{"id":1242,"date":"2022-08-22T13:27:13","date_gmt":"2022-08-22T13:27:13","guid":{"rendered":"https:\/\/www.trccompanies.com\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/"},"modified":"2024-12-12T13:10:44","modified_gmt":"2024-12-12T13:10:44","slug":"nerc-proposes-implementation-guidance-for-prc-019-2","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/","title":{"rendered":"NERC Proposes Implementation Guidance for PRC-019-2"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <p>NERC has proposed implementation guidance for PRC-019-2, the standard that verifies coordination of generating unit facility or synchronous condenser voltage regulating controls, limit functions, equipment capabilities and protection system settings.<\/p>\n<p>The proposed guidance provides valuable information regarding approaches to assuring coordination between a generator voltage control system and its associated protection functions. The guidance aims to provide utilities with reasonable assumptions that may be used in the calculations to meet the intent of this standard.<\/p>\n<p>The implementation guidance provides details and examples of methods along with the type of coordination affirming plots that are expected to be provided as audit evidence. The addition of dispersed generating resources to the guidance is important to note.<\/p>\n<ul>\n<li>Traditional Synchronous Generation<\/li>\n<li>Synchronous Condensers<\/li>\n<li>Type 1 &amp; Type 2 Wind Turbines<\/li>\n<li>Inverter Based Resources:\n<ul>\n<li>Type 3 Doubly Fed Induction Generator (DFIG) or Doubly Fed Asynchronous Generator (DFAG) Wind Turbine<\/li>\n<li>Type 4 Full Conversion Wind Turbine<\/li>\n<li>Photovoltaic (Solar) System<\/li>\n<li>Battery Energy Storage Systems (BESS) Synchronous Generators<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>The NERC System Protection and Control Working Group (SPCWG) has made available a supporting technical reference document to aid the industry. The document provides details regarding the variables, system conditions and analysis associated with generation control and protection coordination.<\/p>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/regulatory-environmental-consulting\/regulatory-compliance\/nerc\/\" target=\"_self\">NERC<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/electrical-power\/power-system-studies\/\" target=\"_self\">Power System Studies<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/electrical-power\/protection-and-controls\/\" target=\"_self\">Protection and Controls<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                                                            <div class=\"wysiwyg__links__bottom\">\n                                    <a href=\"https:\/\/www.trccompanies.com\/services\" target=\"_self\">View All Services<\/a>\n                                <\/div>\n                                                                                                <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-purple\">\n    <div class=\"container-fluid\">\n                    <div class=\"wysiwyg__wrapper\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h2>Next Steps<\/h2>\n<p>Utility NERC compliance departments and their protection analysis groups should carefully review the most recent NERC implementation guidance for PRC-019-2 as they prepare and revise internal controls and develop evidence for proving their company\u2019s compliance in future NERC compliance audits.<\/p>\n<p>With expertise in all areas of power system planning and power delivery, along with <a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/electrical-power\/protection-and-controls\/\">protection and control system engineering,<\/a> TRC can provide independent technical advice and project management services regarding PRC-019-2 compliance to review your company\u2019s affected compliance related documents. TRC can make recommendations for your company\u2019s compliance process changes and assist in preparation or perform the studies and protection analysis required to verify compliance.<\/p>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.trccompanies.com\/contact-us\/\">Contact Us<\/a><\/p>\n                <\/div>\n                                <\/div>\n\n                    <\/div>\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-related-materials -->\n<section class=\"material-cards bg-purple-gradient\">\n    <div class=\"container-fluid js-animated-content animated-content\">\n        <div class=\"material-cards__headlines has-limited-item js-animated-content animated-content\">\n            <div class=\"material-card__content js-animated-content animated-content\">\n                <h2>Resources<\/h2>\n            <\/div>\n            <div class=\"material-card__link\">\n                            <\/div>\n        <\/div>\n        <div class=\"row  js-related-marterial-container \" data-item=\"3\">\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                PRC-019-2 Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection Standard                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/PRC-019-2.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                        <div class=\"col-xxs-12 col-lg-4 material-card-item\">\n                <div class=\"material-card\">\n                                            <div class=\"material-card__details \">\n                            <h5 class=\"material-card__title\">\n                                <img decoding=\"async\" width=\"30\" height=\"30\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/picture_as_pdf_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"picture_as_pdf_24dp-black\" \/>                                NERC SPCWG PRC-019 Technical Reference Document \u2013 September 2021                            <\/h5>\n                            <p class=\"material-card__description\">Publi\u00e9 <\/p>\n                        <\/div>\n                        <div class=\"material-card__bttn\">\n                                                        <a href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/PRC-019-2-Technical-Reference-Document-compressed.pdf\" target=\"_blank\"><span>t\u00e9l\u00e9charger le fichier<\/span><img decoding=\"async\" width=\"28\" height=\"28\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/sim_card_download_24dp-black.svg\" class=\"attachment-full size-full\" alt=\"sim_card_download_24dp-black\" \/><\/a>\n                        <\/div>\n                                    <\/div>\n            <\/div>\n                    <\/div>\n\n        <div class=\"material-cards__bottom text-right hidden-lg\">\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-related-materials -->\n\n<!-- Start Block: acf\/innerpage-promotion-blocks -->\n\n<section class=\"cta-right-image-text\">\n    <div class=\"cta-right-image-text__wrap\">\n        <div class=\"cta-right-image-text__text\">\n            <div class=\"cta-right-image-text__text__wrap js-animated-content animated-content\">\n                <h2>Your Trusted Regulatory Advisor<\/h2>\n<p>TRC closely follows the national and state regulatory trends in all regions of North America. Our approach to power system engineering, planning, design, construction and commissioning testing balances solutions that incorporate appropriate industry trends, mandatory standard requirements, regulatory guidance, compliance obligations, best practices, operational goals and budgets. With expertise in both power system planning and operations, TRC supports public utilities and private energy providers in their effort to stay ahead of the curve and to meet regulatory requirements as they evolve.<\/p>\n<p><em>This regulatory update is provided as a service to TRC\u2019s utility clients, helping to keep you informed of forward-looking issues that will impact your company\u2019s electric system reliability risks along with related topics regarding regulatory developments to help you achieve your company\u2019s business goals.<\/em><\/p>\n            <\/div>\n        <\/div>\n        <div class=\"cta-right-image-text__image\">\n            <img decoding=\"async\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-scaled.jpg\" class=\"object-fit\" alt=\"GettyImages-1344124162-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-scaled.jpg 2560w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-2048x1366.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-900x600.jpg 900w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/>            <span class=\"top\"><\/span>\n            <span class=\"bottom\"><\/span>\n            <span class=\"left\"><\/span>\n            <span class=\"right\"><\/span>\n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-promotion-blocks -->\n\n<!-- Start Block: acf\/innerpage-cta-bar -->\n<section class=\"global-cta innerpage-cta default\">\n    <div class=\"container-fluid\">\n        <div class=\"global-cta-wrapper  \">\n                                            <h2>Embrassez le changement<\/h2>\n                                <div class=\"global-cta-image\">\n                    <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" width=\"316.566\" height=\"369\" viewBox=\"0 0 316.566 369\">\n                        <defs>\n                            <pattern id=\"pattern\" width=\"1\" height=\"1\" viewBox=\"117.006 0 316.566 369\">\n                                <image preserveAspectRatio=\"xMidYMid slice\" width=\"655.35\" height=\"369\" href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg\"><\/image>\n                            <\/pattern>\n                        <\/defs>\n                        <path id=\"Union_8\" data-name=\"Union 8\" d=\"M72.087,369,206.869,190.294h109.7L182.891,369ZM0,195.818H68.4l28.66,44.507L68.4,286.43Zm0-10.747L68.4,94.466l28.66,46.1L68.4,185.071Zm205.769-6.365L72.087,0h109.7L316.566,178.706Z\" fill=\"url(#pattern)\"\/>\n                    <\/svg>\n                <\/div>\n                <div class=\"global-cta-content\">\n                    <p>Collaborez avec les praticiens test\u00e9s de TRC<\/p>\n                    <p>\n                        <a href=\"https:\/\/www.trccompanies.com\/contact-us\/\" title=\"Contact Us\" class=\"btn btn-primary\" >Contact Us<\/a>                    <\/p>\n                <\/div>\n                        \n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-cta-bar -->\n\n<!-- Start Block: acf\/innerpage-news-and-insights -->\n<section class=\"image-cards image-cards--news-and-insights section-margins image-cards--with-slider image-cards--innerpage\">\n    <div class=\"container-fluid\">\n        <div class=\"image-cards__wrap\">\n            <div class=\"image-cards__left\">\n                <div>\n                    <h2>Partager nos perspectives<\/h2>\n<p>Nos praticiens partagent leurs id\u00e9es et leurs points de vue sur les tendances et les d\u00e9fis qui fa\u00e7onnent le march\u00e9.<\/p>\n                <\/div>\n                                <div class=\"image-cards__btn\">\n                    <a href=\"https:\/\/www.trccompanies.com\/insights\/\" title=\"View More\" class=\"btn btn-tertiary\" >View More<\/a>                <\/div>\n                            <\/div>\n                            <div class=\"image-cards__right\">\n                    <div class=\"js-image-cards-slider fx-slider\">\n                                                        <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Aerial-view-of-the-solar-panel-in-solar-farm-1367034894\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 10, 2026<\/h4>\n                                                <p class=\"image-card__description\">On February 19, the Federal Energy Regulatory Commission (FERC) approved a set of five new grid reliability standards developed by the North American Electric Reliability Corporation (NERC). These standards target a central challenge: as solar, wind, batteries and other modern energy resources expand rapidly, the data and models used to plan and operate the grid have not kept pace.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Electricity-Meter-System\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/03\/Electricity-Meter-System-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Sudden Large Load Changes\u00a0at Crypto-Mining Facilities<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 19, 2026<\/h4>\n                                                <p class=\"image-card__description\">NERC&rsquo;s 2026 reports reveal how crypto-mining facilities cause sudden grid load loss during voltage dips and what utilities should do.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/sudden-large-load-changes-at-crypto-mining-facilities\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Utility Power Line Workers Examining Electrical Pylons\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-1536x1025.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-2048x1366.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247820954-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Seven Most Violated NERC Standards and How to Maintain Compliance<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 14, 2026<\/h4>\n                                                <p class=\"image-card__description\">\n\n\n\n<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/seven-most-violated-nerc-standards-and-how-to-maintain-compliance\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"377\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-700x377.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1399998127-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-700x377.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-300x162.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-1024x551.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-768x414.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-1536x827.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-2048x1103.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-1114x600.jpg 1114w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-1399998127-1-929x500.jpg 929w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/white-papers\/\" class=\"image-card__category\">White Papers \/ Reports<\/a>                                                <h3>A Practical\u00a0NERC CIP-015 Compliance\u00a0Guide for Utilities Strengthening Cyber Resilience<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 5, 2026<\/h4>\n                                                <p class=\"image-card__description\">FERC\u2019s approval of NERC\u2019s new CIP-015 standard marks a significant evolution in cybersecurity expectations, shifting from perimeter-based defenses to monitoring within trusted zones to detect adversarial activity. This white paper helps organizations understand the requirements and prepare for compliance. Download the full white paper to get started. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/a-practical-nerc-cip-015-compliance-guide-for-utilities-strengthening-cyber-resilience\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-2247821140\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-1536x1025.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-2048x1366.