{"id":22060,"date":"2024-10-31T17:50:12","date_gmt":"2024-10-31T17:50:12","guid":{"rendered":"https:\/\/www.trccompanies.com\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/"},"modified":"2024-11-27T14:17:49","modified_gmt":"2024-11-27T14:17:49","slug":"la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/","title":{"rendered":"La NERC approuve les normes li\u00e9es \u00e0 l\u2019IBR ayant une incidence sur la production d\u2019\u00e9nergie renouvelable"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <p>Le 8 octobre 2024, le conseil d\u2019administration de la NERC a approuv\u00e9 la norme PRC-029-1 qui \u00e9tablit les exigences de performance des ressources bas\u00e9es sur les onduleurs (IBR) pour les \u00e9v\u00e9nements de covoiturage. De plus, le document PRC-024-4 a \u00e9t\u00e9 modifi\u00e9 pour limiter son applicabilit\u00e9 aux machines synchrones. Les normes seront bient\u00f4t d\u00e9pos\u00e9es et en attente de l\u2019approbation finale de la FERC. La NERC a \u00e9galement vot\u00e9 en faveur de l\u2019am\u00e9lioration de la d\u00e9finition de la conduite pour inclure la \u00ab&nbsp;capacit\u00e9 de r\u00e9sister aux perturbations de tension ou de fr\u00e9quence \u00e0 l\u2019int\u00e9rieur des limites d\u00e9finies et de continuer \u00e0 fonctionner comme sp\u00e9cifi\u00e9&nbsp;\u00bb. Par rapport \u00e0 la d\u00e9finition pr\u00e9c\u00e9dente, la nouvelle d\u00e9finition offre une sp\u00e9cificit\u00e9 aux limites, au lieu de faire r\u00e9f\u00e9rence au syst\u00e8me \u00ab&nbsp;dans son int\u00e9gralit\u00e9&nbsp;\u00bb.    <\/p>\n<p>Les nouvelles normes \u00e9tablissent des crit\u00e8res de stabilit\u00e9 rigoureux pour les IRV en fonction des diff\u00e9rentes r\u00e9ponses dynamiques aux perturbations par rapport aux g\u00e9n\u00e9rateurs synchrones traditionnels. En vertu de ces normes, l\u2019int\u00e9gration des IRV devra \u00e9valuer les impacts de leurs projets propos\u00e9s sur la stabilit\u00e9 du syst\u00e8me et potentiellement se tourner vers des technologies plus favorables au r\u00e9seau, telles que les onduleurs de formation de grille par opposition aux onduleurs suivant le r\u00e9seau qui sont actuellement le choix typique. <\/p>\n<p>\u00c0 la suite des mesures prises par la NERC pour donner suite aux normes actuelles de l\u2019industrie et des am\u00e9liorations apport\u00e9es au prc-029-1 propos\u00e9, les r\u00e9visions apport\u00e9es \u00e0 la norme comprennent :<\/p>\n<ul>\n<li>La d\u00e9finition r\u00e9vis\u00e9e de l\u2019expression \u00ab Ride-through \u00bb<\/li>\n<li>Aligner les crit\u00e8res de trajet en fr\u00e9quence avec les valeurs IEEE 2800-2022&nbsp;;<\/li>\n<li>permettre un ensemble limit\u00e9 d\u2019exemptions document\u00e9es pour les limites mat\u00e9rielles pour les crit\u00e8res de trajet en fr\u00e9quence&nbsp;;<\/li>\n<li>Permet aux propri\u00e9taires de g\u00e9n\u00e9rateurs de partager des renseignements jug\u00e9s exclusifs par le fabricant de l\u2019\u00e9quipement d\u2019origine avec l\u2019autorit\u00e9 charg\u00e9e de l\u2019application de la conformit\u00e9.<\/li>\n<\/ul>\n<p>Une analyse d\u00e9taill\u00e9e de la norme PRC-029-1 propos\u00e9e peut \u00eatre consult\u00e9e en examinant la note de <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/11\/Memo-Summary-of-Issues-PRC-029-1.pdf\" target=\"_blank\" rel=\"noopener\">service<\/a> au conseil d\u2019administration de la NERC publi\u00e9e le 24 septembre 2024. Les clients du CRT sont encourag\u00e9s \u00e0 examiner les nouvelles normes et les documents connexes, puis \u00e0 tenir compte de l\u2019impact potentiel sur leur int\u00e9gration de l\u2019IBR renouvelable et leurs activit\u00e9s de conformit\u00e9 \u00e0 la NERC. <\/p>\n                <\/div>\n                                <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg --><!