{"id":26580,"date":"2025-04-21T13:37:53","date_gmt":"2025-04-21T13:37:53","guid":{"rendered":"https:\/\/www.trccompanies.com\/?post_type=news-and-insights&#038;p=26580"},"modified":"2026-02-27T14:35:02","modified_gmt":"2026-02-27T14:35:02","slug":"ferc-examines-co-located-load-and-generation-rule","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/","title":{"rendered":"FERC Examines Co-Located Load and Generation Rule\u00a0"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <p><span data-contrast=\"auto\">Since FERC hosted its <\/span><a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-reviews-large-load-integration-at-technical-conference\/\"><span data-contrast=\"none\">technical conference in late 2024<\/span><\/a><span data-contrast=\"auto\">, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located loads and generation. Several industry stakeholders support studying co-located loads together, arguing this approach could mitigate resource adequacy risks. <\/span><a href=\"https:\/\/www.ferc.gov\/media\/e-1-el25-49-000\"><span data-contrast=\"none\">One official complaint was filed<\/span><\/a><span data-contrast=\"auto\">, calling for a review of PJM\u2019s handling of large co-located loads at generating facilities. The complaint and the technical conference comments prompted FERC to open a new docket focused on whether PJM\u2019s tariff should include rules that provide clarity for the connection of large loads while maintaining grid reliability and cost fairness. \u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">FERC\u2019s new proceeding specifically addresses the PJM interconnection process but is likely to influence broader national policy around co-location and large load additions. PJM and its Transmission Owners must respond within 30 days, either justifying the current PJM tariff as \u201cjust and reasonable\u201d or, proposing changes to address FERC\u2019s concerns.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">At the heart of the issue is cost responsibility. Some large load representatives argue that fully isolated co-located loads, those that do not use the grid for power supply, should not be subject to wholesale service charges or network transmission fees. On the other side, utility representatives and others argue that even these isolated loads serve to benefit from the presence of a grid connections and receive ancillary services such as voltage support and frequency stability, overall reliability and availability and therefore should contribute their fair share toward transmission system costs. <\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Meanwhile, stakeholders are proposing a range of co-location models for consideration. Some advocate for combining new renewable generation with existing fossil fuel plants to serve local load behind the meter, with surplus energy sold to the grid. Others call for more flexible planning for infrastructure expansion.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The new FERC docket acknowledges jurisdictional complexities related to co-location arrangements. The proceeding involves both federal and state interests, requiring the involvement of FERC, state public utility commissions and other state and local entities. FERC noted that it is a creature of federal statute and has jurisdiction only over those specific matters that Congress has given it the authority to regulate. In its order FERC articulated those matters to define its jurisdiction.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">FERC also provided an extensive list of specific briefing questions for respondents to address (See part D of the Order).<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Navigating these evolving FERC policies requires proactive planning. TRC\u2019s experts can help assess your large-load interconnection needs, evaluate compliance risks and support strategic planning. TRC clients are advised to review the FERC Order and consider how these changes might impact their operations.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3><b><span data-contrast=\"auto\">Resources<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/h3>\n<p><a href=\"https:\/\/www.ferc.gov\/media\/e-1-el25-49-000\"><span data-contrast=\"none\">FERC Order Instituting Consolidated Proceedings<\/span><\/a><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/large-data-center-load-loss-raises-for-system-impact-studies\/\"><span data-contrast=\"none\">TRC Regulatory Update on Data Center Load Loss Incident<\/span><\/a><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Power-System-Studies-Practice-Overview.pdf\"><span data-contrast=\"none\">TRC Power System Studies Overview Services<\/span><\/a><span data-contrast=\"none\">\u202f<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<h3><b><span data-contrast=\"auto\">About TRC\u2019s NERC System Studies and NERC Compliance Practice<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">TRC\u2019s approach to power system development and operation balances solutions that incorporate appropriate standards, regulatory requirements, best practices and operational goals and budgets. Our work for public and private sector utility clients is a testament to our understanding of NERC compliance related aspects of your business. Our successful application of technology solutions in a constantly evolving business and regulatory landscape provides you with confidence in your power system compliance programs. Our <a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-system-studies\/\">power system experts<\/a> help you stay ahead of changing regulatory expectations because they stay engaged with the regulatory process and know how to plan, design and install programs that address your financial, technical and scheduling goals including compliance with changing NERC standards and guidelines as well as industry \u201cbest practices\u201d and the latest technology developments.