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2247821140-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>NERC\u00a0Identifies\u00a02026 Audit Focus\u00a0Areas<\/h3>\n                                                <h4 class=\"hidden-md-down\">D\u00e9cembre 15, 2025<\/h4>\n                                                <p class=\"image-card__description\">Explore NERC\u2019s 2026 audit focus areas and the compliance risks that will shape monitoring and enforcement activities.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-identifies-2026-audit-focus-areas\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-2202100777\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/12\/GettyImages-2202100777-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/news\/\" class=\"image-card__category\">News<\/a>                                                <h3>WSP to acquire TRC<\/h3>\n                                                <h4 class=\"hidden-md-down\">D\u00e9cembre 15, 2025<\/h4>\n                                                <p class=\"image-card__description\">Supercharges its leading position in the Power &#038; Energy sector.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/wsp-to-acquire-trc-supercharging-its-leading-position-in-the-power-energy-sector\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1203228927-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/GettyImages-1203228927-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Prepare for Extreme Cold Weather with Insights on Achieving EOP-012 Compliance<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 24, 2025<\/h4>\n                                                <p class=\"image-card__description\">Extreme cold weather can severely impact power generation as we\u2019ve seen in recent years. Get tips and best practices for addressing your reliability when faced with extreme cold weather. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/prepare-for-extreme-cold-weather-insights-on-achieving-eop-012-compliance\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Solar-Panel-Transmission-Lines-Substations-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/09\/Solar-Panel-Transmission-Lines-Substations-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Announces Technical Conference to Address IBR Ride-Through Exemptions Under PRC-029-1<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 30, 2025<\/h4>\n                                                <p class=\"image-card__description\">NERC will host a Virtual Technical Conference to address open issues stemming from FERC Order No. 909, which approved the new Reliability Standard PRC-029-1 on ride-through requirements for Inverter-Based Resources (IBRs).<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-announces-technical-conference-to-address-ibr-ride-through-exemptions-under-prc-029-1\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-700x466.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1367402383-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-700x466.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-1536x1023.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-2048x1364.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-901x600.jpg 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/08\/GettyImages-1367402383-751x500.jpg 751w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC\u2019s Inverter Based Resource (IBR) Registration Program Targets Reliability Gaps<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 4, 2025<\/h4>\n                                                <p class=\"image-card__description\">This regulatory update addresses the push for IBR registrations as a NERC addresses the risk to reliability, and what utilities with IBRs can do to prepare.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nercs-inverter-based-resource-ibr-registration-program-targets-reliability-gaps\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"308\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image-700x308.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Hero-image\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image-700x308.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image-300x132.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image-1024x450.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image-768x338.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image-1365x600.webp 1365w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image-1000x439.webp 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/07\/NERC-Hero-image.webp 1536w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/videos\/\" class=\"image-card__category\">Videos<\/a>                                                <h3>NERC Compliance Conversations<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 10, 2025<\/h4>\n                                                <p class=\"image-card__description\">Welcome to TRC\u2019s NERC Compliance Conversations. In this series, we discuss the evolving NERC standards and challenges utilities face.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-compliance-conversations\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/06\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>NERC Compliance Conversation: Smarter Vegetation Management Under FAC-003-5<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 19, 2025<\/h4>\n                                                <p class=\"image-card__description\">Discover why now is the ideal time for utilities to deploy AMI 2.0, unlocking real-time data, operational efficiency and grid modernization benefits.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-compliance-conversation-smarter-vegetation-management-under-fac-003-5\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"384\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity-700x384.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"cybersecurity\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity-700x384.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity-300x164.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity-1024x561.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity-768x421.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity-1095x600.jpg 1095w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity-913x500.jpg 913w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/TRC-covid-cybersecurity.jpg 1168w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Enhance Security Planning and Reporting with Key Takeaways from NERC\u2019s 2024 Cyber Report\u00a0<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 30, 2025<\/h4>\n                                                <p class=\"image-card__description\">NERC has issued its 2024 Cyber Security Report, reviewing reported incidents related to Reliability Standard CIP-008-6. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/enhance-security-planning-and-reporting-with-key-takeaways-from-nercs-2024-cyber-report\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"369\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-700x369.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"About TRC\u2019s NERC System Studies and NERC Compliance Practice:\u00a0 TRC\u2019s approach to power system development and operation balances solutions that incorporate appropriate standards, regulatory requirements, best practices, operational goals and budgets. Our work for public and private sector utility clients is a testament to our understanding of NERC compliance related aspects of your business. Our successful application of technology solutions in a constantly evolving business and regulatory landscape will provide you with confidence regarding your power system compliance programs. Our power system experts help you stay ahead of changing regulatory expectations because they stay engaged with the regulatory process and know how to plan, design and install programs that address your financial, technical and scheduling goals including compliance with changing NERC standards and guidelines as well as industry \u201cbest practices\u201d and the latest technology developments.\u00a0 This regulatory update is a service to TRC\u2019s utility clients, helping keep you informed of issues that impact your company\u2019s electric reliability risks along with related topics regarding future regulatory developments to help you achieve your company\u2019s business goals including compliance with NERC standards.\u00a0\u00a0\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-700x369.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-300x158.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-1024x540.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-768x405.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-1536x810.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-2048x1080.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-1138x600.jpg 1138w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/solar-panel-install-948x500.jpg 948w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Challenges Surround Approval of PRC-029-1<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 30, 2025<\/h4>\n                                                <p class=\"image-card__description\">Approved by the Board of Trustees in 2024, NERC\u2019s PRC-029-1 standard sets inverter-based resources (IBR) performance requirements ensuring they can \u201cwithstand voltage or frequency disturbances inside defined limits\u201d and can \u201ccontinue operating as specified.\u201d<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/challenges-surround-approval-of-prc-029-1\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"408\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-700x408.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Data Center Business\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-700x408.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-300x175.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-1024x596.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-768x447.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-1536x894.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-2048x1193.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-1030x600.jpg 1030w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/04\/GettyImages-2166415099-859x500.jpg 859w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Examines Co-Located Load and Generation Rule\u00a0<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 21, 2025<\/h4>\n                                                <p class=\"image-card__description\">Since FERC hosted its technical conference in late 2024, many industry stakeholders have submitted their comments addressing how to study and potentially regulate new co-located load and generation. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-examines-co-located-load-and-generation-rule\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"an abstract representation of solving problems using artificial intelligence to increase reliability and reduce losses and accidents during the transmission of electrical energy\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/02\/solving-problems-using-artificial-intelligence-1151571867-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Cybersecurity Threats Lead NERC to Modify CIP Standards<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 11, 2025<\/h4>\n                                                <p class=\"image-card__description\">Cybersecurity threats to the Bulk Electric System (BES) are escalating, with attackers continuously evolving their tactics to target critical infrastructure.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/cyber-security-threats-lead-nerc-to-modify-cip-standards\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Data-Center-and-Cloud\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/03\/Data-Center-and-Cloud-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Large Data Center Load Loss Calls for System Impact Studies<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 3, 2025<\/h4>\n                                                <p class=\"image-card__description\">On January 8, 2025, NERC released its review of an incident where the sudden loss of approximately 1,500 MW of data center load in Virginia exposed major reliability vulnerabilities in the Bulk Electric System (BES). This unanticipated event triggered voltage spikes and frequency imbalances, highlighting the need for system planners and operators to anticipate and mitigate these risks nationwide<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/large-data-center-load-loss-raises-for-system-impact-studies\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"High-voltage-power-tower-618838262-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/01\/High-voltage-power-tower-618838262-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Approves New Extreme Weather Planning Standard<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 22, 2025<\/h4>\n                                                <p class=\"image-card__description\">On December 10, 2024, NERC\u2019s Board of Trustees approved standard TPL-008-1 Transmission System Planning Performance Requirements for Extreme Temperature Events. The petition to approve the TPL-008-1 standard was filed with the Federal Energy Regulatory Commission (FERC) on December 17, 2024 and will initiate the implementation plan upon final approval.\u00a0<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-approves-new-extreme-weather-planning-standard\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/gettyimages-1777966022-2048x2048-1-min.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"gettyimages-1777966022-2048x2048-1-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/gettyimages-1777966022-2048x2048-1-min.png 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/gettyimages-1777966022-2048x2048-1-min-300x169.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/gettyimages-1777966022-2048x2048-1-min-1024x576.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/gettyimages-1777966022-2048x2048-1-min-768x432.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/gettyimages-1777966022-2048x2048-1-min-1536x864.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/gettyimages-1777966022-2048x2048-1-min-1067x600.png 1067w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La FERC publie des directives pour am\u00e9liorer la s\u00e9curit\u00e9 du r\u00e9seau \u00e9lectrique et la conformit\u00e9 au CIP<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 30, 2024<\/h4>\n                                                <p class=\"image-card__description\">Cette mise \u00e0 jour fournit des d\u00e9tails du rapport du personnel de la FERC 2024 sur les audits CIP, afin que les services publics puissent am\u00e9liorer la conformit\u00e9 et r\u00e9duire les risques pour la s\u00e9curit\u00e9.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-ferc-publie-des-directives-pour-ameliorer-la-securite-du-reseau-electrique-et-la-conformite-au-cip\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"465\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Powerlines-and-solar_326915924-min.