{"id":1231,"date":"2023-03-31T13:55:50","date_gmt":"2023-03-31T13:55:50","guid":{"rendered":"https:\/\/www.trccompanies.com\/insights\/modeling-power-system-hosting-capacity\/"},"modified":"2024-12-11T17:00:59","modified_gmt":"2024-12-11T17:00:59","slug":"modeling-power-system-hosting-capacity","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/","title":{"rendered":"Modeling Power System Hosting Capacity"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <h2>How To Manage a More Efficient, Successful Interconnection Process<\/h2>\n<p>As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines. Proactively modeling power system hosting capacity can provide detailed insight into your grid constraints that will streamline and accelerate the interconnection process. With careful attention to data accuracy, leveraging a hosting capacity analysis can improve your success.<\/p>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/markets\/power-and-utilities\/electric-utilities\/\" target=\"_self\">Electric Utilities<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/electrical-power\/substations\/\" target=\"_self\">Substations<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/engineering\/electrical-power\/transmission-engineering\/\" target=\"_self\">Transmission Engineering<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                                                            <div class=\"wysiwyg__links__bottom\">\n                                    <a href=\"https:\/\/www.trccompanies.com\/services\" target=\"_self\">View All Services<\/a>\n                                <\/div>\n                                                                                                <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white-fog\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                    <div class=\"wysiwyg__columns-text-top\">\n                        <div class=\"row js-animated-content animated-content\">\n                            <div class=\"col-lg-8 js-animated-content animated-content\">\n                                <div class=\"option-links\">\n                                    <ul>\n                                                                            <\/ul>\n                                <\/div>\n                                <h2>Current Challenges<\/h2>\n<p>Interconnecting DERs to the grid has become very cumbersome for utilities thanks to a variety of compounding challenges, all of which reinforce the need for a new modeling approach.<\/p>\n<p>Facing these challenges, plus a growing pressure to modernize and automate systems and operations, utilities should consider a new analytical approach that has many benefits for the industry.<\/p>\n                                \n                            <\/div>\n                            <div class=\"col-lg-4\">\n                                                            <\/div>\n                        <\/div>\n                    <\/div>\n                            <\/div>\n\n                                                                        <div class=\"col-lg-4 \">\n                                                        <div class=\"js-animated-content animated-content\">\n                                <h3>Regional Regulatory Differences<\/h3>\n<p>Not only are utilities facing a huge influx of requests from developers, but they must manage the many required system analyses within different rules and different timelines across states and regions. Depending on the territory where a developer is applying for interconnection, load study deadlines for a utility can range from 60 to 45 or even 30 days. Operating under these time constraints only serves to exacerbates ongoing workforce and data challenges and slows down progress toward clean energy goals.<\/p>\n                            <\/div>\n                        <\/div>\n                                                                                <div class=\"col-lg-4 columns\">\n                                                        <div class=\"js-animated-content animated-content\">\n                                <h3>Limited Workforce Resources and Outsourcing<\/h3>\n<p>The utility industry is facing an unprecedent workforce development challenge. With many workers retiring and the competitive nature of bringing new, long-term engineers and technicians in the door, it is currently very difficult to tackle the demands of DER system impact studies and interconnection analyses in-house. In fact, this work is being outsourced more and more- up to 70% of the time. But because many utilities don\u2019t know where or how they can host new capacity, supporting contractors often must estimate data to meet regulatory deadlines.<\/p>\n                            <\/div>\n                        <\/div>\n                                                                                <div class=\"col-lg-4 columns\">\n                                                        <div class=\"js-animated-content animated-content\">\n                                <h3>Inaccessible, Inconsistent Data<\/h3>\n<p>Accurate, accessible system data is critical to producing a true model of grid interconnection capacity. It\u2019s important to know substation load data, current loads on each feeder, and number of customers who will be impacted. The goal is to report as close to a 100% clean representation of what\u2019s out in the field to see what level of injection from the interconnection application is viable. While some utilities have this data readily available, it is often difficult and onerous to determine because there are many variables and system configurations that change throughout the year due to rebuilds and maintenance upgrades, or other modernization initiatives.