{"id":1709,"date":"2020-07-28T13:57:39","date_gmt":"2020-07-28T13:57:39","guid":{"rendered":"https:\/\/www.trccompanies.com\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/"},"modified":"2025-02-17T13:30:30","modified_gmt":"2025-02-17T13:30:30","slug":"nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/","title":{"rendered":"NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <p>On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions. The standard has a two-year implementation plan. Immediately prior to its effective date, PRC-024-02 will be retired.<\/p>\n<p>PRC-024-3 clarifies the voltage and frequency protection setting requirements to assure that generating resources, including inverter-based resources, continue to support power system stability during system disturbances. The standard identifies the types of protection subject to the requirements and incorporates language used by inverter manufacturers and solar project developers, while ensuring correct protection settings for applicable generating resources.<\/p>\n<p>PRC-024-2 standard was revised to address recommendations made by the NERC Inverter-Based Resource Performance Task Force (IRPTF) which were developed in response to NERC and WECC analysis of the Blue Cut Fire and Canyon 2Fire disturbances in southern California. Event analysis for both disturbances revealed that misinterpretation of the requirements of PRC-024-2 led to the intentional and unnecessary tripping of solar PV resources during these events. In addition to identifying the need to provide clarity around the intent and requirements in PRC-024-2, the IRPTF also found errors within the standard.<\/p>\n<p>The expectations of generators regarding adherence to the no-trip boundaries for both system frequency and system voltage excursions for each interconnection in North America are the key technical components of the standard.<\/p>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/\" target=\"_self\">Electrical and Power<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/markets\/power-and-utilities\/\" target=\"_self\">Power and Utilities<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/markets\/power-and-utilities\/power-generation\/\" target=\"_self\">Power Generation<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/electrical-power\/power-system-studies\/\" target=\"_self\">Power System Studies<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                                                            <div class=\"wysiwyg__links__bottom\">\n                                    <a href=\"https:\/\/www.trccompanies.com\/services\" target=\"_self\">View All Services<\/a>\n                                <\/div>\n                                                                                                <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-promotion-blocks -->\n\n<section class=\"cta-right-image-text\">\n    <div class=\"cta-right-image-text__wrap\">\n        <div class=\"cta-right-image-text__text\">\n            <div class=\"cta-right-image-text__text__wrap js-animated-content animated-content\">\n                <h2>Next Steps for Successful Compliance<\/h2>\n<p>NERC standards are the\u00a0<em>minimum<\/em>\u00a0obligations that must be met for utility for reliable operation of the Bulk Electric System. Now is the time to begin planning for the changes needed to your company\u2019s processes and procedures to implement the revised standard within your compliance program.<\/p>\n<p>Utilities should evaluate their programs and processes in order to stay ahead of regulatory changes. Now is the time to consider what support you might need for further NERC Compliance program development, independent compliance assessment, pre-audit reviews and compliance documentation.<\/p>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.trccompanies.com\/contact-us\/\">Contact Us<\/a><\/p>\n            <\/div>\n        <\/div>\n        <div class=\"cta-right-image-text__image\">\n            <img decoding=\"async\" width=\"2061\" height=\"1455\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1.jpg\" class=\"object-fit\" alt=\"GettyImages-473112486-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1.jpg 2061w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1-300x212.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1-1024x723.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1-768x542.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1-1536x1084.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1-2048x1446.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-473112486-1-850x600.jpg 850w\" sizes=\"(max-width: 2061px) 100vw, 2061px\" \/>            <span class=\"top\"><\/span>\n            <span class=\"bottom\"><\/span>\n            <span class=\"left\"><\/span>\n            <span class=\"right\"><\/span>\n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-promotion-blocks -->\n\n<!-- Start Block: acf\/innerpage-related-materials -->\n<section class=\"material-cards bg-purple-gradient\">\n    <div class=\"container-fluid js-animated-content animated-content\">\n        <div class=\"material-cards__headlines  js-animated-content animated-content\">\n            <div class=\"material-card__content js-animated-content animated-content\">\n                <h3>Resources<\/h3>\n            <\/div>\n            <div class=\"material-card__link\">\n                            <\/div>\n        <\/div>\n        <div class=\"row js-related-material-slider js-related-marterial-container \" data-item=\"3\">\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                PRC-024-3 Standard                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 juillet 17, 2020<\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/PRC-024-3.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                FERC PRC-024-3 Approval Letter                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 juillet 9, 2020<\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Order-Approving-of-Reliability-Standard-PRC-024-3.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                NERC Petition to FERC for Approval of PRC-024-3                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 mars 20, 2020<\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Final-Petition_for_Approval_PRC-024-3.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                PRC-024-3 Implementation Plan                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 D\u00e9cembre 4, 2019<\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/2018-04_PRC-024-3_Implementation_Plan_12042019.