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Powerlines-and-solar_326915924-min\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Powerlines-and-solar_326915924-min.png 1200w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Powerlines-and-solar_326915924-min-300x199.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Powerlines-and-solar_326915924-min-1024x680.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Powerlines-and-solar_326915924-min-768x510.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Powerlines-and-solar_326915924-min-903x600.png 903w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC publie son rapport sur l\u2019\u00e9tat de fiabilit\u00e9 2024<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 19, 2024<\/h4>\n                                                <p class=\"image-card__description\">La North American Electric Reliability Corporation (NERC) a r\u00e9cemment publi\u00e9 son rapport sur l\u2019\u00e9tat de fiabilit\u00e9 2024, examinant le rendement du r\u00e9seau \u00e9lectrique au cours de l\u2019ann\u00e9e civile 2023.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-publie-son-rapport-sur-letat-de-fiabilite-2024\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Electricity-workers-and-pylon-silhouette-1148713243\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243.jpg 2121w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/Electricity-workers-and-pylon-silhouette-1148713243-900x600.jpg 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>Conformit\u00e9 des \u00e9valuations des installations gr\u00e2ce \u00e0 une approche de la communaut\u00e9 d\u2019entreprise<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 30, 2024<\/h4>\n                                                <p class=\"image-card__description\">Les cotes d\u2019installation jouent un r\u00f4le essentiel dans la planification et l\u2019exploitation fiables du syst\u00e8me \u00e9lectrique en vrac (BES) et pourtant, le maintien de la conformit\u00e9 aux normes NERC pertinentes reste un d\u00e9fi de l\u2019industrie.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/conformite-des-evaluations-des-installations-grace-a-une-approche-de-la-communaute-dentreprise\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/image-41-1.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"image-41-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/image-41-1.png 1199w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/image-41-1-300x200.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/image-41-1-1024x683.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/image-41-1-768x512.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/image-41-1-899x600.png 899w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>Les perturbations g\u00e9omagn\u00e9tiques extr\u00eames ont une incidence sur la planification de la NERC<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 8, 2024<\/h4>\n                                                <p class=\"image-card__description\">Renseignez-vous sur les r\u00e9centes perturbations g\u00e9omagn\u00e9tiques qui ont amen\u00e9 les intervenants du r\u00e9seau \u00e9lectrique en vrac \u00e0 r\u00e9agir rapidement pour prot\u00e9ger la fiabilit\u00e9 du r\u00e9seau. D\u00e9couvrez les impacts et ce que la NERC et l\u2019industrie font \u00e0 ce sujet. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/les-perturbations-geomagnetiques-extremes-ont-une-incidence-sur-la-planification-de-la-nerc\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Senior Engineer looking and checking electric power station.\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371.jpg 2121w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2165326371-900x600.jpg 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>Preuves de conformit\u00e9 coh\u00e9rentes de la NERC pour les r\u00e9sultats de la v\u00e9rification r\u00e9ussie<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 27, 2024<\/h4>\n                                                <p class=\"image-card__description\">Alors que les services publics travaillent souvent dans des silos techniques, les auditeurs NERC sont form\u00e9s pour v\u00e9rifier les preuves de conformit\u00e9 et les donn\u00e9es entre les normes interd\u00e9pendantes.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/preuves-de-conformite-coherentes-de-la-nerc-pour-les-resultats-de-la-verification-reussie\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"646\" height=\"500\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1352600335.jpg_Resize-1-649x502-1.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1352600335.jpg_Resize-1-649x502-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1352600335.jpg_Resize-1-649x502-1.webp 1792w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1352600335.jpg_Resize-1-649x502-1-300x232.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1352600335.jpg_Resize-1-649x502-1-1024x792.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1352600335.jpg_Resize-1-649x502-1-768x594.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1352600335.jpg_Resize-1-649x502-1-1536x1188.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1352600335.jpg_Resize-1-649x502-1-776x600.webp 776w\" sizes=\"(max-width: 646px) 100vw, 646px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>Les nouvelles normes de la NERC aident \u00e0 se prot\u00e9ger contre les cyberattaques<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 23, 2024<\/h4>\n                                                <p class=\"image-card__description\">Dans le cadre des efforts continus de la NERC pour renforcer les exigences en mati\u00e8re de protection des infrastructures essentielles (CIP) et permettre la mise en \u0153uvre d\u2019un concept d\u2019am\u00e9lioration de la s\u00e9curit\u00e9 connu sous le nom de virtualisation.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/les-nouvelles-normes-de-la-nerc-aident-a-se-proteger-contre-les-cyberattaques\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1207439061-scaled-1.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1207439061-scaled-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1207439061-scaled-1.webp 1140w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1207439061-scaled-1-300x169.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1207439061-scaled-1-1024x576.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1207439061-scaled-1-768x432.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1207439061-scaled-1-1067x600.webp 1067w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>Succ\u00e8s de la conformit\u00e9 nerc gr\u00e2ce \u00e0 une approche de la communaut\u00e9 d\u2019entreprise<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 6, 2024<\/h4>\n                                                <p class=\"image-card__description\">Alors que les services publics travaillent souvent dans des silos techniques, les auditeurs NERC sont form\u00e9s pour v\u00e9rifier les preuves de conformit\u00e9 et les donn\u00e9es entre les normes interd\u00e9pendantes. Le travail en silo m\u00e8ne souvent \u00e0 des situations par inadvertance o\u00f9 les preuves de conformit\u00e9 d\u2019une norme sont utilis\u00e9es, mais incompatibles avec l\u2019information produite ou utilis\u00e9e par d\u2019autres normes. Pour assurer l\u2019atteinte des objectifs de d\u00e9claration des preuves de conformit\u00e9 dans chaque norme et exigence applicable, il est important de d\u00e9terminer les interrelations et de cr\u00e9er un cadre o\u00f9 les experts en la mati\u00e8re (PME) de toutes les disciplines techniques tiennent compte des exigences en mati\u00e8re de coh\u00e9rence des donn\u00e9es probantes.  \nLes auditeurs de conformit\u00e9 nerc sont \u00e9galement form\u00e9s pour examiner les flux de processus et identifier s\u2019ils sont complets ou incomplets. Les v\u00e9rificateurs d\u00e9terminent la pertinence de l\u2019information en examinant la qualit\u00e9 et l\u2019exhaustivit\u00e9 des preuves de conformit\u00e9. Examiner la pertinence, la validit\u00e9, l\u2019uniformit\u00e9 et la fiabilit\u00e9 des \u00e9l\u00e9ments probants utilis\u00e9s pour atteindre les objectifs de fiabilit\u00e9 de la v\u00e9rification et appuyer leurs constatations et conclusions. Si des \u00e9l\u00e9ments probants contradictoires sont trouv\u00e9s, ils l\u2019identifieront dans les conclusions officielles de leur rapport de v\u00e9rification de l\u2019entit\u00e9 r\u00e9gionale (ER), ce qui pourrait entra\u00eener une violation de la conformit\u00e9 et des amendes connexes.   \nAfin d\u2019am\u00e9liorer la probabilit\u00e9 de r\u00e9sultats favorables de la v\u00e9rification de la conformit\u00e9 de la NERC et d\u2019\u00e9viter la n\u00e9cessit\u00e9 de mettre en \u0153uvre des plans d\u2019att\u00e9nuation, les contributeurs individuels et les PME devraient examiner certaines preuves de conformit\u00e9 r\u00e9ticul\u00e9es pour assurer l\u2019uniformit\u00e9 entre les approches utilis\u00e9es pour consigner les preuves de conformit\u00e9. Cela permettra \u00e0 une entreprise de consacrer plus de temps \u00e0 l\u2019ex\u00e9cution des t\u00e2ches de fiabilit\u00e9 de base et d\u2019am\u00e9liorer les obligations r\u00e9glementaires de l\u2019entreprise. \u00c9vitez d\u2019attendre que les v\u00e9rifications de conformit\u00e9 des ER soient en cours pour identifier les situations de preuves contradictoires.  <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/succes-de-la-conformite-nerc-grace-a-une-approche-de-la-communaute-dentreprise\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp 1792w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-901x600.webp 901w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC propose des modifications aux crit\u00e8res d\u2019inscription des ressources bas\u00e9es sur les onduleurs (IBRs)<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 19, 2024<\/h4>\n                                                <p class=\"image-card__description\">La NERC a soumis \u00e0 l\u2019approbation de la FERC de nouveaux crit\u00e8res de conformit\u00e9 pour l\u2019enregistrement des RCI dans le cadre des efforts continus visant \u00e0 r\u00e9duire les risques de fiabilit\u00e9. Il est essentiel que les d\u00e9veloppeurs d\u2019\u00e9nergie renouvelable, les propri\u00e9taires de production et les propri\u00e9taires de r\u00e9seaux de transport comprennent les implications potentielles pour les \u00e9tudes d\u2019interconnexion et les files d\u2019attente d\u2019interconnexion. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-propose-des-modifications-aux-criteres-dinscription-des-ressources-basees-sur-les-onduleurs-ibrs\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"459\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"elliott\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott.png 1725w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-300x197.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-1024x672.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-768x504.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-1536x1008.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-914x600.png 914w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC propose des clarifications aux normes de temps froid de l\u2019EOP<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 26, 2024<\/h4>\n                                                <p class=\"image-card__description\">La NERC a soumis des propositions de r\u00e9vision \u00e0 la norme EOP-012-2 \u2013 Norme de pr\u00e9paration et d\u2019exploitation par temps extr\u00eamement froid, aux fins d\u2019approbation par la FERC sur une base acc\u00e9l\u00e9r\u00e9e. Les r\u00e9visions propos\u00e9es tiennent compte des recommandations cl\u00e9s restantes du rapport d\u2019enqu\u00eate conjoint de la FERC et de la NERC sur la temp\u00eate hivernale Uri et des directives d\u00e9coulant d\u2019un arr\u00eat\u00e9 de la FERC de 2023 concernant les normes de temps froid soumises pr\u00e9c\u00e9demment.   <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-propose-des-clarifications-aux-normes-de-temps-froid-de-leop\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1.webp 1792w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-901x600.webp 901w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La mise \u00e0 jour du FAC-003-5 apporte des changements radicaux aux classifications de transmission \u00e0 compter du 1er avril<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 19, 2024<\/h4>\n                                                <p class=\"image-card__description\">La mise \u00e0 jour du FAC-003-5 apporte des changements radicaux aux classifications de transmission \u00e0 compter du 1er avril  <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-mise-a-jour-du-fac-003-5-apporte-des-changements-radicaux-aux-classifications-de-transmission-a-compter-du-1er-avril\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Corporate-team-working-colleagues-working-in-office.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Corporate-team-working-colleagues-working-in-office\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Corporate-team-working-colleagues-working-in-office.webp 1792w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Corporate-team-working-colleagues-working-in-office-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Corporate-team-working-colleagues-working-in-office-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Corporate-team-working-colleagues-working-in-office-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Corporate-team-working-colleagues-working-in-office-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Corporate-team-working-colleagues-working-in-office-900x600.webp 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>Pr\u00e9venir les \u00e9checs de conformit\u00e9 nerc avec les examens de l\u2019\u00e9tat de pr\u00e9paration<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 20, 2024<\/h4>\n                                                <p class=\"image-card__description\">Chaque service public enregistr\u00e9 aupr\u00e8s de la NERC doit s\u2019efforcer de se conformer en permanence \u00e0 son portefeuille de normes de fiabilit\u00e9 NERC applicables<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/prevenir-les-echecs-de-conformite-nerc-avec-les-examens-de-letat-de-preparation\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"392\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/01\/high-voltage-substation-under-the-sunset.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"high-voltage-substation-under-the-sunset\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/01\/high-voltage-substation-under-the-sunset.png 1773w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/01\/high-voltage-substation-under-the-sunset-300x168.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/01\/high-voltage-substation-under-the-sunset-1024x574.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/01\/high-voltage-substation-under-the-sunset-768x431.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/01\/high-voltage-substation-under-the-sunset-1536x861.