<\/p>\n                            <\/div>\n                        <\/div>\n                                                                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-accordion -->\n<section class=\"fx-accordion js-accordion section-margins\">\n    <div class=\"container-fluid\">\n        <div class=\"fx-accordion-flex\">\n                        <div class=\"fx-accordion-top-content js-animated-content animated-content\">\n                <div class=\"fx-accordion-top-content__inner\">\n                    <h2>Benefits of Hosting Capacity Analysis<\/h2>\n<p>A hosting capacity analysis captures the current state of a utility\u2019s power system and details conditions at various locations on the grid to help determine where additional DERs can be added without complex, time consuming interconnection studies and without the need for costly upgrades. Proactively modeling a power system\u2019s hosting capacity can help utilities more easily and effectively respond to future interconnection requests, meet regulatory deadlines and deliver a cleaner, more resilient grid for customers. While it requires an investment of time and resources up front, modeling hosting capacity has many benefits once an analysis is in place.<\/p>\n                <\/div>\n            <\/div>\n                                    <div class=\"fx-accordion-right\">\n                <div class=\"fx-accordion__panels js-animated-content animated-content\">    \n                                        <article class=\"fx-accordion__panel js-accordion-item icon--collapse\" data-accordion-id=\"0\">\n                        <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"0\">Speeds Interconnection Response and Approval Times<\/button>    \n                        <div class=\"fx-accordion__panel__content\">\n                            <p>Knowing in advance where your distribution system stands and what additional capacity it can handle significantly cuts down on the time it takes to address developer requests for interconnection. This is especially helpful when deadlines and staff resources are tight. With hosting capacity data already established, a utility has what it needs to promptly respond to requests and more effectively prepare any additional interconnection or protection systems studies required. Staff no longer need to scramble to prepare each individual study or gather datasets over and over from scratch.<\/p>\n                                                    <\/div>\n                    <\/article>\n                                        <article class=\"fx-accordion__panel js-accordion-item\" data-accordion-id=\"1\">\n                        <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"1\">Streamlines Processes and Enhances Accuracy<\/button>    \n                        <div class=\"fx-accordion__panel__content\">\n                            <p>Having a hosting capacity analysis in place helps reduce the number of steps it takes to conduct required system studies, but also ensures greater accuracy in those studies by eliminating a common practice of estimating model data. Without easy access to accurate system data previously established in a hosting capacity analysis, it\u2019s hard to prove if an interconnection request can be successfully accommodated. Estimates often must be made to meet deadlines. Knowing your capacity at various locations right off the bat can streamline the study and reporting processes and increase the accuracy of those analyses.<\/p>\n                                                    <\/div>\n                    <\/article>\n                                        <article class=\"fx-accordion__panel js-accordion-item\" data-accordion-id=\"2\">\n                        <button class=\"fx-accordion__panel__toggle js-accordion-headline\" type=\"button\" data-accordion-id=\"2\">Improves Planning and Reduces Costs<\/button>    \n                        <div class=\"fx-accordion__panel__content\">\n                            <p>A hosting capacity analysis is a quicker, more cost-effective approach to identifying the optimal interconnection load and locations for new distributed energy resources. This study provides a comprehensive look at what level of DERs can be integrated for a given amount of investment, based on a utility\u2019s goals and objectives. Hosting capacity provides insights into strategies for mitigating potential impact on existing services, avoiding over-saturation of certain areas, and recommending areas for further investment. This could improve a utility\u2019s capacity to confidently invest in DERs in a cost-effective manner while also maximizing the return-on-investment.<\/p>\n                                                    <\/div>\n                    <\/article>\n                                    <\/div>\n            <\/div>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-accordion -->\n\n<!-- Start Block: acf\/innerpage-half-text-half-image -->\n\n<section class=\"half-and-half flex-row section-padding image-block-left bg-white text-column-one image-size-cover\">\n    <div class=\"half-and-half-image\">\n        <div class=\"half-and-half-image__wrap\">\n                    <\/div>\n    <\/div>\n    \n    <div class=\"half-and-half-text\">\n        <div class=\"half-and-half-text__wrapper js-animated-content animated-content\">\n                                        <h2>Data is Critical for Success<\/h2>\n<p>To conduct a thorough hosting capacity analysis, it is crucial to extract and validate as much accurate system data as possible. A utility must account for voltage and power quality constraints, protection limits, and safety issues, but also where the interconnection point is, what devices are being interconnected and what is already tied into the distribution system. Conductor sizes should be inventoried, and substation loads for each feeder- including hours of operation and average versus peak loads- tracked. Customer loads and how they are allocated throughout the systems are also critical; are there industrial plants or residential uses; is the location urban or rural.