg 1229w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-1638x2048.jpg 1638w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2019\/08\/thaddaeus-lim-RBthQZJd_vU-unsplash-480x600.jpg 480w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/>            <span class=\"top\"><\/span>\n            <span class=\"bottom\"><\/span>\n            <span class=\"left\"><\/span>\n            <span class=\"right\"><\/span>\n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-promotion-blocks -->\n\n<!-- Start Block: acf\/innerpage-news-and-insights -->\n<section class=\"image-cards image-cards--news-and-insights section-margins image-cards--with-slider image-cards--innerpage\">\n    <div class=\"container-fluid\">\n        <div class=\"image-cards__wrap\">\n            <div class=\"image-cards__left\">\n                <div>\n                    <h2>Partager nos perspectives<\/h2>\n<p>Nos praticiens partagent leurs id\u00e9es et leurs points de vue sur les tendances et les d\u00e9fis qui fa\u00e7onnent le march\u00e9.<\/p>\n                <\/div>\n                                <div class=\"image-cards__btn\">\n                    <a href=\"https:\/\/www.trccompanies.com\/insights\/\" title=\"View More\" class=\"btn btn-tertiary\" >View More<\/a>                <\/div>\n                            <\/div>\n                            <div class=\"image-cards__right\">\n                    <div class=\"js-image-cards-slider fx-slider\">\n                                            <\/div>\n                <\/div>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-news-and-insights -->","protected":false},"excerpt":{"rendered":"<p>Planning and implementing solutions to improve safety, capacity and mobility. <\/p>\n","protected":false},"featured_media":17635,"parent":2618,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","class_list":["post-2620","services","type-services","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Traffic Engineering Company | Traffic Study Firm | TRC<\/title>\n<meta name=\"description\" content=\"Planning and implementing solutions to improve safety, capacity and mobility.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Traffic Engineering Company | Traffic Study Firm | TRC\" \/>\n<meta property=\"og:description\" content=\"Planning and implementing solutions to improve safety, capacity and mobility.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-20T17:06:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316-1024x682.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"682\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/\",\"name\":\"Traffic Engineering Company | Traffic Study Firm | TRC\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316.jpg\",\"datePublished\":\"2019-08-23T06:31:00+00:00\",\"dateModified\":\"2024-12-20T17:06:56+00:00\",\"description\":\"Planning and implementing solutions to improve safety, capacity and mobility.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#breadcrumb\"},\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316.jpg\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316.jpg\",\"width\":2121,\"height\":1413,\"caption\":\"Night highway with streetlights beautiful.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.trccompanies.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transportation Consulting Solutions\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Traffic Engineering Company | Traffic Study Firm | TRC","description":"Planning and implementing solutions to improve safety, capacity and mobility.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/","og_locale":"fr_CA","og_type":"article","og_title":"Traffic Engineering Company | Traffic Study Firm | TRC","og_description":"Planning and implementing solutions to improve safety, capacity and mobility.","og_url":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/","og_site_name":"TRC Companies","article_modified_time":"2024-12-20T17:06:56+00:00","og_image":[{"width":1024,"height":682,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316-1024x682.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/","url":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/","name":"Traffic Engineering Company | Traffic Study Firm | TRC","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316.jpg","datePublished":"2019-08-23T06:31:00+00:00","dateModified":"2024-12-20T17:06:56+00:00","description":"Planning and implementing solutions to improve safety, capacity and mobility.","breadcrumb":{"@id":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#breadcrumb"},"inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316.jpg","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1097184316.jpg","width":2121,"height":1413,"caption":"Night highway with streetlights beautiful."},{"@type":"BreadcrumbList","@id":"https:\/\/www.trccompanies.com\/fr\/services\/transportation-consulting-solutions\/traffic-engineering\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.trccompanies.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Transportation Consulting Solutions"}]},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services\/2620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/services"}],"replies":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/comments?post=2620"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services\/2620\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services\/2618"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/17635"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=2620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}