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This regulatory update is a service to TRC\u2019s utility clients, helping keep you informed of issues that impact your company\u2019s electric reliability risks along with related topics regarding future regulatory developments to help you achieve your company\u2019s business goals.\u00a0<\/span><\/p>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/regulatory-compliance\/nerc\/\" target=\"_self\">NERC<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-generation-engineering\/\" target=\"_self\">Power Generation Engineering<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-system-studies\/\" target=\"_self\">Power System Studies<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/regulatory-compliance\/\" target=\"_self\">Regulatory Compliance<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                                                            <div class=\"wysiwyg__links__bottom\">\n                                    <a href=\"https:\/\/www.trccompanies.com\/services\" target=\"_self\">View All Services<\/a>\n                                <\/div>\n                                                                                                <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-cta-bar -->\n<section class=\"global-cta innerpage-cta cta-purple\">\n    <div class=\"container-fluid\">\n        <div class=\"global-cta-wrapper  \">\n                                            <h2>Embrassez le changement<\/h2>\n                                <div class=\"global-cta-image\">\n                    <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" width=\"316.566\" height=\"369\" viewBox=\"0 0 316.566 369\">\n                        <defs>\n                            <pattern id=\"pattern\" width=\"1\" height=\"1\" viewBox=\"117.006 0 316.566 369\">\n                                <image preserveAspectRatio=\"xMidYMid slice\" width=\"655.35\" height=\"369\" href=\"\/wp-content\/uploads\/2024\/08\/043b4c82-renewables.jpg\"><\/image>\n                            <\/pattern>\n                        <\/defs>\n                        <path id=\"Union_8\" data-name=\"Union 8\" d=\"M72.087,369,206.869,190.294h109.7L182.891,369ZM0,195.818H68.4l28.66,44.507L68.4,286.43Zm0-10.747L68.4,94.466l28.66,46.1L68.4,185.071Zm205.769-6.365L72.087,0h109.7L316.566,178.706Z\" fill=\"url(#pattern)\"\/>\n                    <\/svg>\n                <\/div>\n                <div class=\"global-cta-content\">\n                    <p>Collaborez avec les praticiens test\u00e9s de TRC<\/p>\n                    <p>\n                        <a href=\"https:\/\/www.trccompanies.com\/contact-us\/\" title=\"Contact Us\" class=\"btn btn-primary\" >Contact Us<\/a>                    <\/p>\n                <\/div>\n                        \n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-cta-bar -->\n\n<!-- Start Block: core\/paragraph -->\n<div class=\"container\"><div class=\"row\"><div class=\"col-xxs-12\">\n<p><\/p>\n<\/div><\/div><\/div>\n<!-- End Block: core\/paragraph -->","protected":false},"excerpt":{"rendered":"<p>Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation. <\/p>\n","protected":false},"featured_media":26581,"template":"","tags":[251,1039,402,300],"news-and-insights-category":[360],"services-category":[1005,994],"custom_category":[1010],"class_list":["post-26580","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-nerc","tag-power-generation-engineering","tag-power-systems-studies","tag-regulatory-compliance","news-and-insights-category-regulatory-updates","services-category-electrical-and-power","services-category-regulatory-compliance","custom_category-power-utilities-markets"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>FERC Examines Co-Located Load and Generation Rule<\/title>\n<meta name=\"description\" content=\"Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FERC Examines Co-Located Load and Generation Rule\" \/>\n<meta property=\"og:description\" content=\"Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-27T14:35:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1491\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/\",\"name\":\"FERC Examines Co-Located Load and Generation Rule\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg\",\"datePublished\":\"2025-04-21T13:37:53+00:00\",\"dateModified\":\"2026-02-27T14:35:02+00:00\",\"description\":\"Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation.\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg\",\"width\":2560,\"height\":1491,\"caption\":\"Aerial view of data centers being built in Leesburg, VA.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"FERC Examines Co-Located Load and Generation Rule","description":"Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/","og_locale":"fr_CA","og_type":"article","og_title":"FERC Examines Co-Located Load and Generation Rule","og_description":"Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/","og_site_name":"TRC Companies","article_modified_time":"2026-02-27T14:35:02+00:00","og_image":[{"width":2560,"height":1491,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/","name":"FERC Examines Co-Located Load and Generation Rule","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg","datePublished":"2025-04-21T13:37:53+00:00","dateModified":"2026-02-27T14:35:02+00:00","description":"Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation.","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-scaled.jpg","width":2560,"height":1491,"caption":"Aerial view of data centers being built in Leesburg, VA."},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/26580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/26580\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/26581"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=26580"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=26580"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=26580"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=26580"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=26580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}