{"id":1120,"date":"2022-11-22T16:29:37","date_gmt":"2022-11-22T16:29:37","guid":{"rendered":"https:\/\/www.trccompanies.com\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/"},"modified":"2024-12-12T12:40:29","modified_gmt":"2024-12-12T12:40:29","slug":"biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites","status":"publish","type":"news-and-insights","link":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/","title":{"rendered":"Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites"},"content":{"rendered":"<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-white\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                            <div class=\"col-lg-8 columns js-animated-content animated-content\">\n                                        <p>Because of challenges related to the Federal Coal Combustion Residuals (CCR) Rule, owners and operators of CCR units are actively making decisions on corrective measures to address CCR effects on water quality, often implementing closure options and remedy selection to achieve compliance. Because the Rule requires that an owner\/operator meet groundwater protection standards (GWPS) under a stringent timeframe, many are seeking ways to use in-situ technologies to expedite GWPS compliance through enhanced attenuation (EA) strategies.<\/p>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www.trccompanies.com\/contact-us\/\">Contact Us<\/a><\/p>\n                <\/div>\n                <div class=\"col-lg-4 columns js-animated-content animated-content\">\n                                        <div class=\"wysiwyg__links js-animated-content animated-content\">\n                        <div class=\"wysiwyg__links__top \">\n                                                        <h4>Related Services<\/h4>\n                                                                                    <ul class=\"js-animated-content animated-content\">\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/remediation-and-materials-management\/coal-ash-management\/\" target=\"_self\">Coal Ash Management<\/a><\/li>\n                                                                <li><a href=\"https:\/\/www.trccompanies.com\/services\/remediation-and-materials-management\/remediation-engineering\/\" target=\"_self\">Remediation Engineering<\/a><\/li>\n                                                            <\/ul>\n                                                    <\/div>\n                                                                                                            <div class=\"wysiwyg__links__bottom\">\n                                    <a href=\"https:\/\/www.trccompanies.com\/services\" target=\"_self\">View All Services<\/a>\n                                <\/div>\n                                                                                                <\/div>\n                <\/div>\n                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-promotion-blocks -->\n\n<section class=\"cta-right-image-text\">\n    <div class=\"cta-right-image-text__wrap\">\n        <div class=\"cta-right-image-text__text\">\n            <div class=\"cta-right-image-text__text__wrap js-animated-content animated-content\">\n                <h2>Download and Read our White Paper for More Details About:<\/h2>\n<ul>\n<li>Reductants and Biotic Processes<\/li>\n<li>Biochemical Reduction Testing<\/li>\n<li>Arsenic and Selenium Stabilization<\/li>\n<li>ZVI Testing<\/li>\n<li>Biowall Testing<\/li>\n<\/ul>\n<p><a class=\"btn btn-primary\" href=\"https:\/\/www2.trccompanies.com\/Biotic-Abiotic-Reduction-to-Achieve-Groundwater-Compliance\" target=\"_blank\" rel=\"noopener\">Download the White Paper<\/a><\/p>\n            <\/div>\n        <\/div>\n        <div class=\"cta-right-image-text__image\">\n            <img decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2021\/11\/GettyImages-1312405670.jpg\" class=\"object-fit\" alt=\"GettyImages-1312405670\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2021\/11\/GettyImages-1312405670.jpg 1920w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2021\/11\/GettyImages-1312405670-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2021\/11\/GettyImages-1312405670-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2021\/11\/GettyImages-1312405670-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2021\/11\/GettyImages-1312405670-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2021\/11\/GettyImages-1312405670-900x600.jpg 900w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/>            <span class=\"top\"><\/span>\n            <span class=\"bottom\"><\/span>\n            <span class=\"left\"><\/span>\n            <span class=\"right\"><\/span>\n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-promotion-blocks -->\n\n<!-- Start Block: acf\/wysiwyg -->\n\n<section class=\"wysiwyg section-padding bg-purple\">\n    <div class=\"container-fluid\">\n        \n        <div class=\"row\">\n                        <div class=\"col-lg-12\">\n                                                                                \n                                                <\/div>\n\n                                                                        <div class=\"col-lg-4 \">\n                                                        <div class=\"js-animated-content animated-content\">\n                                <h3>Two case studies tests<\/h3>\n<p>TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.<\/p>\n<p>The first case study tested the application of Zero Valent Iron (ZVI) via direct-push injection techniques as an alternative means of attenuating a plume with persistent levels of arsenic. Based on the results from these tests, a pilot-scale test using a mixture of ZVI and ferrous sulfate was proposed and is currently being implemented.