<\/p>\n<p>Where can utilities mine for all of this information? Automatic metering systems can help simulate the data, as can billing systems and\/or customer information systems. Using a combination of maps and data can be helpful in prioritizing geographic areas where more interconnection requests are likely. GIS systems and one-line diagrams are particularly useful.<\/p>\n<p>Gathering, documenting and updating hosting capacity data can be complex. It is often useful to have a special outside advisor tasked specifically with accessing, preparing, hosting and maintaining the data on your behalf. Once the initial hosting capacity analysis is established, updating distribution model data a minimum of twice a year is recommended to ensure ongoing and complete accuracy. Updates should reflect data that accounts for any system additions, upgrades or maintenance. This information can come directly from your system planning and\/or grid modernization teams who can account for changes in anticipated feeder percentage growth, feeder and substation expansion plans, planned system improvement and feeder reconfiguration.<\/p>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-half-text-half-image -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-purple\">\n    <div class=\"container-fluid\">\n                    <div class=\"wysiwyg__wrapper\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                            <div class=\"col-lg-12 js-animated-content animated-content\">\n                    <h2>Next Steps<\/h2>\n<p>Overall, hosting capacity analysis can lead to a faster, more efficient, and cost-effective interconnection process that helps utilities, developers, and regulators understand the impacts of adding DERs in both the short-term and long-term. This not only supports the efficient, deployment of modernization, reliability and resiliency upgrades that benefit all ratepayers, but it helps utilities meet constricted regulatory deadlines with reduced time and effort and addresses data accuracy and accessibility issues while delivering a cleaner grid for customers.<\/p>\n<p>Having a trusted partner who can help guide you through the complexities of establishing your hosting capacity can increase your odds of success. TRC\u2019s team of power system studies experts help utilities make smarter decisions about their power systems. Our rigorous assessments and analyses are designed to ensure that any new generation added to a region\u2019s transmission or distribution system will not have an adverse impact on system reliability and operating characteristics. Learn more about our solutions or contact us today.<\/p>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.trccompanies.com\/contact-us\/\">Contact Us<\/a><\/p>\n                <\/div>\n                                <\/div>\n\n                    <\/div>\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-cta-bar -->\n<section class=\"global-cta innerpage-cta default\">\n    <div class=\"container-fluid\">\n        <div class=\"global-cta-wrapper  \">\n                                            <h2>S&rsquo;adapter au <br>changement<\/h2>\n                                <div class=\"global-cta-image\">\n                    <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" width=\"316.566\" height=\"369\" viewBox=\"0 0 316.566 369\">\n                        <defs>\n                            <pattern id=\"pattern\" width=\"1\" height=\"1\" viewBox=\"117.006 0 316.566 369\">\n                                <image preserveAspectRatio=\"xMidYMid slice\" width=\"655.35\" height=\"369\" href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp\"><\/image>\n                            <\/pattern>\n                        <\/defs>\n                        <path id=\"Union_8\" data-name=\"Union 8\" d=\"M72.087,369,206.869,190.294h109.7L182.891,369ZM0,195.818H68.4l28.66,44.507L68.4,286.43Zm0-10.747L68.4,94.466l28.66,46.1L68.4,185.071Zm205.769-6.365L72.087,0h109.7L316.566,178.706Z\" fill=\"url(#pattern)\"\/>\n                    <\/svg>\n                <\/div>\n                <div class=\"global-cta-content\">\n                    <p>Collaborez avec les praticiens test\u00e9s de TRC<\/p>\n                    <p>\n                        <a href=\"https:\/\/www.trccompanies.com\/contact-us\/\" title=\"Contact Us\" class=\"btn btn-primary\" >Contact Us<\/a>                    <\/p>\n                <\/div>\n                        \n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-cta-bar -->\n\n<!-- Start Block: acf\/innerpage-news-and-insights -->\n<section class=\"image-cards image-cards--news-and-insights section-margins image-cards--with-slider image-cards--innerpage\">\n    <div class=\"container-fluid\">\n        <div class=\"image-cards__wrap\">\n            <div class=\"image-cards__left\">\n                <div>\n                    <h2>Partager nos perspectives<\/h2>\n<p>Nos praticiens partagent leurs id\u00e9es et leurs points de vue sur les tendances et les d\u00e9fis qui fa\u00e7onnent le march\u00e9.