{"id":34570,"date":"2026-04-10T19:23:48","date_gmt":"2026-04-10T19:23:48","guid":{"rendered":"https:\/\/www.trccompanies.com\/?post_type=news-and-insights&#038;p=34570"},"modified":"2026-04-10T19:23:51","modified_gmt":"2026-04-10T19:23:51","slug":"ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/","title":{"rendered":"FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <p>On February 19, the Federal Energy Regulatory Commission (FERC) approved a set of five new grid reliability standards developed by the North American Electric Reliability Corporation (NERC). These standards target a central challenge: as solar, wind, batteries and other modern energy resources expand rapidly, the data and models used to plan and operate the grid have not kept pace.<\/p>\n<p>FERC\u2019s order consolidates three NERC petitions and approves the Milestone 3 Reliability Standards focused on inverter-based resources (IBRs). Together, these updates strengthen requirements for data sharing, system modeling and model validation, capabilities that are increasingly critical as IBRs and distributed energy resources (DERs) make up a growing share of the power system.<\/p>\n<p>Developed under Order No. 901, the five standards enhance how grid operators collect data, build models, and validate system performance across both planning and operational timeframes.<\/p>\n<p>Collectively these standards:<\/p>\n<ul>\n<li>Address the rapid growth of inverter\u2011based resources from solar, wind and batteries<\/li>\n<li>Improve data transparency, model accuracy and system visibility<\/li>\n<li>Fulfill key directives under Order No. 901, with additional standards expected later in 2026<\/li>\n<\/ul>\n<h2>Summary of Key Standards Modifications<\/h2>\n<h3>MOD\u2011032\u20112 \u2014 Data for Power System Modeling and Analysis<\/h3>\n<ul>\n<li>Establishes consistent modeling data requirements for planning horizon cases<\/li>\n<li>Expands data collection to include IBRs and aggregate DERs<\/li>\n<li>Supports more accurate system models for reliability assessments<\/li>\n<\/ul>\n<h3>IRO\u2011010\u20116 \u2014 Reliability Coordinator Data Specification and Collection<\/h3>\n<ul>\n<li>Ensures that Reliability Coordinators receive all necessary operational data, including IBR\u2011related information<\/li>\n<li>Aims to prevent instability, uncontrolled separation or cascading outages by improving situational awareness<\/li>\n<\/ul>\n<h3>TOP\u2011003\u20118 \u2014 Transmission Operator and Balancing Authority Data Specification and Collection<\/h3>\n<ul>\n<li>Updates data requirements for Transmission Operators and Balancing Authorities<\/li>\n<li>Enhances IBR and DER data sharing to support real\u2011time operations and reliability assessments<\/li>\n<\/ul>\n<h3>MOD\u2011033\u20113 \u2014 Steady\u2011State and Dynamic System Model Validation<\/h3>\n<ul>\n<li>Improves system model validation processes, explicitly incorporating IBR and DER behavior<\/li>\n<li>Strengthens the ability to compare model performance against actual system response during system disturbances<\/li>\n<\/ul>\n<h3>MOD\u2011026\u20112 \u2014 Verification and Validation of Generator Dynamic Models<\/h3>\n<ul>\n<li>Combines the currently in effect MOD\u2011026\u20111 and MOD\u2011027\u20111 into a unified standard<\/li>\n<li>Adds enhanced requirements for verifying and validating dynamic models, including those for IBR\u2011connected facilities<\/li>\n<li>Supports more accurate dynamic simulations and disturbance response modeling<\/li>\n<\/ul>\n<p>Among these changes, MOD-032-2 serves as the foundation. It governs what data gets collected and how it must be provided for planning models. Without complete and consistent modeling data, especially for IBRs and DERs, other reliability preserving activities could be compromised. By requiring uniform data submission across all Generator Owners, Transmission Planners and Distribution Providers, the standard expands data requirements specifically to IBRs and aggregate DERs which have been a significant vulnerability in system models which are the core tools used to assess reliability on a forward-looking basis.<\/p>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/regulatory-compliance\/nerc\/ \" target=\"_self\">NERC Compliance<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-generation-engineering\/\" target=\"_self\">Power Generation Engineering<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-system-studies\/ \" target=\"_self\">Power System Studies<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/transmission-engineering\/\" target=\"_self\">Transmission Engineering<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                                                            <div class=\"wysiwyg__links__bottom\">\n                                    <a href=\"https:\/\/www.trccompanies.com\/services\" target=\"_self\">View All Services<\/a>\n                                <\/div>\n                                                                                                <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white-fog\">\n    <div class=\"container-fluid\">\n                    <div class=\"wysiwyg__wrapper\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h2>Next Steps<\/h2>\n<p>With FERC&rsquo;s approval of the Milestone 3 Reliability Standards now in effect, utilities should begin assessing how these requirements affect current compliance programs. Key actions to consider include:<\/p>\n<ul>\n<li><strong>Assess IBR and DER data inventories.<\/strong> MOD-032-2 establishes the data foundation for all downstream reliability activities. Entities with significant IBR or aggregate DER interconnections should audit current data submissions for completeness and accuracy against the expanded requirements.<\/li>\n<li><strong>Update model validation workflows.<\/strong> MOD-033-3 and MOD-026-2 introduce enhanced validation obligations. Organizations should review their existing disturbance monitoring, model benchmarking and dynamic simulation processes to ensure alignment with the consolidated standard.<\/li>\n<li><strong>Monitor for additional Order No. 901 standards.<\/strong> FERC and NERC have signaled that further Milestone standards are expected later in 2026. Proactive planning now will position your organization to respond efficiently as those requirements are finalized.<\/li>\n<li><strong>Contact TRC for compliance support.<\/strong> TRC&rsquo;s NERC Compliance Services team can assist with gap assessments, data collection program development, model validation planning, and ongoing regulatory monitoring to help your organization stay ahead of evolving IBR-related obligations.