<\/p>\n                            <\/div>\n                        <\/div>\n                                                                                <div class=\"col-lg-4 columns\">\n                                                        <div class=\"js-animated-content animated-content\">\n                                <p>The second case study had a groundwater extraction system installed at a former CCR impoundment to provide enhanced natural attenuation. This case found that a permeable reactive barrier (PRB) was not recommended due to the concern of long-term permeability issues, which could result in the diversion of groundwater flow around the PRB.<\/p>\n<p>These case studies provide valuable insight into implementing groundwater compliance strategies. Based on the data, it\u2019s important to obtain a clear site conceptual model, incorporating geochemistry, hydrogeology, and attenuation parameters, and ensure the system is stable before assessing or making recommendations.<\/p>\n                            <\/div>\n                        <\/div>\n                                                                                <div class=\"col-lg-4 columns\">\n                                                        <div class=\"js-animated-content animated-content\">\n                                <p>We have found that the removal of CCR from an impoundment does not always result in a quick attainment of GWPS, and Monitored Natural Attenuation (MNA) may take time. Reductant treatment technologies such as ZVI can be effective at stabilizing metals through sorption and coprecipitation reactions. The addition of ZVI not only facilitates these abiotic reactions, but also promotes biotic reactions that occur simultaneously. Once it is determined that EA may be appropriate for the site, a feasible application method needs to be evaluated. As part of the EA approach, it is also important to incorporate a monitoring program to ensure that the appropriate geochemical conditions are sustained, and that remobilization of metals will not occur.<\/p>\n                            <\/div>\n                        <\/div>\n                                                                    <\/div>\n\n            <\/div>\n<\/section>\n<!-- End Block: acf\/wysiwyg -->\n\n<!-- Start Block: acf\/innerpage-cta-bar -->\n<section class=\"global-cta innerpage-cta default\">\n    <div class=\"container-fluid\">\n        <div class=\"global-cta-wrapper  \">\n                                            <h2>Embrassez le changement<\/h2>\n                                <div class=\"global-cta-image\">\n                    <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" width=\"316.566\" height=\"369\" viewBox=\"0 0 316.566 369\">\n                        <defs>\n                            <pattern id=\"pattern\" width=\"1\" height=\"1\" viewBox=\"117.006 0 316.566 369\">\n                                <image preserveAspectRatio=\"xMidYMid slice\" width=\"655.35\" height=\"369\" href=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png\"><\/image>\n                            <\/pattern>\n                        <\/defs>\n                        <path id=\"Union_8\" data-name=\"Union 8\" d=\"M72.087,369,206.869,190.294h109.7L182.891,369ZM0,195.818H68.4l28.66,44.507L68.4,286.43Zm0-10.747L68.4,94.466l28.66,46.1L68.4,185.071Zm205.769-6.365L72.087,0h109.7L316.566,178.706Z\" fill=\"url(#pattern)\"\/>\n                    <\/svg>\n                <\/div>\n                <div class=\"global-cta-content\">\n                    <p>Collaborez avec les praticiens test\u00e9s de TRC<\/p>\n                    <p>\n                        <a href=\"https:\/\/www.trccompanies.com\/contact-us\/\" title=\"Contact Us\" class=\"btn btn-primary\" >Contact Us<\/a>                    <\/p>\n                <\/div>\n                        \n        <\/div>\n    <\/div>\n<\/section>\n\n<!-- End Block: acf\/innerpage-cta-bar -->\n\n<!-- Start Block: acf\/innerpage-news-and-insights -->\n<section class=\"image-cards image-cards--news-and-insights section-margins image-cards--with-slider image-cards--innerpage\">\n    <div class=\"container-fluid\">\n        <div class=\"image-cards__wrap\">\n            <div class=\"image-cards__left\">\n                <div>\n                    <h2>Partager nos perspectives<\/h2>\n<p>Nos praticiens partagent leurs id\u00e9es et leurs points de vue sur les tendances et les d\u00e9fis qui fa\u00e7onnent le march\u00e9.<\/p>\n                <\/div>\n                                <div class=\"image-cards__btn\">\n                    <a href=\"https:\/\/www.trccompanies.com\/insights\/\" title=\"View More\" class=\"btn btn-tertiary\" >View More<\/a>                <\/div>\n                            <\/div>\n                            <div class=\"image-cards__right\">\n                    <div class=\"js-image-cards-slider fx-slider\">\n                                                        <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"solar-photovoltaic-panels-and-substations\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/1d270728-solar-photovoltaic-panels-and-substations-in-the-evening-1035403678.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>Insights from the Odessa II Power System Disturbance<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 22, 2023<\/h4>\n                                                <p class=\"image-card__description\">NERC and TRE release the Odessa II Power System Disturbance Report<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/insights-from-the-odessa-ii-power-system-disturbance\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/0f7b8139-coal-fired-power-plant-smoke-stacks-platte-river-casper-wyoming-wind-turbines-821028416.