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/01\/high-voltage-substation-under-the-sunset-1070x600.png 1070w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC publie le plan d\u2019\u00e9laboration des normes 2024-2026<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 26, 2024<\/h4>\n                                                <p class=\"image-card__description\">La NERC a soumis son plan d\u2019\u00e9laboration de normes de fiabilit\u00e9 2024-2026 \u00e0 la Federal Energy Regulatory Commission (FERC), d\u00e9crivant ses priorit\u00e9s actuelles et ses futurs plans d\u2019\u00e9laboration de normes pour prot\u00e9ger la fiabilit\u00e9 du r\u00e9seau \u00e9lectrique en vrac au cours des trois prochaines ann\u00e9es.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-publie-le-plan-delaboration-des-normes-2024-2026\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"459\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"elliott\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott.png 1725w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-300x197.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-1024x672.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-768x504.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-1536x1008.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/elliott-914x600.png 914w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC et la FERC publient le rapport sur la temp\u00eate hivernale Elliott<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 2, 2024<\/h4>\n                                                <p class=\"image-card__description\">La NERC et la FERC ont publi\u00e9 leur rapport final sur la temp\u00eate hivernale Elliott, qui fournit un renforcement pour les recommandations dans les rapports ant\u00e9rieurs d\u2019\u00e9v\u00e9nements de perturbation li\u00e9s au temps froid. Le rapport fait \u00e9tat de lacunes critiques en mati\u00e8re de rendement en mati\u00e8re de fiabilit\u00e9 et des quasi-accidents li\u00e9s \u00e0 la fiabilit\u00e9. La NERC affirme qu\u2019une crise a \u00e9t\u00e9 \u00ab \u00e9vit\u00e9e de justesse \u00bb. Le rapport d\u00e9crit les mesures que l\u2019industrie doit prendre pour \u00e9viter une r\u00e9p\u00e9tition \u00e0 l\u2019avenir.   <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-et-la-ferc-publient-le-rapport-sur-la-tempete-hivernale-elliott\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"488\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Solar-Panels\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels.jpg 2074w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels-300x209.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels-1024x714.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels-768x535.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels-1536x1071.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels-2048x1428.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Solar-Panels-861x600.jpg 861w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>L\u2019ordonnance 901 de la FERC demande des normes pour combler les lacunes en mati\u00e8re de fiabilit\u00e9 de l\u2019IBR<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 27, 2023<\/h4>\n                                                <p class=\"image-card__description\">Les ressources bas\u00e9es sur les onduleurs jouent un r\u00f4le central lorsqu\u2019il s\u2019agit d\u2019ajouter une nouvelle capacit\u00e9 de production d\u2019\u00e9lectricit\u00e9 dans le syst\u00e8me d\u2019alimentation en vrac.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/lordonnance-901-de-la-ferc-demande-des-normes-pour-combler-les-lacunes-en-matiere-de-fiabilite-de-libr\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2023\/10\/nerc-releases-inverter-based-resources-webinar.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"nerc-releases-inverter-based-resources-webinar\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2023\/10\/nerc-releases-inverter-based-resources-webinar.png 1129w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2023\/10\/nerc-releases-inverter-based-resources-webinar-300x200.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2023\/10\/nerc-releases-inverter-based-resources-webinar-1024x683.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2023\/10\/nerc-releases-inverter-based-resources-webinar-768x512.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2023\/10\/nerc-releases-inverter-based-resources-webinar-900x600.png 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC publie une s\u00e9rie de webinaires sur les ressources bas\u00e9es sur les onduleurs<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 19, 2023<\/h4>\n                                                <p class=\"image-card__description\">Alors que le syst\u00e8me de distribution d\u2019\u00e9lectricit\u00e9 continue d\u2019\u00e9voluer rapidement en raison des initiatives de politique de d\u00e9carbonisation, les ressources bas\u00e9es sur des onduleurs (IBRs) jouent un r\u00f4le de plus en plus important dans les ajouts de production au syst\u00e8me d\u2019alimentation en vrac. La NERC et d\u2019autres organisations techniques ont pris de nombreuses mesures pour appuyer l\u2019int\u00e9gration fiable de ces ressources. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-publie-une-serie-de-webinaires-sur-les-ressources-basees-sur-les-onduleurs\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"488\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-700x488.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"windmills\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-700x488.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-300x209.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-1024x713.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-768x535.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-1536x1070.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-862x600.webp 862w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills-718x500.webp 718w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/243a3305-windmills.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Issues Order 2023 to Resolve Interconnection Process Issues<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 25, 2023<\/h4>\n                                                <p class=\"image-card__description\">The Federal Energy Regulatory Commission has approved Order 2023 to facilitate and improve the speed and reliability of adding new energy resources to the power system<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-issues-order-2023-to-resolve-interconnection-process-issues\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"cfats-program-expires-but-reauthorization-anticipated-this-fall\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cfats-program-expires-but-reauthorization-anticipated-this-fall.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>CFATS Program Expires but Reauthorization Anticipated this Fall<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 6, 2023<\/h4>\n                                                <p class=\"image-card__description\">Regulated organizations should continue to follow DHS cybersecurity requirements.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/cfats-program-expires-but-reauthorization-anticipated-this-fall\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"b78b71a2-ferc\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b78b71a2-ferc.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Hosts Technical Conference on the Effectiveness and Improvements to CIP-014-3<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 30, 2023<\/h4>\n                                                <p class=\"image-card__description\">Expert Discussions and Key Takeaways Focus on Physical Security<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-hosts-technical-conference-on-the-effectiveness-and-improvements-to-cip-014-3\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"418\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines-700x418.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"power-lines\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines-700x418.png 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines-300x179.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines-1024x612.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines-768x459.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines-1004x600.png 1004w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines-837x500.png 837w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/power-lines.png 1314w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Intro to NERC Regulatory Guidance on Inverter-Based Resources<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 29, 2023<\/h4>\n                                                <p class=\"image-card__description\">As renewable energy proliferates across the US power system, the North American Electric Reliability Corporation (NERC) continues to actively address reliability risks resulting from the implementation of inverter-based resources (solar and wind generation technology) connected at both transmission and Distributed Energy Resources (DER) levels.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/intro-to-nerc-regulatory-guidance-on-inverter-based-resources\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"extreme-weather-initiative-changes-transmission-planning-\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Extreme Weather Initiative Will Change the Transmission Planning Process<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 26, 2023<\/h4>\n                                                <p class=\"image-card__description\">FERC issued a Final Rule directing NERC to develop a new or modified reliability standard addressing transmission system planning performance requirements for extreme heat or cold weather events.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-extreme-weather-initiative-changes-transmission-planning-process\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--700x394.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"inverter-bas\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--700x394.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--300x169.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--1024x576.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--768x432.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--1536x864.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--1067x600.webp 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program--889x500.webp 889w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/110782e1-ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program-.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Approves Plan to Register Certain Inverter-Based Resources as part of NERC Mandatory Standards Compliance Program<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 21, 2023<\/h4>\n                                                <p class=\"image-card__description\">FERC issued an order approving NERC\u2019s compliance filings.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-plan-to-register-certain-inverter-based-resources-as-part-of-nerc-mandatory-standards-compliance-program\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3364aa84-nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard.webp 1140w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Files Report on Effectiveness on CIP-014 Physical Security Standard<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 25, 2023<\/h4>\n                                                <p class=\"image-card__description\">On behalf of the North American Electric Reliability Corporation (NERC), its President and CEO Jim Robb, recently presented to the Federal Energy Regulatory Commission (FERC) a summary of NERC\u2019s report on the effectiveness of NERC\u2019s CIP-014 Physical Security Standard. There were almost 1,700 physical security incidents reported to the Electricity-Information Security Analysis Center (E-ISAC) in 2022, an increase of 10.5% from 2021. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-files-report-on-effectiveness-on-cip-014-physical-security-standard\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"41dcd979-gettyimages-1190354242-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Issues Order on Cold Weather Reliability Standards<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 27, 2023<\/h4>\n                                                <p class=\"image-card__description\">FERC has approved two NERC proposed cold weather-related reliability standards.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-issues-order-on-cold-weather-reliability-standards\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"72e2e911-substation-in-the-evening-1163113257\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Orders Internal Network Security Monitoring Rule to be Finalized<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 14, 2023<\/h4>\n                                                <p class=\"image-card__description\">FERC directed NERC to develop Reliability Standards to implement INSM within trusted CIP environments.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-orders-internal-network-security-monitoring-rule-to-be-finalized\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"solar-photovoltaic-panels-and-substations\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Insights from the Odessa II Power System Disturbance<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 22, 2023<\/h4>\n                                                <p class=\"image-card__description\">NERC and TRE release the Odessa II Power System Disturbance Report<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/insights-from-the-odessa-ii-power-system-disturbance\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"solar20panel20transmission20lines20substations\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/e7d62e35-solar20panel20transmission20lines20substations.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>New FERC Orders Will Change Regulatory Process for Inverter Based Resources<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 9, 2023<\/h4>\n                                                <p class=\"image-card__description\">The Federal Energy Regulatory Commission (FERC) recently proposed actions to keep the regulatory process and requirements ahead of reliability risks resulting from the accelerated deployment of Inverter Based Resources (IBR) based solar, wind and battery storage projects.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/new-ferc-orders-will-change-regulatory-process-for-inverter-based-resources\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"transmission-towers-and-substation-at-dusk\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/afcdedad-transmission-towers-and-substation-at-dusk.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Releases Facilities Ratings Best Practices Report<\/h3>\n                                                <h4 class=\"hidden-md-down\">D\u00e9cembre 19, 2022<\/h4>\n                                                <p class=\"image-card__description\">NERC report on best practices for utilities that have encountered facility ratings program challenges.