<\/li>\n<\/ul>\n                <\/div>\n                                <\/div>\n\n                    <\/div>\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-related-materials -->\n<section class=\"material-cards bg-purple-gradient\">\n    <div class=\"container-fluid js-animated-content animated-content\">\n        <div class=\"material-cards__headlines has-limited-item js-animated-content animated-content\">\n            <div class=\"material-card__content js-animated-content animated-content\">\n                <h2>Resources<\/h2>\n            <\/div>\n            <div class=\"material-card__link\">\n                            <\/div>\n        <\/div>\n        <div class=\"row  js-related-marterial-container \" data-item=\"3\">\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                FERC Milestone 3 February 19, 2026 Order                             <\/h5>\n                            <p class=\"material-card__description\">February 19, 2026 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.ferc.gov\/media\/e-6-rd26-1-000\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                NERC Order No. 901 Work Plan                             <\/h5>\n                            <p class=\"material-card__description\">January 18, 2024 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.nerc.com\/globalassets\/who-we-are\/legal--regulatory\/filings--orders\/nerc-filings-to-ferc\/2024\/nerc-compliance-filing-order-no-901-work-plan_packaged---public-label.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                    <\/div>\n\n        <div class=\"material-cards__bottom text-right hidden-lg\">\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-related-materials -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n                    <div class=\"wysiwyg__wrapper\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h2>About TRC\u2019s NERC Compliance Practice<\/h2>\n<p>TRC\u2019s approach to power system compliance planning practice balances solutions that incorporate appropriate standards, regulatory requirements, best practices and operational goals and budgets. Our work for public and private sector utility clients is a testament to our understanding of NERC compliance related aspects of your organization. Our successful application of technology solutions in a constantly evolving industry and regulatory landscape will provide you with confidence regarding your power system compliance programs. Our power system experts help you stay ahead of changing regulatory expectations because they stay engaged with the regulatory process and know how to plan, design and install programs that address your financial, technical and scheduling goals including compliance with changing NERC standards and guidelines as well as industry \u201cbest practices\u201d and the latest technology developments.<\/p>\n<p>This regulatory update is a service to TRC\u2019s utility clients, helping keep you informed of issues that increase your company\u2019s compliance risks along with related topics regarding future regulatory developments to help you achieve your company\u2019s business goals.<\/p>\n                <\/div>\n                                <\/div>\n\n                    <\/div>\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: core\/paragraph -->\n<div class=\"container\"><div class=\"row\"><div class=\"col-xxs-12\">\n<p><\/p>\n<\/div><\/div><\/div>\n<!-- End Block: core\/paragraph -->","protected":false},"excerpt":{"rendered":"<p>On February 19, the Federal Energy Regulatory Commission (FERC) approved a set of five new grid reliability standards developed by the North American Electric Reliability Corporation (NERC). These standards target a central challenge: as solar, wind, batteries and other modern energy resources expand rapidly, the data and models used to plan and operate the grid have not kept pace.<\/p>\n","protected":false},"featured_media":34572,"template":"","tags":[251,1039,1076,337],"news-and-insights-category":[360],"services-category":[994],"custom_category":[1010],"class_list":["post-34570","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-nerc","tag-power-generation-engineering","tag-power-system-studies","tag-transmission-engineering","news-and-insights-category-regulatory-updates","services-category-regulatory-compliance","custom_category-power-utilities-markets"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs - TRC Companies<\/title>\n<meta name=\"description\" content=\"FERC approves Milestone 3 grid reliability standards to improve IBR data, modeling, and compliance for utilities and power operators.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs - TRC Companies\" \/>\n<meta property=\"og:description\" content=\"FERC approves Milestone 3 grid reliability standards to improve IBR data, modeling, and compliance for utilities and power operators.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-10T19:23:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1024x576.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/\",\"name\":\"FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs - TRC Companies\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894.jpg\",\"datePublished\":\"2026-04-10T19:23:48+00:00\",\"dateModified\":\"2026-04-10T19:23:51+00:00\",\"description\":\"FERC approves Milestone 3 grid reliability standards to improve IBR data, modeling, and compliance for utilities and power operators.\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894.jpg\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894.jpg\",\"width\":4000,\"height\":2250,\"caption\":\"Aerial view of the solar panel in solar farm in evening sun light, West Sussex, UK.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs - TRC Companies","description":"FERC approves Milestone 3 grid reliability standards to improve IBR data, modeling, and compliance for utilities and power operators.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/","og_locale":"fr_CA","og_type":"article","og_title":"FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs - TRC Companies","og_description":"FERC approves Milestone 3 grid reliability standards to improve IBR data, modeling, and compliance for utilities and power operators.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/","og_site_name":"TRC Companies","article_modified_time":"2026-04-10T19:23:51+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1024x576.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/","name":"FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs - TRC Companies","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894.jpg","datePublished":"2026-04-10T19:23:48+00:00","dateModified":"2026-04-10T19:23:51+00:00","description":"FERC approves Milestone 3 grid reliability standards to improve IBR data, modeling, and compliance for utilities and power operators.","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894.jpg","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894.jpg","width":4000,"height":2250,"caption":"Aerial view of the solar panel in solar farm in evening sun light, West Sussex, UK."},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/34570","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":3,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/34570\/revisions"}],"predecessor-version":[{"id":34629,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/34570\/revisions\/34629"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/34572"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=34570"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=34570"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=34570"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=34570"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=34570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}