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Preparing Your RMP Facility for a Future of Extreme Weather<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 29, 2022<\/h4>\n                                                <p class=\"image-card__description\">Facilities dealing with hazardous materials must prepare for extreme weather events that pose a risk to their operations and the community.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/preparing-your-rmp-facility-for-a-future-of-extreme-weather\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"460\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-700x460.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"coal-fueled-power-plant-facilty-new\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-700x460.png 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-300x197.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-1024x673.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-768x504.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-1536x1009.png 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-914x600.png 914w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-761x500.png 761w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/white-papers\/\" class=\"image-card__category\">White Papers \/ Reports<\/a>                                                <h3>Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 22, 2022<\/h4>\n                                                <p class=\"image-card__description\">TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-700x466.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"279034d1-renewables\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-700x466.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-1024x682.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-768x511.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-1536x1023.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-901x600.webp 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables-751x500.webp 751w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/279034d1-renewables.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Q&#038;A: Insights for Growing Utility-Scale Renewable Generation<\/h3>\n                                                <h4 class=\"hidden-md-down\">septembre 29, 2022<\/h4>\n                                                <p class=\"image-card__description\">TRC\u2019s Senior Vice President of Renewable answers key questions to help utilities and developers overcome challenges associated with an increase in renewable generation. <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/qa-insights-for-growing-utility-scale-renewable-generation\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"394\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-700x394.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-2166904607\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-700x394.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-1024x576.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-768x432.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-1536x864.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-2048x1152.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-1067x600.jpg 1067w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2016\/11\/GettyImages-2166904607-889x500.jpg 889w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>Using GIS Technology to Find Solar Development Sites<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 28, 2021<\/h4>\n                                                <p class=\"image-card__description\">Renewable energy developers are in a race to find the optimal places for solar projects. GIS technology identifies the best locations.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/using-gis-technology-to-find-solar-development-sites\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"395\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-700x395.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-665252122\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-700x395.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-300x169.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-1024x577.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-768x433.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-1536x866.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-2048x1155.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-1064x600.jpg 1064w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-665252122-887x500.jpg 887w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                                                                <h3>PRC-002-2 Disturbance Monitoring and Reporting Standard: Initial Mandatory Implementation Plan Dates Approach<\/h3>\n                                                <h4 class=\"hidden-md-down\">novembre 18, 2021<\/h4>\n                                                <p class=\"image-card__description\">The Federal Energy Regulatory Commission approved PRC-002-2 in September, 2015. The initial due date for system studies necessary to identify locations for the collection of disturbance related data under Requirement R1 is January 1, 2017.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/prc-002-2-disturbance-monitoring-and-reporting-standard-initial-mandatory-implementation-plan-dates-approach\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"371\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Salton-Sea-scaled-4\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4.png 1032w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4-300x159.