<\/p>\n                <\/div>\n                                <div class=\"image-cards__btn\">\n                    <a href=\"https:\/\/www.trccompanies.com\/insights\/\" title=\"View More\" class=\"btn btn-tertiary\" >View More<\/a>                <\/div>\n                            <\/div>\n                            <div class=\"image-cards__right\">\n                    <div class=\"js-image-cards-slider fx-slider\">\n                                                        <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Aerial-view-of-the-solar-panel-in-solar-farm-1367034894\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2026\/04\/Aerial-view-of-the-solar-panel-in-solar-farm-1367034894-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Approves\u00a0Milestone 3\u00a0Grid Reliability Standards for\u00a0Renewable Energy\u00a0IBRs<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 10, 2026<\/h4>\n                                                <p class=\"image-card__description\">On February 19, the Federal Energy Regulatory Commission (FERC) approved a set of five new grid reliability standards developed by the North American Electric Reliability Corporation (NERC). These standards target a central challenge: as solar, wind, batteries and other modern energy resources expand rapidly, the data and models used to plan and operate the grid have not kept pace.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-approves-milestone-3-grid-reliability-standards-for-renewable-energy-ibrs\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-700x466.jpeg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"bbb267a7-17c1-4586-b50e-f9efd42bcc74\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-700x466.jpeg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-300x200.jpeg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-1024x682.jpeg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-768x512.jpeg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-1536x1024.jpeg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-2048x1365.jpeg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-900x600.jpeg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2025\/05\/bbb267a7-17c1-4586-b50e-f9efd42bcc74-750x500.jpeg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Bridging the Power Gap: Why Transmission Expansion is Critical for the Data Center Boom<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 9, 2025<\/h4>\n                                                <p class=\"image-card__description\">The U.S. is experiencing an unprecedented data center boom, fueled by the rise of artificial intelligence (AI), cloud computing and digital transformation across industries.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/bridging-the-power-gap-why-transmission-expansion-is-critical-for-the-data-center-boom\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/7eda09b9-bottom-look-up-power-transmission-towers_139484168-1440x960-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Grid Resiliency: Perspectives Across the Power Grid\u00a0<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 16, 2025<\/h4>\n                                                <p class=\"image-card__description\">In today\u2019s changing energy landscape, grid resiliency is a top priority for all power system owners and operators. The ability to absorb disruptions and maintain power is crucial in an increasingly unpredictable world.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/grid-resiliency-perspectives-across-the-power-grid\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"350\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/01-What-Is-Grid-Resilience-and-How-Can-It-Be-Improved.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"01-What-Is-Grid-Resilience-and-How-Can-It-Be-Improved\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/01-What-Is-Grid-Resilience-and-How-Can-It-Be-Improved.png 1200w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/01-What-Is-Grid-Resilience-and-How-Can-It-Be-Improved-300x150.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/01-What-Is-Grid-Resilience-and-How-Can-It-Be-Improved-1024x512.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/01-What-Is-Grid-Resilience-and-How-Can-It-Be-Improved-768x384.png 768w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/apercus\/\" class=\"image-card__category\">Aper\u00e7us<\/a>                                                <h3>Qu\u2019est-ce que la r\u00e9silience du r\u00e9seau et comment peut-elle \u00eatre am\u00e9lior\u00e9e&nbsp;?<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 5, 2024<\/h4>\n                                                <p class=\"image-card__description\">Comprendre la r\u00e9silience du r\u00e9seau \u00e9lectrique. P\u00e9renniser vos op\u00e9rations avec les soci\u00e9t\u00e9s TRC, en utilisant la technologie et l\u2019expertise pour renforcer la r\u00e9silience du r\u00e9seau aujourd\u2019hui. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/quest-ce-que-la-resilience-du-reseau-et-comment-peut-elle-etre-amelioree\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1.webp 1792w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Aerial-view-of-electrical-wires-large-scale-power-energy-tower-497627242-1-scaled-1-901x600.webp 901w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La mise \u00e0 jour du FAC-003-5 apporte des changements radicaux aux classifications de transmission \u00e0 compter du 1er avril<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 19, 2024<\/h4>\n                                                <p class=\"image-card__description\">La mise \u00e0 jour du FAC-003-5 apporte des changements radicaux aux classifications de transmission \u00e0 compter du 1er avril  <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-mise-a-jour-du-fac-003-5-apporte-des-changements-radicaux-aux-classifications-de-transmission-a-compter-du-1er-avril\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Engineer_working_on_multiple_displays.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Engineer_working_on_multiple_displays\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Engineer_working_on_multiple_displays.webp 1792w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Engineer_working_on_multiple_displays-300x169.