{"id":31183,"date":"2025-10-30T16:12:22","date_gmt":"2025-10-30T16:12:22","guid":{"rendered":"https:\/\/www.trccompanies.com\/?post_type=news-and-insights&#038;p=31183"},"modified":"2025-11-05T16:03:14","modified_gmt":"2025-11-05T16:03:14","slug":"nerc-targets-cold-weather-performance","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/","title":{"rendered":"NERC Targets Cold Weather Performance"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <p><span data-contrast=\"auto\">On September 18, 2025, the Federal Energy Regulatory Commission (FERC) approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard. This new standard strengthens generator cold weather preparedness requirements and improves the process for declaring Generator Cold Weather Constraints. These enhancements aim to ensure more reliable power generation during extreme cold weather events.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h2>Background<span data-ccp-props=\"{}\">\u00a0<\/span><\/h2>\n<p><span data-contrast=\"auto\">When approving the previous version, <\/span><b><span data-contrast=\"auto\">EOP-012-2<\/span><\/b><span data-contrast=\"auto\">, FERC required NERC to revise the standard within nine months to address several key issues:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Clarify the definition of Generator Cold Weather Constraint.<\/span><span data-ccp-props=\"{&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Ensure NERC validates all Constraint declarations through a review and approval process.<\/span><span data-ccp-props=\"{&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Shorten and clarify timelines for implementing corrective action plans under Requirement R7.<\/span><span data-ccp-props=\"{&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Require NERC pre-approval for any extensions beyond the allowed implementation period.<\/span><span data-ccp-props=\"{&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Mandate more frequent reviews to confirm ongoing validity of Constraint declarations.<\/span><span data-ccp-props=\"{&quot;335559738&quot;:240,&quot;335559739&quot;:240}\">\u00a0<\/span><\/li>\n<\/ul>\n<h2>Key Updates in EOP-012-3\u00a0<\/h2>\n<p><span data-contrast=\"auto\">TRC clients should note that EOP-012-3 contains nine requirements and one attachment.\u00a0 Requirements R1 through R8 have been carried over and modified from the prior version of the Standard, while Requirement R9 and Attachment 1 are new.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Additionally, NERC has revised the definition of Generator Cold Weather Constraint in the NERC Glossary. Previously, generator owners were able to decline implementing certain freeze protection measures on existing or new equipment as part of correction action plans. While this option remains in EOP-012-3, NERC has clarified its proposed modifications by removing references to \u201ccost,\u201d \u201creasonable cost,\u201d \u201cunreasonable cost\u201d and \u201cgood business practices.\u201d<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h2>Key Actions Required of Generator Owners\u00a0<\/h2>\n<p><span data-contrast=\"auto\">To ensure compliance and readiness, Generator Owners should:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Review the FERC\u2019s EOP-012-3 Order and the final standard.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Review internal compliance controls designed to assure compliance and identify changes needed considering the changes to the standard.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Assess their generating facilities for cold weather performance capability in accordance with the revised standard.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Submit accurate status of expected cold weather performance to the applicable reliability coordinator.<\/span><\/li>\n<li><span data-contrast=\"auto\">Stay informed regarding evolving standards and participate in NERC webinars and outreach.<\/span><\/li>\n<\/ul>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/regulatory-compliance\/nerc\/\" target=\"_self\">NERC Compliance<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-generation-engineering\/\" target=\"_self\">Power Generation Engineering<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-system-studies\/\" target=\"_self\">Power System Studies<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                                                            <div class=\"wysiwyg__links__bottom\">\n                                    <a href=\"https:\/\/www.trccompanies.com\/services\" target=\"_self\">View All Services<\/a>\n                                <\/div>\n                                                                                                <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-light-gradient\">\n    <div class=\"container-fluid\">\n                    <div class=\"wysiwyg__wrapper\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h2>Next Steps: TRC Can Help\u00a0<\/h2>\n<p><span data-contrast=\"auto\">TRC\u2019s approach to power system development integrates regulatory requirements, industry best practices and operational goals. Our deep understanding of NERC compliance enables us to support both public and private utility clients in navigating evolving standards. We offer:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Strategic planning and design of compliance programs<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Technology solutions tailored to regulatory and operational needs<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Expertise in implementing programs that meet financial, technical and scheduling goals<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Our ongoing engagement with regulatory developments keeps your systems ahead of the curve.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This regulatory update is a part of TRC\u2019s commitment to helping utility clients stay informed and prepared for changes that impact your company\u2019s electric reliability and regulatory compliance.\u00a0\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n                <\/div>\n                                <\/div>\n\n                    <\/div>\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-related-materials -->\n<section class=\"material-cards bg-purple-gradient\">\n    <div class=\"container-fluid js-animated-content animated-content\">\n        <div class=\"material-cards__headlines  js-animated-content animated-content\">\n            <div class=\"material-card__content js-animated-content animated-content\">\n                <h2>Related Resources<\/h2>\n            <\/div>\n            <div class=\"material-card__link\">\n                            <\/div>\n        <\/div>\n        <div class=\"row js-related-material-slider js-related-marterial-container \" data-item=\"3\">\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                EOP-012-3 Standard                             <\/h5>\n                            <p class=\"material-card__description\">2024 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.nerc.com\/pa\/Stand\/Reliability%20Standards\/EOP-012-3.