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4-1024x543.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/Salton-Sea-scaled-4-768x407.png 768w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC&rsquo;s Generator Relay Loadability Standard is Now in Effect<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 30, 2021<\/h4>\n                                                <p class=\"image-card__description\"><\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nercs-generator-relay-loadability-standard-is-now-in-effect\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy.png\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"clean-energy\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy.png 1130w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-300x200.png 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-1024x682.png 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-768x512.png 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/clean-energy-900x600.png 900w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/mises-a-jour-reglementaires\/\" class=\"image-card__category\">Mises \u00e0 jour r\u00e9glementaires<\/a>                                                <h3>La NERC cherche \u00e0 am\u00e9liorer les rapports sur le rendement de la fiabilit\u00e9 du GADS<\/h3>\n                                                <h4 class=\"hidden-md-down\">ao\u00fbt 26, 2021<\/h4>\n                                                <p class=\"image-card__description\">En vertu de la loi habilitante qui a cr\u00e9\u00e9 l\u2019Electric Reliability Organization, la NERC est responsable d\u2019\u00e9valuer le rendement fiable du r\u00e9seau \u00e9lectrique. L\u2019une des fa\u00e7ons dont la NERC le fait est d\u2019obtenir un syst\u00e8me de rapports de l\u2019industrie pour la production et le transport. Le Syst\u00e8me de donn\u00e9es sur la disponibilit\u00e9 des g\u00e9n\u00e9rateurs (GADS) est utilis\u00e9 par la NERC et l\u2019industrie depuis plus de 40 ans pour obtenir des donn\u00e9es sur la composante de production du syst\u00e8me \u00e9lectrique[1].  \nEn raison de l\u2019\u00e9volution rapide de la composition des ressources de production, il est essentiel que NERC dispose de donn\u00e9es compl\u00e8tes sur les installations, les \u00e9v\u00e9nements, les pannes et les performances pour la production photovolta\u00efque et \u00e9olienne afin d\u2019assurer la fiabilit\u00e9. \u00c0 mesure que les technologies renouvelables sont de plus en plus d\u00e9ploy\u00e9es, un ensemble complet de statistiques sur le rendement des actifs de production est n\u00e9cessaire pour permettre \u00e0 la NERC d\u2019\u00e9valuer la capacit\u00e9 du syst\u00e8me \u00e0 r\u00e9pondre \u00e0 la charge, la performance du r\u00e9seau \u00e9lectrique et de pr\u00e9voir tout probl\u00e8me de fiabilit\u00e9 potentiel en raison de l\u2019insuffisance des ressources. \nPar cons\u00e9quent, la NERC propose d\u2019apporter les am\u00e9liorations suivantes au processus de collecte de donn\u00e9es GADS pour la production d\u2019\u00e9nergie renouvelable&nbsp;:\n\n\tAjouter les propri\u00e9taires de g\u00e9n\u00e9rateurs qui exploitent des installations solaires photovolta\u00efques de 20 MW ou plus au Syst\u00e8me de donn\u00e9es sur la disponibilit\u00e9 de la production (appel\u00e9 \u00ab GADS-PV \u00bb)&nbsp;; et\n\t\u00c9largir les rapports GADS Wind (\u00ab&nbsp;GADS-W&nbsp;\u00bb) pour inclure le stockage d\u2019\u00e9nergie connect\u00e9e et le rapport d\u2019\u00e9v\u00e9nements.\n<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/la-nerc-cherche-a-ameliorer-les-rapports-sur-le-rendement-de-la-fiabilite-du-gads\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"393\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-700x393.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"192008c2-trc-epa-emissions-combustion-turbines\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-700x393.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-300x169.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-1024x575.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-768x432.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-1536x863.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-1068x600.webp 1068w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines-890x500.webp 890w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/192008c2-trc-epa-emissions-combustion-turbines.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>EPA Proposes New Emissions Limits for Combustion Turbines<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 22, 2021<\/h4>\n                                                <p class=\"image-card__description\">After 15 years of legal limbo, combustion turbines could be facing new emissions standards under a proposal introduced by the EPA.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/epa-emissions-limits-combustion-turbines\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"444\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b529816d-trc-enr-top-500-2019-700x444.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"b529816d-trc-enr-top-500-2019\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b529816d-trc-enr-top-500-2019-700x444.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b529816d-trc-enr-top-500-2019-300x190.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b529816d-trc-enr-top-500-2019-768x487.