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Engineer_working_on_multiple_displays-1024x576.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Engineer_working_on_multiple_displays-768x432.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Engineer_working_on_multiple_displays-1536x864.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Engineer_working_on_multiple_displays-1067x600.webp 1067w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/apercus\/\" class=\"image-card__category\">Aper\u00e7us<\/a>                                                <h3>Se pr\u00e9parer \u00e0 l\u2019avenir des \u00e9tudes sur les syst\u00e8mes d\u2019alimentation, aujourd\u2019hui<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 9, 2024<\/h4>\n                                                <p class=\"image-card__description\">Comment la CVR s\u2019adapte pour fournir des r\u00e9solutions uniques pour la transition \u00e9nerg\u00e9tique<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/se-preparer-a-lavenir-des-etudes-sur-les-systemes-dalimentation-aujourdhui\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1469790487\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487.jpg 2121w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487-1536x1023.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487-2048x1364.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/08\/GettyImages-1469790487-901x600.jpg 901w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/apercus\/\" class=\"image-card__category\">Aper\u00e7us<\/a>                                                <h3>Les \u00e9l\u00e9ments essentiels de la gestion de la v\u00e9g\u00e9tation<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 1, 2024<\/h4>\n                                                <p class=\"image-card__description\">La gestion de la v\u00e9g\u00e9tation \u00e9volue afin de r\u00e9duire le risque de dommages \u00e0 l\u2019infrastructure des services publics. D\u00e9couvrez comment nos services de gestion de la v\u00e9g\u00e9tation peuvent vous aider. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/les-elements-essentiels-de-la-gestion-de-la-vegetation\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"business-meeting\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting.jpg 2121w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/business-meeting-900x600.jpg 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/apercus\/\" class=\"image-card__category\">Aper\u00e7us<\/a>                                                <h3>Responsabiliser les ing\u00e9nieurs : ma\u00eetriser le passage de l\u2019expertise technique au leadership<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 20, 2023<\/h4>\n                                                <p class=\"image-card__description\">La transition du travail sur le terrain des services publics \u00e0 la gestion peut \u00eatre une d\u00e9cision gratifiante, mais elle peut \u00e9galement \u00eatre \u00e9crasante.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/responsabiliser-les-ingenieurs-maitriser-le-passage-de-lexpertise-technique-au-leadership\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"extreme-weather-initiative-changes-transmission-planning-\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/ade40da1-ferc-extreme-weather-initiative-changes-transmission-planning-process.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Extreme Weather Initiative Will Change the Transmission Planning Process<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 26, 2023<\/h4>\n                                                <p class=\"image-card__description\">FERC issued a Final Rule directing NERC to develop a new or modified reliability standard addressing transmission system planning performance requirements for extreme heat or cold weather events.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-extreme-weather-initiative-changes-transmission-planning-process\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"41dcd979-gettyimages-1190354242-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/41dcd979-gettyimages-1190354242-1.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Issues Order on Cold Weather Reliability Standards<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 27, 2023<\/h4>\n                                                <p class=\"image-card__description\">FERC has approved two NERC proposed cold weather-related reliability standards.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-issues-order-on-cold-weather-reliability-standards\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Modeling Power System Hosting Capacity<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 31, 2023<\/h4>\n                                                <p class=\"image-card__description\">As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"72e2e911-substation-in-the-evening-1163113257\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/72e2e911-substation-in-the-evening-1163113257.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Orders Internal Network Security Monitoring Rule to be Finalized<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 14, 2023<\/h4>\n                                                <p class=\"image-card__description\">FERC directed NERC to develop Reliability Standards to implement INSM within trusted CIP environments.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-orders-internal-network-security-monitoring-rule-to-be-finalized\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"485\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-700x485.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-847470250-a\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-700x485.