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                EOP-012-3 redline to last approved EOP-012-2                            <\/h5>\n                            <p class=\"material-card__description\">March 2025 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.nerc.com\/pa\/Stand\/Project202403RevisionstoEOP0122DL\/2024-03_EOP-012-3_Redline_to_Last_Approved_032825.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                EOP-012-3 Implementation Plan                            <\/h5>\n                            <p class=\"material-card__description\">March 2025 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.nerc.com\/pa\/Stand\/Project202403RevisionstoEOP0122DL\/2024-03_EOP-012-3_Implementation_Plan_Clean_032825.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                EOP-012-3 Reliability Standard Audit Worksheet                            <\/h5>\n                            <p class=\"material-card__description\">2025 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.nerc.com\/pa\/comp\/Reliability%20Standard%20Audits%20Worksheets%20DL\/RSAW%20EOP-012-3_2025_v1.docx\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                FERC September 18, 2025 Order approving EOP-012-3                            <\/h5>\n                            <p class=\"material-card__description\">September 18, 2025 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.ferc.gov\/media\/e-3-rd25-7-000\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                NERC Resources on Cold Weather Preparation                             <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.nerc.com\/pa\/rrm\/ea\/PapersDocumentsAssessmentsDL\/NERC_info_cold_weather_prep_bps_impacts_20231130.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                NERC September 4, 2025 Webinar on Preparation for Cold Weather                            <\/h5>\n                            <p class=\"material-card__description\">September 2025 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.youtube.com\/watch?v=NzmPqjkYayo\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                TRC Regulatory Update on PRC-012-2 proposed changes                             <\/h5>\n                            <p class=\"material-card__description\">March 26, 2024 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/insights\/nerc-proposes-clarifications-to-eop-cold-weather-standards\/\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                    <\/div>\n\n        <div class=\"material-cards__bottom text-right hidden-lg\">\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-related-materials -->","protected":false},"excerpt":{"rendered":"<p>On September 18, 2025, the Federal Energy Regulatory Commission (FERC) approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard.<\/p>\n","protected":false},"featured_media":31184,"template":"","tags":[1072,1039,1076],"news-and-insights-category":[],"services-category":[],"custom_category":[],"class_list":["post-31183","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-nerc-compliance","tag-power-generation-engineering","tag-power-system-studies"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NERC Targets Cold Weather Performance - TRC Companies<\/title>\n<meta name=\"description\" content=\"On September 18, 2025, FERC approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard. Learn more about the changes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NERC Targets Cold Weather Performance - TRC Companies\" \/>\n<meta property=\"og:description\" content=\"On September 18, 2025, FERC approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard. Learn more about the changes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-05T16:03:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/\",\"name\":\"NERC Targets Cold Weather Performance - TRC Companies\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg\",\"datePublished\":\"2025-10-30T16:12:22+00:00\",\"dateModified\":\"2025-11-05T16:03:14+00:00\",\"description\":\"On September 18, 2025, FERC approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard. Learn more about the changes.\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Engineer working at petrol refinery plant site with laptop and handsfree device.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NERC Targets Cold Weather Performance - TRC Companies","description":"On September 18, 2025, FERC approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard. Learn more about the changes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/","og_locale":"fr_CA","og_type":"article","og_title":"NERC Targets Cold Weather Performance - TRC Companies","og_description":"On September 18, 2025, FERC approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard. Learn more about the changes.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/","og_site_name":"TRC Companies","article_modified_time":"2025-11-05T16:03:14+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/","name":"NERC Targets Cold Weather Performance - TRC Companies","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg","datePublished":"2025-10-30T16:12:22+00:00","dateModified":"2025-11-05T16:03:14+00:00","description":"On September 18, 2025, FERC approved EOP-012-3, NERC\u2019s updated Extreme Cold Weather Reliability standard. Learn more about the changes.","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-targets-cold-weather-performance\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/10\/GettyImages-2160118425-scaled.jpg","width":2560,"height":1707,"caption":"Engineer working at petrol refinery plant site with laptop and handsfree device."},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/31183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/31183\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/31184"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=31183"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=31183"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=31183"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=31183"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=31183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}