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-releases-facilities-ratings-best-practices-report\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Electric Reliability Corporation\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/d160d165-gettyimages-636166410-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Files Comments in the FERC Generator Interconnection Notice of Proposed Rulemaking<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 21, 2022<\/h4>\n                                                <p class=\"image-card__description\">The rulemaking addresses improvements needed to reliably facilitate the power industry\u2019s transition to renewable and distributed generating resources utilizing inverter-based technologies.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-files-comments-in-the-ferc-generator-interconnection-notice-of-proposed-rulemaking\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1718569266-sm\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/10\/GettyImages-1718569266-sm.jpg 2008w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Releases Inverter-Based Resource Strategy Plan<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 25, 2022<\/h4>\n                                                <p class=\"image-card__description\">The North American Electric Reliability Corporation (NERC) recently released an Inverter-Based Resource (IBR) Strategy, which details the steps needed to successfully integrate IBR facilities into the planning and operation of the power system. The strategy was put in place due to the rapid interconnection of IBR systems, which are extensively used for solar and wind generating facilities, including new battery-based energy storage systems and are one of the most significant drivers of power grid transformation. Because of control system inconsistencies, IBR facilities pose well-documented risks to power system reliability when this strategy\u2019s practices are not adhered to. NERC\u2019s plan calls attention to the need for thoughtful integration of IBRs and identifies current and future work required to mitigate reliability risks resulting from the deployment of this technology.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-releases-inverter-based-resource-strategy-plan\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"464\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-700x464.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"power-lines\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-700x464.png 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-300x199.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-1024x679.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-768x509.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-1536x1019.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-905x600.png 905w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-754x500.png 754w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines.png 1781w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Releases 2022 State of Reliability Report<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 16, 2022<\/h4>\n                                                <p class=\"image-card__description\">The North American Electric Reliability Corporation (NERC) recently released its 2022 State of Reliability report, which examines power system performance in calendar year 2021 and evaluates reliability performance trends. The 2022 report identified six key findings regarding power system performance that are summarized as follows:<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-releases-2022-state-of-reliability-report\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-534863741\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg 1510w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Proposes Implementation Guidance for PRC-019-2<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 22, 2022<\/h4>\n                                                <p class=\"image-card__description\">NERC has proposed implementation guidance for PRC-019-2, the standard that verifies coordination of generating unit facility or synchronous condenser voltage regulating controls, limit functions, equipment capabilities and protection system settings.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"transmission20lines20substations\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/e7d62e35-solar20panel20transmission20lines20substations.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Revisions to FAC-001 and FAC-002 Submitted for FERC Approval<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 12, 2022<\/h4>\n                                                <p class=\"image-card__description\">Reliability Standards FAC-001-4 and FAC-002-will resolve uncertainty regarding the meaning of \u201cmaterially modify\u201d under the currently effective standards. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/changes-coming-to-nerc-facility-interconnection-processes\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"silhouette-of-two-engineers-discussing-together\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/d1bc0a52-silhouette-of-two-engineers-discussing-together-921353782.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Order No. 881-A Has Implications for NERC Compliance Programs<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 23, 2022<\/h4>\n                                                <p class=\"image-card__description\">Updated Order will have significant impact on NERC compliance programs related to both PRC standards and facilities ratings. Utilities should review the Order\u2019s requirements and prepare for changes needed to remain compliant. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-order-no-881-a-has-implications-for-nerc-compliance-programs\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"electric-industrial-power-station-windmill-and-sola\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9d30f0d9-electric-industrial-power-station-windmill-and-solar-panels_479976496.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC\u2019s Revised PRC-024-3 Standard for Inverter-Based Generation Effective in October 2022<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 11, 2022<\/h4>\n                                                <p class=\"image-card__description\">Changes to PRC-024-3 in support of inverter-based generation performance are going into effect in October of this year. Interconnection programs and documentation procedures may need to be updated in order to maintain compliance. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nercs-revised-prc-024-3-standard-for-inverter-based-generation-effective-in-october-2022\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-989229564\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Issues Notice of Inquiry Regarding Dynamic Line Ratings<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 25, 2022<\/h4>\n                                                <p class=\"image-card__description\">There are significant technical challenges involved in implementing Dynamic Line Ratings in the planning and operation of utility systems. Utilities should be prepared to modify their NERC compliance programs as necessary to address the potential introduction of DLR in their businesses. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-issues-notice-of-inquiry-regarding-dynamic-line-ratings\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"pylon-and-photovoltaic-panels\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10e6f915-pylon-and-photovoltaic-panels-1143865401.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>New NERC Guidance Supports the Implementation of Grid Forming Inverters<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 8, 2022<\/h4>\n                                                <p class=\"image-card__description\">NERC has issued a new report highlighting the key attributes of various inverter controls to support proper implementation and to protect reliability. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-provides-technical-support-for-grid-forming-inverters\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1070427216\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-1536x1025.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-899x600.jpg 899w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216-749x500.jpg 749w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/02\/GettyImages-1070427216.jpg 1812w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Recommends Approaches for Underfrequency Load Shedding Programs<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 24, 2022<\/h4>\n                                                <p class=\"image-card__description\">In a recently released reliability guideline, NERC recommends additional approaches for Underfrequency Load Shedding (UFLS) program design to help utilities effectively consider the effects of Distributed Energy Resources (DERs). The guidance was developed to address the accelerated transition of the power system to locally installed, decarbonized resources that depend on inverters. These new technologies introduce operational controls issues into the electric grid. UFLS data gathering and analysis methodologies may require modification to address reliability risks.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-recommends-approaches-for-underfrequency-load-shedding-programs\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"544\" height=\"500\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/c9d7cd17-regs.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"c9d7cd17-regs\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/c9d7cd17-regs.jpg 664w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/c9d7cd17-regs-300x276.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/c9d7cd17-regs-653x600.jpg 653w\" sizes=\"(max-width: 544px) 100vw, 544px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/apercus\/\" class=\"image-card__category\">Aper\u00e7us<\/a>                                                <h3>Ordonnance no 2222 de la FERC, DER et technologie de l\u2019\u00e9nergie<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 1, 2022<\/h4>\n                                                <p class=\"image-card__description\">La FERC a publi\u00e9 le projet d\u2019\u00e9mission O. 2222 pour permettre aux ressources \u00e9nerg\u00e9tiques distribu\u00e9es (DER) de mieux participer aux c\u00f4t\u00e9s des ressources traditionnelles dans les march\u00e9s de gros r\u00e9gionaux et organis\u00e9s.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ordonnance-no-2222-de-la-ferc-der-et-technologie-de-lenergie\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"307\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-700x307.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"protection-and-controls_2\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-700x307.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-300x132.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-1024x450.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-768x337.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-1536x675.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-1366x600.webp 1366w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2-1000x439.webp 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/13edd08a-protection-and-controls_2.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC and FERC Recommend Protection System Commissioning Improvements<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 18, 2022<\/h4>\n                                                <p class=\"image-card__description\">Between 18 and 36 percent of reported utility misoperations were attributed to issues that could have been detected through a properly implemented PSC. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-and-ferc-issue-joint-recommendations-for-protection-system-commissioning-improvements\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"d4eb5574-microsoftteams-image-33\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/d4eb5574-microsoftteams-image-33.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC &#038; NERC Issue Joint Report on Freeze Reliability Failures<\/h3>\n                                                <h4 class=\"hidden-md-down\">D\u00e9cembre 15, 2021<\/h4>\n                                                <p class=\"image-card__description\">The in-depth report outlines twenty-eight recommendations to address freeze reliability failures, including operating practices and recommendations for NERC standards modifications surrounding generator winterization and gas-electric coordination.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-nerc-joint-report-freeze-reliability\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"465\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-700x465.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"cold-weather\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-700x465.png 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-300x199.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-1024x680.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-768x510.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-1536x1020.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-904x600.png 904w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather-753x500.png 753w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/cold-weather.png 1776w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Accelerates Additional Cold Weather Standards Changes<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 22, 2021<\/h4>\n                                                <p class=\"image-card__description\">\nAt its November 2021 meeting, NERC\u2019s Board of Trustees took aggressive action to advance critical cold weather Reliability Standards. Most notably, the group approved the 2022-2024 Reliability Standards Development Plan, which prioritizes standards projects for the coming years including a resolution to include new cold weather operations, preparedness and coordination standards as high priority development projects.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-accelerates-cold-weather-standards\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"395\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-700x395.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-665252122\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-700x395.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-1024x577.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-768x433.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-1536x866.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-2048x1155.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-1064x600.jpg 1064w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-887x500.jpg 887w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                                                                <h3>PRC-002-2 Disturbance Monitoring and Reporting Standard: Initial Mandatory Implementation Plan Dates Approach<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 18, 2021<\/h4>\n                                                <p class=\"image-card__description\">The Federal Energy Regulatory Commission approved PRC-002-2 in September, 2015. The initial due date for system studies necessary to identify locations for the collection of disturbance related data under Requirement R1 is January 1, 2017.