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                NERC PRC-024 Gaps Whitepaper                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 D\u00e9cembre 20, 2018<\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-IRPTF-PRC-024-2-Gaps-Whitepaper.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                TRC Regulatory Update on PRC Standard Changes 9-24-2019                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/insights\/nerc-pursues-changes-to-protection-relay-and-control-prc-standards\/\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                TRC Protection and Control Services                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/electrical-power\/protection-and-controls\/\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                TRC Compliance Support                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                    <\/div>\n\n        <div class=\"material-cards__bottom text-right hidden-lg\">\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-related-materials -->\n\n<!-- Start Block: acf\/innerpage-promotion-blocks -->\n\n<section class=\"image-cta\">\n    <img decoding=\"async\" width=\"2340\" height=\"1281\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630.jpg\" class=\"image-cta-bg object-fit\" alt=\"GettyImages-993560630\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630.jpg 2340w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630-300x164.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630-1024x561.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630-768x420.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630-1536x841.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630-2048x1121.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-993560630-1096x600.jpg 1096w\" sizes=\"(max-width: 2340px) 100vw, 2340px\" \/>    <div class=\"image-cta-back-curve\">\n        <span class=\"top\"><\/span>\n        <span class=\"bottom\"><\/span>\n        <span class=\"left\"><\/span>\n        <span class=\"right\"><\/span>\n    <\/div>\n    <div class=\"image-cta-front-curve\">\n        <span class=\"top\"><\/span>\n        <span class=\"bottom\"><\/span>\n        <span class=\"left\"><\/span>\n        <span class=\"right\"><\/span>\n    <\/div>\n    <div class=\"image-cta-overlay\">\n        <div class=\"image-cta-content js-animated-content animated-content\">\n            <h2>\u00a0About the TRC Power Delivery Practice<\/h2>\n<p>TRC\u2019s approach to power delivery design balances solutions that incorporate appropriate standards, regulatory requirements, best practices and operational goals and budgets. Our work for public and private sector utility clients is a testament to our understanding of power delivery operations. Our successful application of technological solutions in a constantly evolving business and regulatory landscape will provide you with confidence regarding your compliance programs.<\/p>\n<p>Our power system experts help you stay ahead of changing regulatory expectations because they are continually engaged with the regulatory process and know how to plan, design and install programs that address your financial, technical and scheduling goals including compliance with changing NERC standards and guidelines, as well as industry best practices.<\/p>\n<p>This regulatory update is a service to TRC\u2019s utility clients, helping keep you informed of issues that impact your company\u2019s electric system reliability risks along with related topics regarding future regulatory developments to help you achieve your company\u2019s business goals.<\/p>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.trccompanies.com\/contact-us\/\">Contact Us<\/a><\/p>\n<p>&nbsp;<\/p>\n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-promotion-blocks -->","protected":false},"excerpt":{"rendered":"<p>On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.<\/p>\n","protected":false},"featured_media":5928,"template":"","tags":[189,523,251,280,282,402,291],"news-and-insights-category":[360],"services-category":[1005,1002,994],"custom_category":[1010],"class_list":["post-1709","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-electric-utilities","tag-electrical-and-power-engineering","tag-nerc","tag-power-and-utilities","tag-power-generation","tag-power-systems-studies","tag-protection-and-controls","news-and-insights-category-regulatory-updates","services-category-electrical-and-power","services-category-environment-health-safety-and-sustainability","services-category-regulatory-compliance","custom_category-power-utilities-markets"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources - TRC Companies<\/title>\n<meta name=\"description\" content=\"On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources - TRC Companies\" \/>\n<meta property=\"og:description\" content=\"On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-17T13:30:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1792\" \/>\n\t<meta property=\"og:image:height\" content=\"1195\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/\",\"name\":\"NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources - TRC Companies\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp\",\"datePublished\":\"2020-07-28T13:57:39+00:00\",\"dateModified\":\"2025-02-17T13:30:30+00:00\",\"description\":\"On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp\",\"width\":1792,\"height\":1195},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources - TRC Companies","description":"On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/","og_locale":"fr_CA","og_type":"article","og_title":"NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources - TRC Companies","og_description":"On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/","og_site_name":"TRC Companies","article_modified_time":"2025-02-17T13:30:30+00:00","og_image":[{"width":1792,"height":1195,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/","name":"NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources - TRC Companies","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp","datePublished":"2020-07-28T13:57:39+00:00","dateModified":"2025-02-17T13:30:30+00:00","description":"On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp","width":1792,"height":1195},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1709\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/5928"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=1709"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=1709"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=1709"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=1709"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=1709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}