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-300x208.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-1024x710.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-768x532.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-1536x1064.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-866x600.jpg 866w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a-722x500.jpg 722w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-847470250-a.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                                                                <h3>TRC Companies Assisting LS Power Grid Maine with New Transmission Project in Maine<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 2, 2023<\/h4>\n                                                <p class=\"image-card__description\">TRC Companies announces its role as a consultant in supporting the new transmission project by LS Power Grid Maine.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trc-companies-assisting-ls-power-grid-maine-with-new-transmission-project-in-maine\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"464\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-700x464.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"power-lines\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-700x464.png 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-300x199.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-1024x679.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-768x509.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-1536x1019.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-905x600.png 905w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines-754x500.png 754w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/09\/power-lines.png 1781w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Releases 2022 State of Reliability Report<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 16, 2022<\/h4>\n                                                <p class=\"image-card__description\">The North American Electric Reliability Corporation (NERC) recently released its 2022 State of Reliability report, which examines power system performance in calendar year 2021 and evaluates reliability performance trends. The 2022 report identified six key findings regarding power system performance that are summarized as follows:<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-releases-2022-state-of-reliability-report\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/56eb414a-transition-to-renewables-from-hydrocarbons-pylon-and-photovoltaic-panels-1143865401.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/videos\/\" class=\"image-card__category\">Videos<\/a>                                                <h3>Webinar Replay: How the DOE and Utilities Can Work Together on IIJA Funding Initiatives<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 29, 2022<\/h4>\n                                                <p class=\"image-card__description\">View our webinar replay of our IIJA funding initiatives webinar with Jigar Shah, Director of the Loan Programs Office &#8211; US Department of Energy.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/how-the-doe-and-utilities-can-work-together-on-iija-funding-initiatives\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-989229564\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-989229564-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>FERC Issues Notice of Inquiry Regarding Dynamic Line Ratings<\/h3>\n                                                <h4 class=\"hidden-md-down\">avril 25, 2022<\/h4>\n                                                <p class=\"image-card__description\">There are significant technical challenges involved in implementing Dynamic Line Ratings in the planning and operation of utility systems. Utilities should be prepared to modify their NERC compliance programs as necessary to address the potential introduction of DLR in their businesses. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/ferc-issues-notice-of-inquiry-regarding-dynamic-line-ratings\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"369\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-700x369.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-2150018076-scaled\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-700x369.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-300x158.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-1024x540.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-768x405.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-1536x810.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-2048x1080.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-1138x600.jpg 1138w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/12\/GettyImages-2150018076-948x500.jpg 948w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>What Does a Transmission Engineer Do?<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 2, 2021<\/h4>\n                                                <p class=\"image-card__description\">With the increased energy demands comes a need to better\u00a0manage\u00a0how suppliers route their power. Power transmission engineers step in to fill this role.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/what-does-a-transmission-engineer-do\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1332517053\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053.jpg 2121w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1332517053-900x600.jpg 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                                                                <h3>Comment fonctionne une grille de distribution&nbsp;?