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b529816d-trc-enr-top-500-2019-946x600.jpg 946w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b529816d-trc-enr-top-500-2019-789x500.jpg 789w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/b529816d-trc-enr-top-500-2019.jpg 1000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/news\/\" class=\"image-card__category\">News<\/a>                                                <h3>TRC Ranked No. 20 on Annual List of Top U.S. Design Firms<\/h3>\n                                                <h4 class=\"hidden-md-down\">mai 9, 2021<\/h4>\n                                                <p class=\"image-card__description\">TRC has once again been named one of the top engineering firms in the country by Engineering News-Record, finishing No. 20 on the publication\u2019s annual list of the Top 500 design firms.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trc-ranked-20-top-us-design-firms\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"466\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-700x466.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1216409748-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-700x466.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-1024x682.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-768x511.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-1536x1023.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-901x600.jpg 901w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1-751x500.jpg 751w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/08\/GettyImages-1216409748-1.jpg 2000w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/insights\/\" class=\"image-card__category\">Insights<\/a>                                                <h3>The View on Climate Change has Changed in Washington<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 1, 2021<\/h4>\n                                                <p class=\"image-card__description\">The Biden Administration signals both a renewed and accelerated focus on climate change.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/the-view-on-climate-change-has-changed-in-washington\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-700x467.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Voltage-Protection-Settings-for-Generating-Resources-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-700x467.webp 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-300x200.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-1024x683.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-768x512.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-1536x1024.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-900x600.webp 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1-750x500.webp 750w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/Voltage-Protection-Settings-for-Generating-Resources-1.webp 1792w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Reliability Standard PRC-024-3 Approved: Frequency and Voltage Protection Settings for Generating Resources<\/h3>\n                                                <h4 class=\"hidden-md-down\">juillet 28, 2020<\/h4>\n                                                <p class=\"image-card__description\">On July 9, 2020 NERC standard PRC-024-3 was approved, paving the way for improved protection systems in support of keeping generating resources connected during defined frequency and voltage excursions.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-prc-024-3-reliability-standard-frequency-and-voltage-protection-settings-for-generating-resources\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"667\" height=\"500\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1-667x500.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1-667x500.webp 667w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1-300x225.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1-1024x768.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1-768x576.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1-1536x1152.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1-800x600.webp 800w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/10\/New-York-State-Finalizes-Emission-Limits-for-Power-Generators-1.webp 1792w\" sizes=\"(max-width: 667px) 100vw, 667px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>New York State Finalizes Emission Limits for Power Generators<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 21, 2020<\/h4>\n                                                <p class=\"image-card__description\">On January 16, 2020, the New York State Department of Environmental Conservation (NYSDEC) finalized a rulemaking limiting nitrogen oxide (NOx) emissions from existing simple cycle and regenerative peaking combustion turbines with a nameplate capacity of 15 megawatts (MW) or greater during the ozone season (May 1 \u2013 October 31). <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/new-york-state-finalizes-emission-limits-for-power-generators\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"667\" height=\"500\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1-667x500.webp\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1-667x500.webp 667w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1-300x225.webp 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1-1024x768.webp 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1-768x576.webp 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1-1536x1152.webp 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1-800x600.webp 800w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/New-York-State-Proposes-Emissions-Limits-for-Power-Generators-1.webp 1792w\" sizes=\"(max-width: 667px) 100vw, 667px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>New York State Proposes Emissions Limits for Power Generators<\/h3>\n                                                <h4 class=\"hidden-md-down\">mars 22, 2019<\/h4>\n                                                <p class=\"image-card__description\">On February 27, 2019, the New York State Department of Environmental Conservation (NYSDEC) released a proposed rulemaking limiting nitrogen oxide (NOx) emissions from existing simple cycle and regenerative peaking combustion turbines with a nameplate capacity of 15 megawatts (MW) or greater during the ozone season (May 1 \u2013 October 31).  <\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/emissions-limits-impact-power-generators\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-636068142\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-636068142-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC to Modify Standard and Develop Compliance Guidance to Accommodate Inverter-Based Generation Technologies<\/h3>\n                                                <h4 class=\"hidden-md-down\">f\u00e9vrier 20, 2019<\/h4>\n                                                <p class=\"image-card__description\">Renewable energy systems have&#160;dramatically changed the power generation resource mix. These new generation technologies no longer involve directly coupled rotating generators which were once standard in the industry. Now, inverters that change Direct Current (DC) electricity to the Alternating Current (AC) electricity suitable for delivery via AC transmission systems are becoming more prevalent, raising reliability&hellip;<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-to-modify-standard-and-develop-compliance-guidance-to-accommodate-inverter-based-generation-technologies\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"GettyImages-1493729544\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1493729544-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/regulatory-updates\/\" class=\"image-card__category\">Regulatory Updates<\/a>                                                <h3>NERC Identifies New Reliability Risk due to Utility Scale Solar Generation Inverter Design<\/h3>\n                                                <h4 class=\"hidden-md-down\">juin 13, 2017<\/h4>\n                                                <p class=\"image-card__description\">NERC has released a report documenting its findings and recommendations related to reliability risks from utility scale solar generation projects with implications for PRC-024 compliance, as well as generation, interconnection and protection system technologies.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/nerc-identifies-new-reliability-risk-due-to-utility-scale-solar-generation-inverter-design\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Engineers install solar cells on the roof of factory\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-2138613698-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/news\/\" class=\"image-card__category\">News<\/a>                                                <h3>TRC\u2019s Top 12 Predictions for The Energy Industry in 2017<\/h3>\n                                                <h4 class=\"hidden-md-down\">D\u00e9cembre 12, 2016<\/h4>\n                                                <p class=\"image-card__description\">LOWELL, MA, TRC Companies Inc., a recognized leader in engineering, environmental consulting and construction-management services, today released its top 12 predictions for the energy, utility, and oil and gas sectors for 2017, including robust funding for utility mergers and acquisitions and infrastructure upgrades as well as big shifts in power plant and pipeline construction focus.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trcs-top-12-predictions-for-the-energy-industry-in-2017\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                                <div class=\"image-cards-slider-item fx-slide\">\n                                    <div class=\"image-card\">\n                                        <div class=\"image-card__image\">\n                                            <img decoding=\"async\" width=\"700\" height=\"467\" src=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-700x467.jpg\" class=\"attachment-homepage-image-card size-homepage-image-card\" alt=\"Two workers installing photovoltaic system.\" srcset=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-700x467.jpg 700w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-300x200.jpg 300w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-1024x683.jpg 1024w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-768x512.jpg 768w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-1536x1024.jpg 1536w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-2048x1365.jpg 2048w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-900x600.jpg 900w, https:\/\/www.trccompanies.com\/wp-content\/uploads\/2024\/09\/GettyImages-1463443600-750x500.jpg 750w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/>                                        <\/div>\n                                        <div class=\"image-card__info\">\n                                            <div class=\"image-card__info__top\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/news-and-insights-category\/news\/\" class=\"image-card__category\">News<\/a>                                                <h3>TRC Teams With BQ Energy for Award-Winning Solar Installation<\/h3>\n                                                <h4 class=\"hidden-md-down\">janvier 13, 2016<\/h4>\n                                                <p class=\"image-card__description\">TRC Companies has teamed with BQ Energy to develop the PatterSun solar installation, a project received a 2015 Chairman&rsquo;s Award from The Business Council of New York.