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/prc-002-2-disturbance-monitoring-and-reporting-standard-initial-mandatory-implementation-plan-dates-approach\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"665\" height=\"500\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess-665x500.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"0ec0f37f-chess\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess-665x500.webp 665w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess-300x226.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess-1024x770.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess-768x578.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess-1536x1155.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess-798x600.webp 798w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0ec0f37f-chess.webp 1792w\" sizes=\"(max-width: 665px) 100vw, 665px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Substation Hardening: Don\u2019t Be a Pawn to Security<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 28, 2021<\/h4>\n                                                <p class=\"image-card__description\">Protecting our critical energy infrastructure from physical security threats is certainly not a game, but the process can take some important lessons from the game of chess.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/substation-hardening-dont-be-a-pawn-to-security\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-Potential-Compliance-Standards-Identified-at-FERC-Technical-Conference-on-Reliability-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>New Potential Compliance Standards Identified at FERC Technical Conference on Reliability<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 18, 2021<\/h4>\n                                                <p class=\"image-card__description\">With a focus on the reliability impact of extreme weather and the shortcomings of current system planning approaches, both NERC and FERC conference participants opened the door to potential forthcoming compliance standard enhancements or changes. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-technical-conference-reliability\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Issues-Odessa-Texas-Disturbance-Report-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Issues-Odessa-Texas-Disturbance-Report-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Issues Odessa Texas Disturbance Report<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 29, 2021<\/h4>\n                                                <p class=\"image-card__description\">While NERC has analyzed multiple similar events in California, this is the first disturbance involving a widespread reduction of PV resource power output observed in the Texas Interconnection. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-issues-odessa-texas-disturbance-report\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"447\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-700x447.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"snowy-powerline-in-winter\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-700x447.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-300x192.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-1024x654.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-768x490.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-1536x981.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-940x600.jpg 940w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter-783x500.jpg 783w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/snowy-powerline-in-winter.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Approves Modifications to NERC\u2019s Cold Weather-Related Standards<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 7, 2021<\/h4>\n                                                <p class=\"image-card__description\">The Federal Energy Regulatory Commission has approved changes to three mandatory NERC Reliability Standards that aim to better prepare the North American power system to withstand extreme cold weather events.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/cold-weather-standards-approved\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"371\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Salton-Sea-scaled-4\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4.png 1032w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4-300x159.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4-1024x543.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4-768x407.png 768w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC&rsquo;s Generator Relay Loadability Standard is Now in Effect<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 30, 2021<\/h4>\n                                                <p class=\"image-card__description\">Alors que le syst\u00e8me de distribution d\u2019\u00e9lectricit\u00e9 continue d\u2019\u00e9voluer rapidement en raison des initiatives de politique de d\u00e9carbonisation du gouvernement f\u00e9d\u00e9ral et des \u00c9tats, les ressources bas\u00e9es sur les onduleurs (IBRs) jouent un r\u00f4le central lorsqu\u2019il s\u2019agit d\u2019ajouter une nouvelle capacit\u00e9 de production d\u2019\u00e9lectricit\u00e9 dans le syst\u00e8me d\u2019alimentation en vrac (BPS).\nPour combler les lacunes de fiabilit\u00e9 li\u00e9es \u00e0 la technologie IBR dans les applications de stockage d\u2019\u00e9nergie solaire, \u00e9olienne et par batterie, la FERC a r\u00e9cemment publi\u00e9 l\u2019ordonnance no 901. L\u2019ordonnance no 901 enjoint \u00e0 la NERC d\u2019\u00e9laborer des normes nouvelles ou modifi\u00e9es qui exigent que les propri\u00e9taires et\/ou les exploitants fournissent des donn\u00e9es exactes sur le rendement de l\u2019installation lorsqu\u2019ils sont raccord\u00e9s au secteur parapublic. La FERC a fait remarquer que de telles donn\u00e9es sont n\u00e9cessaires pour appliquer des mod\u00e8les de syst\u00e8me pr\u00e9cis afin que les services publics interconnect\u00e9s puissent planifier, exploiter et analyser avec succ\u00e8s le rendement des RIF.  \nL\u2019ordonnance no 901 de la FERC documente le pi\u00e8tre rendement en mati\u00e8re de fiabilit\u00e9 des RCI depuis 2016 et d\u00e9crit les lacunes de fiabilit\u00e9 qui ont \u00e9t\u00e9 d\u00e9tect\u00e9es de fa\u00e7on g\u00e9n\u00e9rale dans quatre domaines cl\u00e9s :\n\n\tPartage de donn\u00e9es\n\tValidation du mod\u00e8le\n\t\u00c9tudes de planification et d\u2019exploitation\n\tExigences de rendement\n\nComme il a \u00e9t\u00e9 mentionn\u00e9 dans la mise \u00e0 jour r\u00e9glementaire pr\u00e9c\u00e9dente de la CVR sur la s\u00e9rie de webinaires de la NERC IBR, la NERC a fourni des ressources \u00e9ducatives pour aider les experts techniques de l\u2019industrie \u00e0 naviguer dans cette question complexe. De plus, la NERC a publi\u00e9 un document de FAQ couvrant les th\u00e8mes g\u00e9n\u00e9raux identifi\u00e9s dans les plus de 1 000 commentaires et questions re\u00e7us tout au long de la s\u00e9rie. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nercs-generator-relay-loadability-standard-is-now-in-effect\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"clean-energy\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy.png 1130w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-300x200.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-1024x682.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-768x512.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-900x600.png 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC cherche \u00e0 am\u00e9liorer les rapports sur le rendement de la fiabilit\u00e9 du GADS<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 26, 2021<\/h4>\n                                                <p class=\"image-card__description\">En vertu de la loi habilitante qui a cr\u00e9\u00e9 l\u2019Electric Reliability Organization, la NERC est responsable d\u2019\u00e9valuer le rendement fiable du r\u00e9seau \u00e9lectrique. L\u2019une des fa\u00e7ons dont la NERC le fait est d\u2019obtenir un syst\u00e8me de rapports de l\u2019industrie pour la production et le transport. Le Syst\u00e8me de donn\u00e9es sur la disponibilit\u00e9 des g\u00e9n\u00e9rateurs (GADS) est utilis\u00e9 par la NERC et l\u2019industrie depuis plus de 40 ans pour obtenir des donn\u00e9es sur la composante de production du syst\u00e8me \u00e9lectrique[1].  \nEn raison de l\u2019\u00e9volution rapide de la composition des ressources de production, il est essentiel que NERC dispose de donn\u00e9es compl\u00e8tes sur les installations, les \u00e9v\u00e9nements, les pannes et les performances pour la production photovolta\u00efque et \u00e9olienne afin d\u2019assurer la fiabilit\u00e9. \u00c0 mesure que les technologies renouvelables sont de plus en plus d\u00e9ploy\u00e9es, un ensemble complet de statistiques sur le rendement des actifs de production est n\u00e9cessaire pour permettre \u00e0 la NERC d\u2019\u00e9valuer la capacit\u00e9 du syst\u00e8me \u00e0 r\u00e9pondre \u00e0 la charge, la performance du r\u00e9seau \u00e9lectrique et de pr\u00e9voir tout probl\u00e8me de fiabilit\u00e9 potentiel en raison de l\u2019insuffisance des ressources. \nPar cons\u00e9quent, la NERC propose d\u2019apporter les am\u00e9liorations suivantes au processus de collecte de donn\u00e9es GADS pour la production d\u2019\u00e9nergie renouvelable&nbsp;:\n\n\tAjouter les propri\u00e9taires de g\u00e9n\u00e9rateurs qui exploitent des installations solaires photovolta\u00efques de 20 MW ou plus au Syst\u00e8me de donn\u00e9es sur la disponibilit\u00e9 de la production (appel\u00e9 \u00ab GADS-PV \u00bb)&nbsp;; et\n\t\u00c9largir les rapports GADS Wind (\u00ab&nbsp;GADS-W&nbsp;\u00bb) pour inclure le stockage d\u2019\u00e9nergie connect\u00e9e et le rapport d\u2019\u00e9v\u00e9nements.\n<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-cherche-a-ameliorer-les-rapports-sur-le-rendement-de-la-fiabilite-du-gads\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"1907f223-ercot-transmission\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/1907f223-ercot-transmission.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Electric Reliability Council of Texas Releases 60-Point Plan for Change<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 23, 2021<\/h4>\n                                                <p class=\"image-card__description\">ERCOT\u2019s recently released \u201cRoadmap to Improving Grid Reliability\u201d presents a plan for change in Texas that includes increasing electric power generation and purchasing significantly more power reserves.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/electric-reliability-council-of-texas-releases-its-60-point-plan-for-change\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"307\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-700x307.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"f4a996d8-nerc-compliance\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-700x307.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-300x132.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-1024x450.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-768x337.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-1536x675.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-1366x600.webp 1366w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance-1000x439.webp 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/f4a996d8-nerc-compliance.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Prepare for Upcoming NERC Compliance Deadlines<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 20, 2021<\/h4>\n                                                <p class=\"image-card__description\">With 2020 right around the corner, there are many new NERC standards and standards requirements set to go into effect in the areas of Critical Infrastructure Protection and Transmission Operations and Planning.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/prepare-for-upcoming-nerc-compliance-deadlines\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"777c8e0e-microsoftteams-image-19\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/777c8e0e-microsoftteams-image-19.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Developments in Texas and Nationally Mandate Extreme Weather Responses to Protect Reliability<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 23, 2021<\/h4>\n                                                <p class=\"image-card__description\">Two recent actions will change the current system planning, investment needs and operating procedures for electric utilities. New infrastructure investments and more robust compliance programs will be needed. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/developments-in-texas-and-nationally-mandate-extreme-weather-responses-to-protect-reliability\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"440\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-700x440.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-471943873-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-700x440.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-300x188.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-1024x643.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-768x482.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-1536x964.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-2048x1286.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-956x600.jpg 956w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-796x500.jpg 796w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Electric System Planning for Extreme Weather Events: NERC Recommends Actions to Protect Reliability this Summer<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 23, 2021<\/h4>\n                                                <p class=\"image-card__description\">Due to recent extreme weather-related power systems failures, stakeholders are examining the planning and operations practices for all electric utilities.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/electric-system-planning-for-extreme-weather-events\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"9325eb27-substation-and-power-transmission-lines-1226921578\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-768x513.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-1536x1025.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-899x600.webp 899w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578-749x500.webp 749w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/9325eb27-substation-and-power-transmission-lines-1226921578.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC\u2019s FAC-008 Guidance on Facility Ratings<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 24, 2021<\/h4>\n                                                <p class=\"image-card__description\">FAC-008 is one of the most data-intensive standards in the NERC regulatory framework. Compliance has been difficult for many utilities.  Recently, FERC made public it\u2019s intent to address serious allegations of facility ratings violations, including a lack of rigor by one utility.