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-blanc-brouillard\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h3>Initiative d\u2019enregistrement de l\u2019IBR de la NERC<\/h3>\n<p>Parall\u00e8lement \u00e0 la norme approuv\u00e9e, la NERC met activement en \u0153uvre un programme d\u2019enregistrement des ressources de l\u2019IBR. La mise \u00e0 jour du T4 2024 de l\u2019initiative d\u2019inscription IBR de la NERC pr\u00e9sente les progr\u00e8s r\u00e9alis\u00e9s, met en \u00e9vidence les activit\u00e9s cl\u00e9s en mati\u00e8re de juridique, d\u2019enregistrement, de normes, de sensibilisation des parties prenantes et d\u2019engagements E-ISAC et fournit les ressources disponibles. Cette mise \u00e0 jour a \u00e9t\u00e9 \u00e9labor\u00e9e dans le cadre des efforts continus de la NERC pour s\u2019assurer que l\u2019industrie et les intervenants sont tenus inform\u00e9s tout au long de ce projet essentiel en trois phases. De plus amples renseignements sur ce projet sont disponibles dans le Guide de r\u00e9f\u00e9rence rapide de l\u2019Initiative d\u2019inscription de l\u2019IBR.   <\/p>\n<p>TRC a des sp\u00e9cialistes qualifi\u00e9s pour vous aider, vous et votre programme de conformit\u00e9 NERC, \u00e0 garder une longueur d\u2019avance sur les prochains changements de normes li\u00e9s \u00e0 l\u2019IBR.<\/p>\n<h3>Ressources :<\/h3>\n<p><a href=\"https:\/\/www.nerc.com\/pa\/Stand\/Pages\/Project_2020-02_Transmission-connected_Resources.aspx\" target=\"_blank\" rel=\"noopener\">Page du projet d\u2019\u00e9laboration de normes NERC 2020-02<\/a><br \/><a href=\"https:\/\/www.nerc.com\/pa\/Stand\/Documents\/Memo_Summary%20of%20Issues%20and%20Alternatives%20Considered_Proposed%20Reliability%20Standard%20PRC-029-1.pdf\" target=\"_blank\" rel=\"noopener\">Note de service du 24 septembre 2024 au conseil d\u2019administration de la NERC d\u00e9crivant les questions relatives \u00e0 la PRC-029-1<\/a><br \/><a href=\"https:\/\/www.nerc.com\/pa\/Documents\/IBR_Quick%20Reference%20Guide.pdf\" target=\"_blank\" rel=\"noopener\">NERC IBR Registration Initiative Q4 Report<\/a><br \/><a href=\"https:\/\/trc-solutions-production.storage.googleapis.com\/wp-content\/uploads\/2024\/06\/03101340\/NERC-Compliance-Support-Services-%E2%80%93-Renewable-Energy-Projects.pdf\" target=\"_blank\" rel=\"noopener\">Services de soutien \u00e0 la conformit\u00e9 de la NERC \u2013 Projets d\u2019\u00e9nergie renouvelable<\/a><br \/><a href=\"https:\/\/trc-solutions-production.storage.googleapis.com\/wp-content\/uploads\/2023\/12\/21155832\/NERC_Compliance_for_Registered_Generator_Operators_and_Owners.pdf\" target=\"_blank\" rel=\"noopener\">Conformit\u00e9 \u00e0 la NERC pour les exploitants et les propri\u00e9taires de g\u00e9n\u00e9rateurs inscrits<\/a><\/p>\n                <\/div>\n                                <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg --><!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h3>\u00c0 propos de la pratique de conformit\u00e9 nerc de TRC&nbsp;:<\/h3>\n<p>L\u2019approche de TRC en mati\u00e8re de d\u00e9veloppement de r\u00e9seaux \u00e9lectriques et d\u2019analyse du rendement op\u00e9rationnel \u00e9quilibre les solutions qui int\u00e8grent des normes appropri\u00e9es, des exigences r\u00e9glementaires, des pratiques exemplaires, ainsi que des objectifs et des budgets op\u00e9rationnels. Notre travail pour les clients des services publics et priv\u00e9s t\u00e9moigne de notre compr\u00e9hension des aspects li\u00e9s \u00e0 la conformit\u00e9 NERC de votre entreprise. Notre application r\u00e9ussie de solutions technologiques dans un paysage commercial et r\u00e9glementaire en constante \u00e9volution vous donnera confiance en ce qui