<\/p>\n                                            <\/div>\n                                            <div class=\"image-card__info__bottom\">\n                                                <a href=\"https:\/\/www.trccompanies.com\/fr\/insights\/trc-teams-with-bq-energy-for-award-winning-solar-installation\/\" class=\"image-card__link\">En savoir plus<\/a>\n                                            <\/div>\n                                        <\/div>\n                                    <\/div>\n                                <\/div>\n                                                    <\/div>\n                <\/div>\n                    <\/div>\n    <\/div>\n<\/section>\n<!-- End Block: acf\/innerpage-news-and-insights -->\n\n<!-- Start Block: core\/paragraph -->\n<div class=\"container\"><div class=\"row\"><div class=\"col-xxs-12\">\n<p><\/p>\n<\/div><\/div><\/div>\n<!-- End Block: core\/paragraph -->","protected":false},"excerpt":{"rendered":"<p>TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated. <\/p>\n","protected":false},"featured_media":11407,"template":"","tags":[282,302],"news-and-insights-category":[380],"services-category":[1005,993],"custom_category":[],"class_list":["post-1120","news-and-insights","type-news-and-insights","status-publish","has-post-thumbnail","hentry","tag-power-generation","tag-remediation-engineering","news-and-insights-category-white-papers","services-category-electrical-and-power","services-category-remediation-materials-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites - TRC Companies<\/title>\n<meta name=\"description\" content=\"TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/\" \/>\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites - TRC Companies\" \/>\n<meta property=\"og:description\" content=\"TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/\" \/>\n<meta property=\"og:site_name\" content=\"TRC Companies\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-12T12:40:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-1024x673.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"673\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/\",\"name\":\"Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites - TRC Companies\",\"isPartOf\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png\",\"datePublished\":\"2022-11-22T16:29:37+00:00\",\"dateModified\":\"2024-12-12T12:40:29+00:00\",\"description\":\"TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.\",\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/#primaryimage\",\"url\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png\",\"contentUrl\":\"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png\",\"width\":1792,\"height\":1177},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.trccompanies.com\/fr\/#website\",\"url\":\"https:\/\/www.trccompanies.com\/fr\/\",\"name\":\"TRC Companies\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites - TRC Companies","description":"TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/","og_locale":"fr_CA","og_type":"article","og_title":"Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites - TRC Companies","og_description":"TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.","og_url":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/","og_site_name":"TRC Companies","article_modified_time":"2024-12-12T12:40:29+00:00","og_image":[{"width":1024,"height":673,"url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new-1024x673.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimation du temps de lecture":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/","url":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/","name":"Biotic and Abiotic Reduction to Achieve Groundwater Compliance at CCR Sites - TRC Companies","isPartOf":{"@id":"https:\/\/www.trccompanies.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/#primaryimage"},"image":{"@id":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/#primaryimage"},"thumbnailUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png","datePublished":"2022-11-22T16:29:37+00:00","dateModified":"2024-12-12T12:40:29+00:00","description":"TRC conducted two case studies to test different EA strategies. In both studies, chemical and biological reduction to stabilize metals at former CCR sites were evaluated.","inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.trccompanies.com\/fr\/insights\/biotic-and-abiotic-reduction-to-achieve-groundwater-compliance-at-ccr-sites\/#primaryimage","url":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png","contentUrl":"https:\/\/www.trccompanies.com\/wp-content\/uploads\/2022\/11\/coal-fueled-power-plant-facilty-new.png","width":1792,"height":1177},{"@type":"WebSite","@id":"https:\/\/www.trccompanies.com\/fr\/#website","url":"https:\/\/www.trccompanies.com\/fr\/","name":"TRC Companies","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.trccompanies.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"}]}},"_links":{"self":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1120","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights"}],"about":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/types\/news-and-insights"}],"version-history":[{"count":0,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights\/1120\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media\/11407"}],"wp:attachment":[{"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/media?parent=1120"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/tags?post=1120"},{"taxonomy":"news-and-insights-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/news-and-insights-category?post=1120"},{"taxonomy":"services-category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/services-category?post=1120"},{"taxonomy":"custom_category","embeddable":true,"href":"https:\/\/www.trccompanies.com\/fr\/wp-json\/wp\/v2\/custom_category?post=1120"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}