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-action-facilities-ratings\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"350\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-700x350.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-700x350.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-300x150.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-1024x512.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-768x384.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-1536x768.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-1200x600.webp 1200w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance-1000x500.webp 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-Battery-Energy-Storage-Systems-Reliability-Guidance.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Issues Battery Energy Storage Systems Reliability Guidance<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 22, 2021<\/h4>\n                                                <p class=\"image-card__description\">While NERC has recently published a reliability guideline addressing inverter-based resources generally, they are now giving more attention to the various potential uses of BESS to support effective implementation with newly released guidance.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-issues-battery-energy-storage-systems-reliability-guidance\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Proposes-Revisions-to-CIP-008\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revisions-to-CIP-008.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Proposes Revisions to CIP-008<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 27, 2021<\/h4>\n                                                <p class=\"image-card__description\">NERC\u2019s CIP-008 standard aims to mitigate reliability risks resulting from a Cyber Security Incident by specifying incident response requirements. Newly proposed revisions would augment mandatory reporting to include incidents that compromise, or attempt to compromise, a utility\u2019s Electronic Security Perimeter (ESP) or associated Electronic Access Control or Monitoring Systems (EACMS).<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-cip-008\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"powerline-snow-winter\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Cold Weather Reliability Preparedness and Hardening<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 22, 2021<\/h4>\n                                                <p class=\"image-card__description\">The latest weather impacts to power reliability have accelerated the need for mandatory regulatory compliance changes. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/cold-weather-reliability-preparedness-and-hardening\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"387\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-700x387.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-700x387.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-300x166.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-1024x566.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-768x425.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-1536x849.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-1085x600.webp 1085w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828-904x500.webp 904w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/10f61d9f-compliance-theme-with-aerial-view-of-city-skylines-1211589828.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Releases 2021 Compliance Monitoring and Enforcement Findings<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 8, 2021<\/h4>\n                                                <p class=\"image-card__description\">NERC&rsquo;s 2021 Compliance Monitoring and Enforcement Program reframes the previous year\u2019s risks and their associated areas of focus. Utilities should review their compliance programs and internal controls to determine if enhancement or changes are need to maintain compliance.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-releases-2021-compliance-monitoring-and-enforcement-findings\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"350\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-700x350.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Proposes-Revision-of-Pending\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-700x350.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-300x150.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-1024x512.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-768x384.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-1536x768.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-1200x600.webp 1200w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending-1000x500.webp 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Proposes-Revision-of-Pending.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Proposes Revision of Pending TPL-001-5.1 Standard<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 20, 2021<\/h4>\n                                                <p class=\"image-card__description\">NERC has recently undertaken important standards and guidance development activities related to the proliferation of inverter-based technologies such as solar and wind generation, as well as battery energy storage which is growing as an industry solution to ensure the reliability of renewable power for end-use customers.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-addresses-distributed-energy-resources\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-and-FERC-Take-Action-on-Facilities-Ratings\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-and-FERC-Take-Action-on-Facilities-Ratings.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC and FERC Take Action on Facilities Ratings<\/h3>\n                                                <h4 class=\"hidden-md-down\">D\u00e9cembre 4, 2020<\/h4>\n                                                <p class=\"image-card__description\">There has been significant work across the electric industry to improve facility ratings related processes, programs, frameworks, internal controls and best practices. Yet this continues to be a challenging area for utilities, particularly from an asset management and regulatory compliance perspective.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-and-ferc-take-action-on-facilities-ratings\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-768x513.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-1536x1025.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-899x600.webp 899w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits-749x500.webp 749w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/FERC-Issues-Annual-Report-on-Critical-Infrastructure-Protection-CIP-Reliability-Audits.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Issues Annual Report on Critical Infrastructure Protection (CIP) Reliability Audits<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 17, 2020<\/h4>\n                                                <p class=\"image-card__description\">In its 2020 Report on CIP Reliability Audits, the Federal Energy Regulatory Commission found that most of the cybersecurity protection processes and procedures adopted by utilities met the mandatory CIP requirements for protecting the Bulk Electric System. However, there are areas for improvement.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-issues-annual-report-on-critical-infrastructure-protection-cip-reliability-audits\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Prioritizes-Inverter-Based-Resources-for-Future-Standards-Development.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Prioritizes Inverter-Based Resources for Future Standards Development<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 19, 2020<\/h4>\n                                                <p class=\"image-card__description\">As inverter-based resources found in wind and solar generation technologies continue to rapidly penetrate the U.S. power delivery system, NERC remains focused on managing the potential reliability consequences.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prioritizes-inverter-based-resources-for-future-standards-development\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Issues-2020-State-of-Reliability-Report-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Issues-2020-State-of-Reliability-Report-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Issues 2020 State of Reliability Report<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 22, 2020<\/h4>\n                                                <p class=\"image-card__description\">The Report identifies areas of ongoing concern including generation reserve margins and the reliability risk from shifting the resource mix toward renewables.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-issues-2020-state-of-reliability-report\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"443\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-700x443.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"technologies\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-700x443.png 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-300x190.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-1024x648.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-768x486.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-1536x972.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-948x600.png 948w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies-790x500.png 790w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/technologies.png 1568w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Issues Lessons Learned on Misoperations Due to Mixing Relay Technologies<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 13, 2020<\/h4>\n                                                <p class=\"image-card__description\">On July 10, 2020 NERC released new Lessons Learned guidance to address situations where multiple composite protection systems have misoperated as a result of mixing protective relay technologies at the remote terminals of directional comparison blocking (DCB) schemes. This technical information will help utilities improve the reliability of the Bulk Power System.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-issues-lessons-learned-on-misoperations-due-to-mixing-relay-technologies\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Voltage-Protection-Settings-for-Generating-Resources-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 28, 2020<\/h4>\n                                                <p class=\"image-card__description\">On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"384\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-700x384.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Summary-of-NERC-CIP-Standards-Updates-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-700x384.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-300x164.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-1024x561.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-768x421.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-1536x842.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-1095x600.webp 1095w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1-912x500.webp 912w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Summary-of-NERC-CIP-Standards-Updates-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Summary of NERC CIP Standards Updates<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 29, 2020<\/h4>\n                                                <p class=\"image-card__description\">FERC has released a notice of inquiry seeking comments on potential enhancements to NERC\u2019s Critical Infrastructure Protection (CIP) Reliability Standards.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/more-changes-coming-for-nerc-cip-standards\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Protection-System-Compliance-Studies-Due-This-Year-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/NERC-Protection-System-Compliance-Studies-Due-This-Year-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Protection System Compliance Studies Due This Year<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 24, 2020<\/h4>\n                                                <p class=\"image-card__description\">NERC&rsquo;s PRC-027-1 standard was approved by FERC in 2018 and is set to go into effect on October 1, 2020. Utilities should begin preparing now to meet compliance requirements which include significant system studies.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-protection-system-compliance-studies-due-this-year\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-700x466.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"1389c41c-power-tower\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-700x466.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-1536x1023.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-901x600.jpg 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1389c41c-power-tower.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/white-papers\/\" class=\"image-card__category\">White Papers \/ Reports<\/a>                                                <h3>NERC Compliance Assurance: Maintaining Cross Functional Data Integrity<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 21, 2020<\/h4>\n                                                <p class=\"image-card__description\">Assuring continued power system reliability is a complex undertaking for utilities. Balancing the demands of system changes and regulatory compliance is an essential strategy for optimizing ongoing operations. Given the wide range of NERC standard families that require simultaneous data management for compliance, data integrity, data flow and data verification are critical for avoiding violations that can impact electric service to customers and communities.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-compliance-assurance-maintaining-cross-functional-data-integrity\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"308\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-700x308.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"b65d7094-physical-and-cyber-security\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-700x308.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-300x132.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-1024x450.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-768x337.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-1536x675.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-1366x600.jpg 1366w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security-1000x439.jpg 1000w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/b65d7094-physical-and-cyber-security.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                                                                <h3>NERC Reliability Report Prioritizes Power System Security Risks for Action<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 2, 2020<\/h4>\n                                                <p class=\"image-card__description\">NERC\u2019s 2019 ERO Reliability Risk Priorities Report identified and prioritized the major risks facing the utility industry with a particular focus on security issues.