concerne les programmes de conformit\u00e9 de votre syst\u00e8me d\u2019alimentation. Nos experts en syst\u00e8mes d\u2019alimentation vous aident \u00e0 garder une longueur d\u2019avance sur l\u2019\u00e9volution des attentes r\u00e9glementaires, car ils restent engag\u00e9s dans le processus r\u00e9glementaire et savent comment planifier, concevoir et installer des programmes qui r\u00e9pondent \u00e0 vos objectifs financiers, techniques et de planification, y compris la conformit\u00e9 aux normes et directives de s\u00e9curit\u00e9 nerc changeantes ainsi que les \u00ab&nbsp;meilleures pratiques&nbsp;\u00bb de l\u2019industrie et les derniers d\u00e9veloppements technologiques.   <\/p>\n<p><em>Cette mise \u00e0 jour r\u00e9glementaire est un service aux clients des services publics de TRC, vous aidant \u00e0 vous tenir au courant des probl\u00e8mes qui ont une incidence sur les risques de s\u00e9curit\u00e9 du syst\u00e8me \u00e9lectrique de votre entreprise ainsi que des sujets connexes concernant les d\u00e9veloppements r\u00e9glementaires futurs pour vous aider \u00e0 atteindre les objectifs commerciaux de votre entreprise.<\/em><\/p>\n                <\/div>\n                                <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg --><!-- Start Block: acf\/innerpage-cta-bar -->\n<section class=\"global-cta innerpage-cta default\">\n    <div class=\"container-fluid\">\n        <div class=\"global-cta-wrapper  \">\n                                            <h2>Embrassez le changement<\/h2>\n                                <div class=\"global-cta-image\">\n                    <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" width=\"316.566\" height=\"369\" viewBox=\"0 0 316.566 369\">\n                        <defs>\n                            <pattern id=\"pattern\" width=\"1\" height=\"1\" viewBox=\"117.006 0 316.566 369\">\n                                <image preserveAspectRatio=\"xMidYMid slice\" width=\"655.35\" height=\"369\" href=\"\/wp-content\/uploads\/2024\/08\/043b4c82-renewables.jpg\"><\/image>\n                            <\/pattern>\n                        <\/defs>\n                        <path id=\"Union_8\" data-name=\"Union 8\" d=\"M72.087,369,206.869,190.294h109.7L182.891,369ZM0,195.818H68.4l28.66,44.507L68.4,286.43Zm0-10.747L68.4,94.466l28.66,46.1L68.4,185.071Zm205.769-6.365L72.087,0h109.7L316.566,178.706Z\" fill=\"url(#pattern)\"\/>\n                    <\/svg>\n                <\/div>\n                <div class=\"global-cta-content\">\n                    <p>Collaborez avec les praticiens test\u00e9s de TRC<\/p>\n                    <p>\n                        <a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/electrical-power\/power-academy\/contact\/\" title=\"Contactez-nous\" class=\"btn btn-primary\" >Contactez-nous<\/a>                    <\/p>\n                <\/div>\n                        \n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-cta-bar -->","protected":false},"excerpt":{"rendered":"<p>Les normes seront bient\u00f4t d\u00e9pos\u00e9es et en attente de l\u2019approbation finale de la FERC. La NERC a \u00e9galement vot\u00e9 en faveur de l\u2019am\u00e9lioration de la d\u00e9finition de la conduite pour inclure la \u00ab&nbsp;capacit\u00e9 de r\u00e9sister aux perturbations de tension ou de fr\u00e9quence \u00e0 l\u2019int\u00e9rieur des limites d\u00e9finies et de continuer \u00e0 fonctionner comme sp\u00e9cifi\u00e9&nbsp;\u00bb. <\/p>\n","protected":false},"featured_media":20284,"template":"","tags":[884],"news-and-insights-category":[826],"services-category":[],"custom_category":[],"class_list":["post-22060","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-energies-renouvelables","news-and-insights-category-mises-a-jour-reglementaires"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>La