<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 2, 2021<\/h4>\n                                                <p class=\"image-card__description\">Les syst\u00e8mes de distribution \u00e9lectrique s\u2019appuient sur une technologie sophistiqu\u00e9e pour fournir de l\u2019\u00e9nergie en cas de besoin. L\u2019\u00e9lectricit\u00e9 est produite \u00e0 la demande, ce qui signifie qu\u2019il y a souvent des p\u00e9riodes de pointe o\u00f9 les fournisseurs voient un plus grand besoin d\u2019\u00e9lectricit\u00e9 et le syst\u00e8me doit s\u2019av\u00e9rer r\u00e9actif. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/comment-fonctionne-une-grille-de-distribution\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"bc61f524-smart-home-automation-control-system-1097894826\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-1536x1025.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/bc61f524-smart-home-automation-control-system-1097894826.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Managing the Future of Electric Utilities<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 1, 2021<\/h4>\n                                                <p class=\"image-card__description\">The future of electric utilities depends on IT\/OT convergence to ensure reliability and resiliency.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/future-of-electric-utilities\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"440\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-700x440.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-471943873-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-700x440.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-300x188.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-1024x643.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-768x482.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-1536x964.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-2048x1286.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-956x600.jpg 956w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/GettyImages-471943873-1-796x500.jpg 796w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Electric System Planning for Extreme Weather Events: NERC Recommends Actions to Protect Reliability this Summer<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 23, 2021<\/h4>\n                                                <p class=\"image-card__description\">Due to recent extreme weather-related power systems failures, stakeholders are examining the planning and operations practices for all electric utilities.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/electric-system-planning-for-extreme-weather-events\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"powerline-snow-winter\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter-750x500.jpg 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/powerline-snow-winter.jpg 1600w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Cold Weather Reliability Preparedness and Hardening<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 22, 2021<\/h4>\n                                                <p class=\"image-card__description\">The latest weather impacts to power reliability have accelerated the need for mandatory regulatory compliance changes. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/cold-weather-reliability-preparedness-and-hardening\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-661805558\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558-899x600.jpg 899w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558-749x500.jpg 749w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2020\/10\/GettyImages-661805558.jpg 1400w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/news\/\" class=\"image-card__category\">News<\/a>                                                <h3>Transform Utility Engineering with LineHub\u2122<\/h3>\n                                                <h4 class=\"hidden-md-down\">octobre 12, 2020<\/h4>\n                                                <p class=\"image-card__description\">LineHub\u2122 brings PLS-CADDTM model data together with enterprise GIS, SAP and other data systems from across the utility, providing a digital story of the entire grid infrastructure.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trc-companies-premiers-linehub-an-enterprise-digital-workflow-and-pls-cadd-data-management-solution-for-utilities\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"393\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3e6a5796-trc-talks-linehub.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"3e6a5796-trc-talks-linehub\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3e6a5796-trc-talks-linehub.png 1273w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3e6a5796-trc-talks-linehub-300x168.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3e6a5796-trc-talks-linehub-1024x574.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3e6a5796-trc-talks-linehub-768x431.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/3e6a5796-trc-talks-linehub-1070x600.png 1070w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/videos-fr\/\" class=\"image-card__category\">Vid\u00e9os<\/a>                                                <h3>TRC Talks- LineHub&nbsp;: Transformer l\u2019ing\u00e9nierie des services publics gr\u00e2ce \u00e0 la gestion des donn\u00e9es num\u00e9riques<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 10, 2020<\/h4>\n                                                <p class=\"image-card__description\">LineHub\u2122 est une solution r\u00e9volutionnaire qui rassemble des donn\u00e9es provenant de l\u2019ensemble d\u2019un service public, offrant une vue globale de l\u2019ensemble du r\u00e9seau.  <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trc-talks-linehub-transformer-lingenierie-des-services-publics-grace-a-la-gestion-des-donnees-numeriques\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"496\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-700x496.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-539953552\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-700x496.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-300x213.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-1024x726.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-768x544.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-1536x1089.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-2048x1452.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-847x600.jpg 847w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-539953552-705x500.jpg 705w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>TRC Digital Partners with Treverity to Put Utility Engineers at the Center of Their Data<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 26, 2020<\/h4>\n                                                <p class=\"image-card__description\">As part of TRC&rsquo;s LineHub solution, Treverity helps transmission engineers get a holistic view of the grid through powerful digital data visualization and a customer-centric user interface. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trc-partners-with-treverity-to-put-utility-engineers-at-the-center-of-their-data\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Electrician Measurements With Multimeter Testing Current Ele\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2163787522-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/news\/\" class=\"image-card__category\">News<\/a>                                                <h3>TRC Acquires Utility Support Systems, Inc.<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 22, 2013<\/h4>\n                                                <p class=\"image-card__description\">TRC Companies has acquired Georgia-based Utility Support Systems, Inc. , a professional engineering company primarily supporting the power\/utility market. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trc-acquires-utility-support-systems-inc\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                    <\/div>\n                <\/div>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-news-and-insights -->","protected":false},"excerpt":{"rendered":"<p>As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines. <\/p>\n","protected":false},"featured_media":12746,"template":"","tags":[189,523,280,330,337],"news-and-insights-category":[363],"services-category":[1005,1003],"custom_category":[],"class_list":["post-1231","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-electric-utilities","tag-electrical-and-power-engineering","tag-power-and-utilities","tag-substations","tag-transmission-engineering","news-and-insights-category-insights","services-category-electrical-and-power","services-category-engineering"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Modeling Power System Hosting Capacity - TRC Companies<\/title>\n<meta name=\"description\" content=\"As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modeling Power System Hosting Capacity - TRC Companies\" \/>\n<meta property=\"og:description\" content=\"As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-11T17:00:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1792\" \/>\n\t<meta property=\"og:image:height\" content=\"1194\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/\",\"name\":\"Modeling Power System Hosting Capacity - TRC Companies\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp\",\"datePublished\":\"2023-03-31T13:55:50+00:00\",\"dateModified\":\"2024-12-11T17:00:59+00:00\",\"description\":\"As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines.\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp\",\"width\":1792,\"height\":1194},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Modeling Power System Hosting Capacity - TRC Companies","description":"As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/","og_locale":"fr_CA","og_type":"article","og_title":"Modeling Power System Hosting Capacity - TRC Companies","og_description":"As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/","og_site_name":"TRC Companies","article_modified_time":"2024-12-11T17:00:59+00:00","og_image":[{"width":1792,"height":1194,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/","name":"Modeling Power System Hosting Capacity - TRC Companies","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp","datePublished":"2023-03-31T13:55:50+00:00","dateModified":"2024-12-11T17:00:59+00:00","description":"As renewable energy development booms, and distributed energy resources (DERs) proliferate across the grid, the demand for a more efficient and timely interconnection process is at an all-time high. To meet regulatory deadlines and satisfy the needs of both developers and customers, utilities must tackle an increasingly complex array of system impact studies, analyses and reports, under ever shrinking timelines.","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/modeling-power-system-hosting-capacity\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/e2fdef7d-photovoltaic-panels-of-solar-power-station-at-sunset-662095604.webp","width":1792,"height":1194},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1231","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1231\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/12746"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=1231"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=1231"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=1231"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=1231"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=1231"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}