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-reliability-report-prioritizes-power-system-security-risks-for-action\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"495\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1402147678-700x495.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1402147678\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1402147678-700x495.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1402147678-300x212.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1402147678.jpg 703w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Reliability Report Prioritizes Power System Risks<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 21, 2019<\/h4>\n                                                <p class=\"image-card__description\">Looking ahead to the many changes coming to North America\u2019s Bulk Power System (BPS), NERC\u2019s 2019 ERO Reliability Risk Priorities Report highlights the top issues requiring industry and regulatory attention and recommends actions for the ongoing protection of BPS reliability. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-reliability-report-prioritizes-power-system-risks\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Pursues-Changes-to-Protection-Relay-and-Control-PRC-Standards-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Pursues Changes to Protection Relay and Control (PRC) Standards<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 24, 2019<\/h4>\n                                                <p class=\"image-card__description\">Two Standards Authorization Requests currently being debated in the NERC stakeholder engagement process could help clarify PRC standards obligations for generator owners and operators. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-pursues-changes-to-protection-relay-and-control-prc-standards\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-636068142\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC to Modify Standard and Develop Compliance Guidance to Accommodate Inverter-Based Generation Technologies<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 20, 2019<\/h4>\n                                                <p class=\"image-card__description\">Renewable energy systems have&#160;dramatically changed the power generation resource mix. These new generation technologies no longer involve directly coupled rotating generators which were once standard in the industry. Now, inverters that change Direct Current (DC) electricity to the Alternating Current (AC) electricity suitable for delivery via AC transmission systems are becoming more prevalent, raising reliability&hellip;<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-to-modify-standard-and-develop-compliance-guidance-to-accommodate-inverter-based-generation-technologies\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"484\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-700x484.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-700x484.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-300x207.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-1024x708.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-768x531.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-1536x1062.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-868x600.webp 868w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1-723x500.webp 723w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/NERC-Addresses-Single-Points-of-Failure-in-Protection-Systems-Among-Other-FERC-Concerns-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Addresses Single Points of Failure in Protection Systems Among Other FERC Concerns<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 25, 2018<\/h4>\n                                                <p class=\"image-card__description\">As inverter-based resources found in wind and solar generation technologies continue to rapidly penetrate the U.S. power delivery system, NERC remains focused on managing the potential reliability consequences. Building on\u00a0NERC\u2019s 2019 analysis\u00a0of several major power disturbances and its report outlining the risks of inverter-based renewable energy resources, the Inverter-Based Resources Task Force (IBRTF) recently issued an industry survey, the results of which will serve as a roadmap for future standards or guidance activities.\r\nContact Us<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-addresses-single-points-of-failure-in-protection-systems-among-other-ferc-concerns\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1344124162-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-2048x1366.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1344124162-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                                                                <h3>NERC Proposes Compliance Monitoring and Enforcement Plan for 2019<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 26, 2018<\/h4>\n                                                <p class=\"image-card__description\">This month, NERC released the first draft of its 2019 Compliance Monitoring and Enforcement Plan (CMEP) which identifies power delivery system risks and outlines compliance audit requirements for next year. The risk elements outlined in the plan include significant differences from previous years, as shown in the table below. Each NERC region must consider these risks as they develop their monitoring and audit scopes for utilities. Utilities should be prepared to be audited and implement any necessary compliance initiatives in these areas.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-compliance-monitoring-and-enforcement-plan-for-2019\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-483313074\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-483313074-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Calls for New Approach to Reliability Planning Due to Gas Supply Disruption Risks<\/h3>\n                                                <h4 class=\"hidden-md-down\">D\u00e9cembre 14, 2017<\/h4>\n                                                <p class=\"image-card__description\">A recently published NERC report concludes that as reliance on natural gas to meet electric generation requirements increases, additional planning and operational measures must be considered to mitigate power system reliability risks.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-calls-for-new-approach-to-reliability-planning-due-to-gas-supply-disruption-risks\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/5d21a930-trc-cfats-cyber-security-700x466.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"5d21a930-trc-cfats-cyber-security\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/5d21a930-trc-cfats-cyber-security-700x466.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/5d21a930-trc-cfats-cyber-security-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/5d21a930-trc-cfats-cyber-security-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/5d21a930-trc-cfats-cyber-security-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/5d21a930-trc-cfats-cyber-security.jpg 800w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Hardening Cyber Defenses at Chemical Facilities a Key Part of Federal CFATS Regulations<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 24, 2017<\/h4>\n                                                <p class=\"image-card__description\">Federal CFATS regulations cover more than just the handling, transport and storage of dangerous chemicals. They also deal with tools and methods terrorists could use to acquire the deadly agents &#8211; such as a cyber attack.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/hardening-cyber-defenses-at-chemical-facilities-a-key-part-of-federal-cfats-regulations\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-496264156\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-496264156-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC CIP-013-1 Standard for Supply Chain Risk Management<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 29, 2017<\/h4>\n                                                <p class=\"image-card__description\">NERC has filed mandatory standard CIP-013-1 for supply chain risk management, requiring controls to mitigate cyber threats and their impact to the reliable operation of the Bulk Electric System.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-files-cip-013-1-for-supply-chain-risk-management\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1493729544\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Identifies New Reliability Risk due to Utility Scale Solar Generation Inverter Design<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 13, 2017<\/h4>\n                                                <p class=\"image-card__description\">NERC has released a report documenting its findings and recommendations related to reliability risks from utility scale solar generation projects with implications for PRC-024 compliance, as well as generation, interconnection and protection system technologies.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-identifies-new-reliability-risk-due-to-utility-scale-solar-generation-inverter-design\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"465\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-700x465.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-172424949\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-700x465.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-300x199.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-1024x680.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-768x510.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-1536x1020.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-2048x1361.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-903x600.jpg 903w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-172424949-753x500.jpg 753w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Standard Extends Maintenance Program Obligations to Generators<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 3, 2014<\/h4>\n                                                <p class=\"image-card__description\">The approval of NERC Standard PRC-005-2 extends protection system maintenance obligations to Generators and crates one comprehensive standard establishing minimum maintenance activities and maximum time intervals for protection systems and load shedding equipment affecting the bulk electric system.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-standard-extends-maintenance-program-obligations-to-generators\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                    <\/div>\n                <\/div>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-news-and-insights -->","protected":false},"excerpt":{"rendered":"<p>NERC has proposed implementation guidance for PRC-019-2, the standard that verifies coordination of generating unit facility or synchronous condenser voltage regulating controls, limit functions, equipment capabilities and protection system settings.<\/p>\n","protected":false},"featured_media":13120,"template":"","tags":[189,251,280,291,299,300],"news-and-insights-category":[360],"services-category":[1005,994],"custom_category":[],"class_list":["post-1242","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-electric-utilities","tag-nerc","tag-power-and-utilities","tag-protection-and-controls","tag-regulatory-and-environmental-compliance","tag-regulatory-compliance","news-and-insights-category-regulatory-updates","services-category-electrical-and-power","services-category-regulatory-compliance"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NERC Proposes Implementation Guidance for PRC-019-2 - TRC Companies<\/title>\n<meta name=\"description\" content=\"The proposed guidance provides valuable information regarding approaches to assuring coordination between a generator voltage control system and its associated protection functions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NERC Proposes Implementation Guidance for PRC-019-2 - TRC Companies\" \/>\n<meta property=\"og:description\" content=\"The proposed guidance provides valuable information regarding approaches to assuring coordination between a generator voltage control system and its associated protection functions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-12T13:10:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1510\" \/>\n\t<meta property=\"og:image:height\" content=\"1007\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/\",\"name\":\"NERC Proposes Implementation Guidance for PRC-019-2 - TRC Companies\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg\",\"datePublished\":\"2022-08-22T13:27:13+00:00\",\"dateModified\":\"2024-12-12T13:10:44+00:00\",\"description\":\"The proposed guidance provides valuable information regarding approaches to assuring coordination between a generator voltage control system and its associated protection functions.\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg\",\"width\":1510,\"height\":1007,\"caption\":\"detail of oil pipeline with valves in large oil refinery\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NERC Proposes Implementation Guidance for PRC-019-2 - TRC Companies","description":"The proposed guidance provides valuable information regarding approaches to assuring coordination between a generator voltage control system and its associated protection functions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/","og_locale":"fr_CA","og_type":"article","og_title":"NERC Proposes Implementation Guidance for PRC-019-2 - TRC Companies","og_description":"The proposed guidance provides valuable information regarding approaches to assuring coordination between a generator voltage control system and its associated protection functions.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/","og_site_name":"TRC Companies","article_modified_time":"2024-12-12T13:10:44+00:00","og_image":[{"width":1510,"height":1007,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/","name":"NERC Proposes Implementation Guidance for PRC-019-2 - TRC Companies","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg","datePublished":"2022-08-22T13:27:13+00:00","dateModified":"2024-12-12T13:10:44+00:00","description":"The proposed guidance provides valuable information regarding approaches to assuring coordination between a generator voltage control system and its associated protection functions.","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-proposes-implementation-guidance-for-prc-019-2\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-534863741.jpg","width":1510,"height":1007,"caption":"detail of oil pipeline with valves in large oil refinery"},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1242\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/13120"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=1242"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=1242"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=1242"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=1242"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=1242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}