NERC approuve les normes li\u00e9es \u00e0 l\u2019IBR ayant une incidence sur la production d\u2019\u00e9nergie renouvelable - TRC Companies<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"La NERC approuve les normes li\u00e9es \u00e0 l\u2019IBR ayant une incidence sur la production d\u2019\u00e9nergie renouvelable - TRC Companies\" \/>\n<meta property=\"og:description\" content=\"Les normes seront bient\u00f4t d\u00e9pos\u00e9es et en attente de l\u2019approbation finale de la FERC. La NERC a \u00e9galement vot\u00e9 en faveur de l\u2019am\u00e9lioration de la d\u00e9finition de la conduite pour inclure la \u00ab&nbsp;capacit\u00e9 de r\u00e9sister aux perturbations de tension ou de fr\u00e9quence \u00e0 l\u2019int\u00e9rieur des limites d\u00e9finies et de continuer \u00e0 fonctionner comme sp\u00e9cifi\u00e9&nbsp;\u00bb.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-27T14:17:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1300\" \/>\n\t<meta property=\"og:image:height\" content=\"597\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/\",\"name\":\"La NERC approuve les normes li\u00e9es \u00e0 l\u2019IBR ayant une incidence sur la production d\u2019\u00e9nergie renouvelable - TRC Companies\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg\",\"datePublished\":\"2024-10-31T17:50:12+00:00\",\"dateModified\":\"2024-11-27T14:17:49+00:00\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg\",\"width\":1300,\"height\":597},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"La NERC approuve les normes li\u00e9es \u00e0 l\u2019IBR ayant une incidence sur la production d\u2019\u00e9nergie renouvelable - TRC Companies","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/","og_locale":"fr_CA","og_type":"article","og_title":"La NERC approuve les normes li\u00e9es \u00e0 l\u2019IBR ayant une incidence sur la production d\u2019\u00e9nergie renouvelable - TRC Companies","og_description":"Les normes seront bient\u00f4t d\u00e9pos\u00e9es et en attente de l\u2019approbation finale de la FERC. La NERC a \u00e9galement vot\u00e9 en faveur de l\u2019am\u00e9lioration de la d\u00e9finition de la conduite pour inclure la \u00ab&nbsp;capacit\u00e9 de r\u00e9sister aux perturbations de tension ou de fr\u00e9quence \u00e0 l\u2019int\u00e9rieur des limites d\u00e9finies et de continuer \u00e0 fonctionner comme sp\u00e9cifi\u00e9&nbsp;\u00bb.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/","og_site_name":"TRC Companies","article_modified_time":"2024-11-27T14:17:49+00:00","og_image":[{"width":1300,"height":597,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/","name":"La NERC approuve les normes li\u00e9es \u00e0 l\u2019IBR ayant une incidence sur la production d\u2019\u00e9nergie renouvelable - TRC Companies","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg","datePublished":"2024-10-31T17:50:12+00:00","dateModified":"2024-11-27T14:17:49+00:00","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-approuve-les-normes-liees-a-libr-ayant-une-incidence-sur-la-production-denergie-renouvelable\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Young-Maintenance-Engineer-Team-at-Wind-Turbine-Farm.jpg","width":1300,"height":597},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/22060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/22060\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/20284"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=22060"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=22060"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=22060"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=22060"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=22060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}